2025-02-12 Bijlage RIB - Achtergronddocument variantenstudie uitvoeringsmethoden
Tekst van het document
4 Complete works related to bascule
Maatregel 8
High Shipping closed
No hindrance to main channel
Uitvoeren gewichtsmeting Basculebrug High Shipping testing needed
Maatregel 9
A1: Full closure during deck replacement. 5 Demobilisation
Full closure of road (&cyle/foot)
Maatregel 6 Maatregel 6 Maatregel 10 Extra N/A
Rem reviseren Conserveren hoofdligger en dwarsdragers Conserveren hoofdligger en dwarsdragers Conserveren opleggingen Removal of work pontoon & other temporary works General demobilisation - removal of site compound etc
testing needed in kelder below deck
No hindrance to road/cycle/foot traffic (generally) closed
Temporary closure of road during testing of break and weight adjustments.
No hindrance
No hindrance
fiets + voetgangers
fiets + voetgangers
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A1 - Stage 2
SK-A1-001
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
joint works
subway works
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A1 - Stage 3
SK-A1-002
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
fiets + voetgangers
fiets + voetgangers
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A1 - Stage 3
SK-A1-003
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
Bijlage A-2 Option A2
Uitvoeringsvarianten
blad A-4
OPTION A2a
Uitvoeringsvarianten
blad A-5
METHOD
A2a
Construction
Stage
Method
Stage no.
A2: Cycle/Emergency services open
Hindance
Activities Stage Name
Reference
Scope
Notes
2 Works at Wisselstrook
Maatregel 6
Conserveren hoofdligger en dwarsdragers
above /below deck at wisselstrook
Vervangen voegdorpel Vervangen slijtlaag spitsstrook Install work ponton below bascule bridge
under wisselstrook
3 Upgrade Cyclepath
Maatregel 18 Maatregel 12 Extra Maatregel 2
Bouwlogistics
Road Traffic
Shipping Traffic
No hindrance
No hindrance
1 Mobilisation & set up
4 Repace HRB deck
Vervangen houten dek/balken fiets/voetpad
Maatregel 6
Conserveren hoofdligger en dwarsdragers
Maatregel 20 Voorzie de brug van een schoprand van 100 mm. Maatregel 18 Vervangen voegdorpel Maatregel 1 Vervangen stalen langsliggers hoofdrijbanen
Maatregel 4 Maatregel 3
Access from below from ponton. Worksite (light vehicle) access above on wisselstrook (axle limited)
Move cycle/foot traffic to wisselstrook; Wisselstook not functional for road traffic; HRB (2 High Shipping lanes open) closed
Lifting works from ponton + access from below from ponton. Worksite (light vehicle) access above on existing cyclepath (axle limited)
Vervangen stalen langsliggers fiets/voetpad
Maatregel 5
Vervangen houten dek/balken hoofdrijbanen Vervangen stalen voegovergangen hoofdrijbanen Basculebrug
Access to/from compound
Move cycle/foot traffic back to cyclepath; Wisselstook not functional for road traffic; HRB (2 High Shipping lanes open) closed
No hindrance to main channel
Probably a steel deck plate is provided above /below deck at cyclepath under cyclepath area
Move cycle/foot traffic back to cyclepath; Wisselstook not functional for road traffic; HRB (2 High Shipping lanes open) closed
Lifting works from kelder + access from below from ponton. Worksite access above on HRB.
Is this at the fixed bridge or the bascule?
Maatregel 7 Maatregel 6 Maatregel 6 Maatregel 18 Maatregel 15 Maatregel 19
Vernieuwen radkeerder Conserveren hoofdligger en dwarsdragers above deck Below deck Conserveren hoofdligger en dwarsdragers under HRB Vervangen voegdorpel Vervangen gehele constructie asfalt hoofdrijbaan Markeer de voegopening doormiddel van een witte streep. (geldt voor alle voegopeningen) Maatregel 21 Voorzie in een witte stopstreep waarachter de fietsers/bromfietsers zich dienen op te stellen. (beide zijden slagbomen basculebrug) Maatregel 22 Voorzie in een witte stopstreep waarachter het wegverkeer zich dient op te stellen. (locatie M21 en vaste brug bij stoplichten rijbaan Krimpen->Capelle) Maatregel 8 Uitvoeren gewichtsmeting Basculebrug 5 Finishes (below deck)
testing needed Maatregel 9
Rem reviseren testing needed
Maatregel 6 Conserveren hoofdligger en dwarsdragers Maatregel 10 Conserveren opleggingen Maatregel 16 Injecteren scheuren > 0.2mm (waarschijnlijk geen scope weg is van Capelle) Maatregel 17 Vervangen onderdelen betonschade onder voegdorpel (binnenzijde basculekelder) Extra Removal of work pontoon. 6 Demobilisation
2 lanes (HRB) open - one on cyclepath and one on wisselstrook. Cyclepath & pedestrians open Temporary closure of cyclepath during testing of break and weight adjustments.
High Shipping closed
Construction access below deck via ponton
No hindrance
Access to/from compound
Below deck
Can be done in earlier stages Can be done in earlier stages No hindrance
fiets + voetgangers
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A2-a - Stage 3A
SK-A2a-001
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
fiets + voetgangers
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A2-a - Stage 3B
SK-A2a-002
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
fiets + voetgangers
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A2-a - Stage 3C
SK-A2a-003
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
fiets + voetgangers
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A2-a - Stage 3D
SK-A2a-004
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
fiets + voetgangers
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A2-a - Stage 4
SK-A2a-005
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
OPTION A2b
Uitvoeringsvarianten
blad A-6
METHOD
A2b
Construction
Stage
Method
Stage no.
A2: Cycle/Emergency services open
Hindance
Activities Stage Name 1 Mobilisation & set up
Reference
Scope
Notes
Shipping Traffic
No hindrance
No hindrance
No hindrance
High Shipping closed
2 Works below deck / In kelder 3A
Works at Wisselstrook
Maatregel 6
Conserveren hoofdligger en dwarsdragers
above /below deck at wisselstrook HRB closed
Maatregel 18 Vervangen voegdorpel
under wisselstrook Pedestrian & Cyclists open Emergency vehicles (one lane) open
Maatregel 12 Vervangen slijtlaag spitsstrook Install work ponton below bascule bridge Extra 3B
Remove HRB decking
Maatregel 2
Vervangen stalen langsliggers fiets/voetpad
Maatregel 5
Vervangen houten dek/balken fiets/voetpad
Maatregel 6
Conserveren hoofdligger en dwarsdragers
HRB closed
3C
Works at Cyclepath
Maatregel 20 Voorzie de brug van een schoprand van 100 mm. Maatregel 18 Vervangen voegdorpel Maatregel 2 Vervangen stalen langsliggers fiets/voetpad
Probably a steel deck plate is Pedestrian & Cyclists open provided above /below deck at Emergency vehicles (one lane) open cyclepath
3D
Install HRB Decking
Vervangen houten dek/balken fiets/voetpad
Maatregel 6
Conserveren hoofdligger en dwarsdragers
Maatregel 20 Voorzie de brug van een schoprand van 100 mm. Maatregel 18 Vervangen voegdorpel Maatregel 1 Vervangen stalen langsliggers hoofdrijbanen
Maatregel 4 Maatregel 3
Vervangen houten dek/balken hoofdrijbanen Vervangen stalen voegovergangen hoofdrijbanen Basculebrug
Maatregel 7 Maatregel 6 Maatregel 6 Maatregel 18 Maatregel 15 Maatregel 19
Vernieuwen radkeerder Conserveren hoofdligger en dwarsdragers Conserveren hoofdligger en dwarsdragers Vervangen voegdorpel Vervangen gehele constructie asfalt hoofdrijbaan Markeer de voegopening doormiddel van een witte streep. (geldt voor alle voegopeningen) Maatregel 21 Voorzie in een witte stopstreep waarachter de fietsers/bromfietsers zich dienen op te stellen. (beide zijden slagbomen basculebrug) Maatregel 18 Vervangen voegdorpel Maatregel 22 Voorzie in een witte stopstreep waarachter het wegverkeer zich dient op te stellen. (locatie M21 en vaste brug bij stoplichten rijbaan Krimpen->Capelle) Maatregel 8 Uitvoeren gewichtsmeting Basculebrug
4 Finishes (below deck)
Probably a steel deck plate is Pedestrian & Cyclists open provided above /below deck at Emergency vehicles (one lane) open cyclepath
Maatregel 9
High Shipping closed No hindrance to main channel
Move cycle/foot traffic back to cyclepath; Wisselstook not functional for road traffic; HRB (2 High Shipping lanes open) closed
Lifting works from ponton + access from below from ponton. Worksite (light vehicle) access above on existing cyclepath (axle limited)
Lifting works from ponton + access from below from ponton. Worksite (light vehicle) access above on existing cyclepath (axle limited)
Lifting works from kelder + access from below from ponton. Worksite access above on HRB.
Is this at the fixed bridge or the bascule? above deck Below deck under HRB
under cyclepath area
Rem reviseren testing needed
5 Demobilisation
High Shipping closed No hindrance to main channel
Access from below from ponton. Worksite (light vehicle) access above on wisselstrook (axle limited)
under HRB
testing needed
Maatregel 6 Conserveren hoofdligger en dwarsdragers Maatregel 10 Conserveren opleggingen Maatregel 16 Injecteren scheuren > 0.2mm (waarschijnlijk geen scope weg is van Capelle) Maatregel 17 Vervangen onderdelen betonschade onder voegdorpel (binnenzijde basculekelder) Extra Removal of work pontoon.
High Shipping closed No hindrance to main channel
Access to/from compound
under HRB
HRB closed
Maatregel 5
Bouwlogistics
Road Traffic
2 lanes (HRB) open - one on cyclepath and one on wisselstrook. Cyclepath & pedestrians open Temporary closure of cyclepath during testing of break and weight adjustments.
High Shipping closed
Construction access below deck via ponton
No hindrance
Access to/from compound
Below deck
Can be done in earlier stages Can be done in earlier stages No hindrance
fiets + voetgangers
fiets + voetgangers
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A2b - Phase 2
SK-A2b-001
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A2b - Phase 3 (part)
SK-A2b-002
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
Floating crane / shear-leg. Needs to lift over control tower
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A2b - Stage 3 (part)
SK-A2b-003
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A2b - Phase 4
SK-A2b-004
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A2b - Phase 5
SK-A2b-005
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
Bijlage A-3 Option A3
Uitvoeringsvarianten
blad A-7
METHOD
A3
Construction
Stage
Method
Stage no.
A3: HRB traffic on cantlievers
Hindance
Activities Stage Name
Reference
Scope
Maatregel 2
Vervangen stalen langsliggers fiets/voetpad
Notes
Bouwlogistics
Road Traffic
Shipping Traffic
No hindrance
No hindrance
1 Mobilisation & set up 2 Upgrade Cyclepath
Move cycle/foot traffic to wisselstrook; Wisselstook not functional for road traffic; HRB (2 High Shipping lanes open) closed
3 Upgrade Wisselstrook
Maatregel 5
Vervangen houten dek/balken fiets/voetpad
Maatregel 6 Maatregel 20 Maatregel 18 Extra Maatregel 1
Conserveren hoofdligger en dwarsdragers Voorzie de brug van een schoprand van 100 mm. Vervangen voegdorpel Install work ponton below bascule bridge
under cyclepath area
Vervangen stalen langsliggers hoofdrijbanen
Conserveren hoofdligger en dwarsdragers
Maatregel 18 Vervangen voegdorpel Maatregel 12 Vervangen slijtlaag spitsstrook Extra Strengthening of consoles to wisselstrook Maatregel 8
under wisselstrook
testing needed Maatregel 9
Rem reviseren
Maatregel 4 Maatregel 3
Vervangen houten dek/balken hoofdrijbanen Vervangen stalen voegovergangen hoofdrijbanen Basculebrug
Maatregel 6 Maatregel 10 Maatregel 7 Maatregel 16
Conserveren hoofdligger en dwarsdragers Conserveren opleggingen Vernieuwen radkeerder Injecteren scheuren > 0.2mm (waarschijnlijk geen scope weg is van Capelle)
Lifting works from ponton + access from below from ponton. Worksite (light vehicle) access above on wisselstrook (axle limited)
above deck
Uitvoeren gewichtsmeting Basculebrug
4 Repace HRB deck
Lifting works from ponton + access from below from ponton. Worksite (light vehicle) access above on existing cyclepath (axle limited)
No hindrance to main channel
Probably a steel deck plate is provided above deck
Move cycle/foot traffic back to cyclepath; Wisselstook not functional for road traffic; HRB (2 High Shipping lanes open) closed
Maatregel 6
Access to/from compound
testing needed
2 lanes (HRB) open - one on cyclepath and one on wisselstrook. Cyclepath & pedestrians open Temporary closure of cyclepath during testing of break and weight adjustments.
High Shipping closed
Construction traffic on-off via HRB
No hindrance
Access to/from compound
Is this at the fixed bridge or the bascule? Below deck
Can be done in earlier stages
Maatregel 19 Markeer de voegopening doormiddel van een witte streep. (geldt voor alle voegopeningen) Maatregel 21 Voorzie in een witte stopstreep waarachter de fietsers/bromfietsers zich dienen op te stellen. (beide zijden slagbomen basculebrug) Maatregel 22 Voorzie in een witte stopstreep waarachter het wegverkeer zich dient op te stellen. (locatie M21 en vaste brug bij stoplichten rijbaan Krimpen->Capelle) Maatregel 17 Vervangen onderdelen betonschade onder voegdorpel (binnenzijde Can be done in earlier stages basculekelder) Under HRB Maatregel 18 Vervangen voegdorpel Maatregel 15 Vervangen gehele constructie asfalt hoofdrijbaan Extra Removal of work pontoon. 5 Demobilisation
No hindrance
joint works
subway works
strengthening of console + new deck plate
fiets + voetgangers
conservation of main beam above deck?
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A3 - Stage 2
SK-A3-001
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
subway works joint works
strengthening of console + new deck plate
fiets + voetgangers
fiets + voetgangers
conservation of main beam above deck?
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A3 - Stage 3
SK-A3-002
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
subway works
joint works
barrier/protection needed here?
fiets fiets
voetgangers
voetgangers
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A3 - Stage 4
SK-A3-003
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
Bijlage A-4 Option A4
Uitvoeringsvarianten
blad A-8
METHOD
A4
Construction
Stage
Method
Stage no.
A4: HRB traffic high level bailey bridge.
Hindance
Activities Stage Name
Reference
Scope
Maatregel 2
Vervangen stalen langsliggers fiets/voetpad
Notes
Bouwlogistics
Road Traffic
Shipping Traffic
No hindrance
No hindrance
1 Mobilisation & set up 2 Upgrade Cyclepath
Move cycle/foot traffic to wisselstrook; Wisselstook not functional for road traffic; HRB (2 High Shipping lanes open) closed
Maatregel 5
3 Replace Deck HRB
No hindrance to main channel
Vervangen houten dek/balken fiets/voetpad
Maatregel 10 Conserveren opleggingen Maatregel 20 Voorzie de brug van een schoprand van 100 mm. Maatregel 17 Vervangen onderdelen betonschade onder voegdorpel (binnenzijde basculekelder) Maatregel 18 Vervangen voegdorpel Install work ponton below bascule bridge Extra Maatregel 1 Vervangen stalen langsliggers hoofdrijbanen
under cyclepath area under cyclepath area
Move cycle/foot traffic back to cyclepath; Wisselstook not functional for road traffic; HRB (2 High Shipping lanes open) closed
Maatregel 4
Vervangen houten dek/balken hoofdrijbanen
Maatregel 3
Vervangen stalen voegovergangen hoofdrijbanen Basculebrug
Maatregel 6 Extra
Conserveren hoofdligger en dwarsdragers Installation of highlevel bailey bridge including approach ramps. Temporary modifications to tie-ins at Ketensedijk junction
Maatregel 8
Uitvoeren gewichtsmeting Basculebrug
4 Finishes
Lifting works from ponton + access from below from ponton. Worksite (light vehicle) access above on wisselstrook (axle limit)
Full closure to road traffic during installation of bailey bridge Is this at the fixed bridge or the HRB North: off-ramp at Ketensedijk closed bascule? HRB South: on-ramp at Ketensedijk closed Above deck & below deck
testing needed Maatregel 9
Access to/from compound Lifting works from ponton + access from below from ponton. Worksite (light vehicle) access above on cyclepath (axle limit)
Rem reviseren testing needed
Full closure of HRB + Wisselstrook. Cyclepath and (light) emergency vehicles open Temporary closure of cyclepath during testing of break and weight adjustments.
High Shipping closed
Construction traffic on-off via HRB
No hindrance
Access to/from compound
Maatregel 21 Voorzie in een witte stopstreep waarachter de fietsers/bromfietsers zich dienen op te stellen. (beide zijden slagbomen basculebrug) Maatregel 22 Voorzie in een witte stopstreep waarachter het wegverkeer zich dient op te stellen. (locatie M21 en vaste brug bij stoplichten rijbaan Krimpen->Capelle) Maatregel 17 Vervangen onderdelen betonschade onder voegdorpel (binnenzijde basculekelder) Maatregel 18 Vervangen voegdorpel Maatregel 15 Vervangen gehele constructie asfalt hoofdrijbaan Maatregel 12 Vervangen slijtlaag spitsstrook Extra Removal of highlevel bailey bridge including approach ramps. Removal of temporary modifications to tie-ins at Ketensedijk junction Removal of work pontoon. 5 Demobilisation
No hindrance
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A4 - Stage 2
SK-A4-001
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A4 - Stage 3
SK-A4-002
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A4 - Stage 4
SK-A4-003
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A4 - Details
SK-A4-004
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
Bijlage A-5 Option A5
Uitvoeringsvarianten
blad A-9
METHOD
A5
Construction
Stage
Method
Stage no.
A5: Offsite Revovation: Road closed / High shipping open. A5: Offsite Revovation: Road closed / High shipping open.
Hindance
Activities Stage Name
Reference
Scope
1 Mobilisation & set up
N/A
General prepartation - set up of compound etc
2 Preparation for leaf removal
Maatregel 16 Injecteren scheuren > 0.2mm (waarschijnlijk geen scope weg is van Capelle)
Notes
Shipping Traffic
No hindrance
No hindrance
No hindrance to road/cycle/foot traffic
Maatregel 17 Vervangen onderdelen betonschade onder voegdorpel (binnenzijde basculekelder) Extra Temporary support to counterweight in kelder Extra Temporary supports to leaf at front wall and nose bearings Install work ponton below bascule bridge Extra A5: Offsite Revovation: Road closed / High shipping open.
3 Remove Leaf
Maatregel 1
Vervangen stalen langsliggers hoofdrijbanen
A5: Offsite Revovation: Road closed / High shipping open.
4 Complete works related to bascule
Maatregel 6
Conserveren hoofdligger en dwarsdragers
above deck
Maatregel 2 Maatregel 5 Maatregel 6 Maatregel 20 Maatregel 18 Maatregel 4 Maatregel 3
Vervangen stalen langsliggers fiets/voetpad Vervangen houten dek/balken fiets/voetpad Conserveren hoofdligger en dwarsdragers Voorzie de brug van een schoprand van 100 mm. Vervangen voegdorpel Vervangen houten dek/balken hoofdrijbanen Vervangen stalen voegovergangen hoofdrijbanen Basculebrug
off-site off-site above deck off-site full width off-site Is this at the fixed bridge or the bascule? off-site
testing needed Maatregel 9
Rem reviseren testing needed
A5: Offsite Revovation: Road closed / High 5 Demobilisation shipping open.
Maatregel 10 Conserveren opleggingen Extra Removal of work pontoon & other temporary works General demobilisation - removal of site compound etc N/A
High Shipping closed No hindrance to main channel
off-site
Full closure of road (&cyle/foot)
Maatregel 7 Vernieuwen radkeerder Maatregel 15 Vervangen gehele constructie asfalt hoofdrijbaan Maatregel 19 Markeer de voegopening doormiddel van een witte streep. (geldt voor alle voegopeningen) Maatregel 21 Voorzie in een witte stopstreep waarachter de fietsers/bromfietsers zich dienen op te stellen. (beide zijden slagbomen basculebrug) Maatregel 22 Voorzie in een witte stopstreep waarachter het wegverkeer zich dient op te stellen. (locatie M21 en vaste brug bij stoplichten rijbaan Krimpen->Capelle) Maatregel 12 Vervangen slijtlaag spitsstrook Cutting of main girders near front wall Extra Extra Removal of existing leaf by barges Extra Transport of existing leaf to and from renovation location Extra Return renovated leaf to bridge site Extra Make new connection to main girders Maatregel 8 Uitvoeren gewichtsmeting Basculebrug
Bouwlogistics
Road Traffic
High Shipping open No hindrance to main channel
High Shipping No hindrance to road/cycle/foot traffic (generally) closed Temporary closure of road during testing of break and weight adjustments.
No hindrance
No hindrance
Access to/from compound Access into kelder from site compound. Access below bridge from ponton.
Construction traffic to access the bridge site using N210 - from either direction (no access across bascule). Access to bascule from ponton / site compound.
Access into kelder from site compound. Access below bridge from ponton.
Access to/from compound
fiets + voetgangers fiets + voetgangers
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A5 - Stage 2
SK-A5-001
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
joint works
subway works
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A5 - Stage 3
SK-A5-002
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
fiets + voetgangers fiets + voetgangers
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A5 - Stage 4
SK-A5-003
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
Bijlage A-6 Option A6
Uitvoeringsvarianten
blad A-10
METHOD Construction
A6 Stage
Method
Stage no.
A6: Offsite Revovation: Road Open / High shipping closed A6: Offsite Revovation: Road Open / High shipping closed
A6: Offsite Revovation: Road Open / High shipping closed
A6: Offsite Revovation: Road Open / High shipping closed
Reference N/A
Scope General prepartation - set up of compound etc
2 Preparation for leaf removal
Extra
Temporary support to counterweight in kelder
Extra
Temporary supports to leaf at front wall and nose bearings
Extra Extra
Install work ponton below bascule bridge Cutting of main girders near front wall
Extra
Removal of existing leaf by barges
Extra Extra Maatregel 3
Transport of existing leaf to renovation location Install temporary bailey bridges (incl small ramps) Vervangen stalen voegovergangen hoofdrijbanen Basculebrug
Maatregel 18 Maatregel 1
Vervangen voegdorpel Vervangen stalen langsliggers hoofdrijbanen
Maatregel 10 Maatregel 2 Maatregel 5 Maatregel 6 Maatregel 20 Maatregel 4 Maatregel 16
Conserveren opleggingen Vervangen stalen langsliggers fiets/voetpad Vervangen houten dek/balken fiets/voetpad Conserveren hoofdligger en dwarsdragers Voorzie de brug van een schoprand van 100 mm. Vervangen houten dek/balken hoofdrijbanen Injecteren scheuren > 0.2mm (waarschijnlijk geen scope weg is van Capelle) Vervangen onderdelen betonschade onder voegdorpel (binnenzijde basculekelder) Vernieuwen radkeerder Vervangen gehele constructie asfalt hoofdrijbaan
3 Remove Leaf
4 Renovate Leaf (off site)
Maatregel 17
A6: Offsite Revovation: Road Open / High shipping closed
5 Re-install Leaf
Maatregel 7 Maatregel 15
Maatregel 19 Maatregel 21 Maatregel 22
A6: Offsite Revovation: Road Open / High shipping closed
A6: Offsite Revovation: Road Open / High shipping closed
Hindance
Activities Stage Name 1 Mobilisation & set up
6 Complete works related to bascule
7 Demobilisation
Maatregel 12 Maatregel 6 Extra Extra Extra Extra Maatregel 8
Markeer de voegopening doormiddel van een witte streep. (geldt voor alle voegopeningen) Voorzie in een witte stopstreep waarachter de fietsers/bromfietsers zich dienen op te stellen. (beide zijden slagbomen basculebrug) Voorzie in een witte stopstreep waarachter het wegverkeer zich dient op te stellen. (locatie M21 en vaste brug bij stoplichten rijbaan Krimpen->Capelle) Vervangen slijtlaag spitsstrook Conserveren hoofdligger en dwarsdragers Remove temporary (bailey) bridges Transport of renovate leaf from renovation location Position renovated leaf at bridge site Connect main girder at front wal location Uitvoeren gewichtsmeting Basculebrug
Maatregel 9
Rem reviseren
Extra N/A
Removal of work pontoon & other temporary works General demobilisation - removal of site compound etc
Notes
Bouwlogistics
Road Traffic
Shipping Traffic
No hindrance
No hindrance
Access to/from compound
No hindrance to road/cycle/foot traffic
High Shipping closed
Access into kelder from site compound. Access below bridge from ponton.
No hindrance to main channel Full closure of road (&cyle/foot)
High Shipping closed
Construction traffic to access the bridge site using N210 - from either direction (no access across bascule). Access to bascule from ponton / site compound.
No hindrance to main channel
Is this at the fixed bridge or the bascule? full width No hindrance to road/cycle/foot traffic (generally) High Shipping off-site closed
Access into kelder from site compound. Access below bridge from ponton. No construction traffic on road
off-site off-site off-site off-site off-site kelder kelder off-site Full closure of road (&cyle/foot)
High Shipping closed
Construction traffic to access the bridge site using N210 - from either direction (no access across bascule). Access to bascule from ponton / site compound.
No hindrance to main channel
above deck
testing needed
testing needed
No hindrance to road/cycle/foot traffic (generally) High Shipping
closed
Access into kelder from site compound. Access below bridge from ponton.
No hindrance
Access to/from compound
Temporary closure of road during testing of break and weight adjustments. No hindrance
fiets + voetgangers fiets + voetgangers
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A6 - Phase 2
SK-A6-001
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A6 - Phase 3
SK-A6-002
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
fiets + voetgangers fiets + voetgangers
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A6 - Phase 4
SK-A6-003
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
joint works
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A6 - Phase 5
SK-A6-004
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
fiets + voetgangers fiets + voetgangers
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A6 - Phase 6
SK-a6-005
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
Bijlage A-7 Option A7
Uitvoeringsvarianten
blad A-11
METHOD
A7
Construction
Stage
Method
Stage no.
Hindance
Activities Stage Name
Reference
Scope General prepartation - set up of compound etc
A7: New Leaf (like-for-like)
1 Mobilisation & set up
N/A
A7: New Leaf (like-for-like)
2 Preparation for leaf removal
Maatregel 16 Injecteren scheuren > 0.2mm (waarschijnlijk geen scope weg is van Capelle)
Notes
Shipping Traffic
No hindrance
No hindrance
No hindrance to road/cycle/foot traffic
Maatregel 17 Vervangen onderdelen betonschade onder voegdorpel (binnenzijde basculekelder) Extra Temporary support to counterweight in kelder Extra Temporary supports to leaf at front wall and nose bearings Install work ponton below bascule bridge Extra A7: New Leaf (like-forlike)
3 Replace existing leaf with new leaf
Maatregel 1
Vervangen stalen langsliggers hoofdrijbanen
A7: New Leaf (like-forlike)
4 Complete works related to bascule
Maatregel 6
Conserveren hoofdligger en dwarsdragers
off-site
Maatregel 2 Maatregel 5 Maatregel 6 Maatregel 20 Maatregel 18 Maatregel 4 Maatregel 3
Vervangen stalen langsliggers fiets/voetpad Vervangen houten dek/balken fiets/voetpad Conserveren hoofdligger en dwarsdragers Voorzie de brug van een schoprand van 100 mm. Vervangen voegdorpel Vervangen houten dek/balken hoofdrijbanen Vervangen stalen voegovergangen hoofdrijbanen Basculebrug
off-site off-site above kelder deck off-site full width off-site Is this at the fixed bridge or the bascule? off-site
testing needed
A7: New Leaf (like-for-like)
5 Demobilisation
Maatregel 9
Rem reviseren
Maatregel 6 Maatregel 10 Extra N/A
Conserveren hoofdligger en dwarsdragers Conserveren opleggingen Removal of work pontoon & other temporary works General demobilisation - removal of site compound etc
High Shipping closed No hindrance to main channel
off-site
Full closure of road (&cyle/foot)
Maatregel 7 Vernieuwen radkeerder Maatregel 15 Vervangen gehele constructie asfalt hoofdrijbaan Maatregel 19 Markeer de voegopening doormiddel van een witte streep. (geldt voor alle voegopeningen) Maatregel 21 Voorzie in een witte stopstreep waarachter de fietsers/bromfietsers zich dienen op te stellen. (beide zijden slagbomen basculebrug) Maatregel 22 Voorzie in een witte stopstreep waarachter het wegverkeer zich dient op te stellen. (locatie M21 en vaste brug bij stoplichten rijbaan Krimpen->Capelle) Maatregel 12 Vervangen slijtlaag spitsstrook Cutting of main girders near front wall Extra Extra Removal of existing leaf by barges Extra Transport of existing leaf away from site / transpot of new leaf to site. Extra Place new leaf at bridge site Extra Make new connection to main girders Maatregel 8 Uitvoeren gewichtsmeting Basculebrug
Bouwlogistics
Road Traffic
testing needed in kelder
High Shipping open No hindrance to main channel
High Shipping No hindrance to road/cycle/foot traffic (generally) closed Temporary closure of road during testing of break and weight adjustments.
No hindrance
No hindrance
Access to/from compound Access into kelder from site compound. Access below bridge from ponton.
Construction traffic to access the bridge site using N210 - from either direction (no access across bascule). Access to bascule from ponton / site compound.
Access into kelder from site compound. Access below bridge from ponton.
Access to/from compound
fiets + voetgangers fiets + voetgangers
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A7 - Stage 2
SK-A7-001
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
joint works
subway works
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A7 - Stage 3
SK-A7-002
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
fiets + voetgangers fiets + voetgangers
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A7 - Stage 4
SK-A7-003
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
Bijlage A-8 Option A8
Uitvoeringsvarianten
blad A-12
METHOD
A8
Construction
Stage
Method
Stage no.
A8: Renovation of Bascule bridge (replacement) A8: Renovation of Bascule bridge (replacement)
Hindance
Activities Stage Name
Reference
Scope
1 Mobilisation & set up
N/A
General prepartation - set up of compound etc
2 Preparation for leaf removal
Maatregel 16 Injecteren scheuren > 0.2mm (waarschijnlijk geen scope weg is van Capelle)
Notes
Shipping Traffic
No hindrance
No hindrance
No hindrance to road/cycle/foot traffic
Maatregel 17 Vervangen onderdelen betonschade onder voegdorpel (binnenzijde basculekelder) Extra Temporary supports to roof & advance works for new roof Advance works for replacement of mechnial, E-IA systems Install work ponton below bascule bridge / attachement points Extra A8: Renovation of Bascule bridge (replacement)
3 Replace existing bascule with new bascule Maatregel 18 Vervangen voegdorpel
High Shipping closed No hindrance to main channel
full width
with new leaf
Full closure of road (&cyle/foot)
Maatregel 3
A8: Renovation of Bascule bridge (replacement)
Bouwlogistics
Road Traffic
4 Complete works related to bascule
A8: Renovation of Bascule bridge (replacement) 5 Demobilisation
Vervangen stalen voegovergangen hoofdrijbanen Basculebrug
Is this at the fixed bridge or the bascule?
High Shipping open No hindrance to main channel
Maatregel 15 Vervangen gehele constructie asfalt hoofdrijbaan Maatregel 19 Markeer de voegopening doormiddel van een witte streep. (geldt voor alle voegopeningen) Maatregel 21 Voorzie in een witte stopstreep waarachter de fietsers/bromfietsers zich dienen op te stellen. (beide zijden slagbomen basculebrug) Maatregel 22 Voorzie in een witte stopstreep waarachter het wegverkeer zich dient op te stellen. (locatie M21 en vaste brug bij stoplichten rijbaan Krimpen->Capelle) Maatregel 12 Vervangen slijtlaag spitsstrook Extra Remove ashalt Extra Remove portion of concrete roof. Extra Removal of existing bascule (including counterweight ) by barges and jacking/ballasting system (5m delta) Extra Transport of existing leaf away from site / transpot of new leaf to site. Extra Installation of new opzetselt / adjustments at hoofddraaipunt supports. Extra Installation of new bascule (including counterweight ) by barges and jacking/ballasting system (5m delta) Extra Installation of new concrete roof Extra Install asphalt, vehicle restraint systems etc. Extra Installation of mechanical and E-IA systems High Shipping
Access to/from compound Access into kelder from site compound. Access below bridge from ponton.
Construction traffic to access the bridge site using N210 - from either direction (no access across bascule). Access to bascule from ponton / site compound.
Access into kelder from site compound. Access below bridge from ponton.
No hindrance to road/cycle/foot traffic (generally) closed
Extra
Fine tuning of weight-balance
Extra Extra Extra N/A
Completion of works at tandbaan testing and CE marking Removal of work pontoon & other temporary works General demobilisation - removal of site compound etc
Temporary closure of road during testing processes.
No hindrance
No hindrance
Access to/from compound
fiets + voetgangers fiets + voetgangers
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A8 - Stage 2
SK-A8-001
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
joint works
subway works
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A8 - Stage 3
SK-A8-002
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
fiets + voetgangers fiets + voetgangers
Job Title
Job No.
Algerabrug
303033-00
Sketch Title
Sketch No.
Option A8 - Stage 4
SK-A8-003
Purpose of Issue
Scale
For Information
AS SHOWN
By
Checked
Revision
Date
01
06/08/24
Bijlage B
Uitvoeringsvarianten
Outline Construction Planning
blad B-13
Bijlage B-1 Option A1
Uitvoeringsvarianten
blad B-14
OPTION A1: Large Crane
Uitvoeringsvarianten
blad B-15
Algerabrug: Concept Planning Option A1 (Large Crane) ID
Task Mode 1
Task Name
Duration
Phasing
88.1 days
2
Fase 1 - Wegverkeer en scheepvaart niet gestremd10 days
5
Fase 2 - Scheepvaart onder basculebrug gestremd 10.5 days
8
Fase 3 - Wegverkeer en scheepvaart gestremd
11
Fase 4 - Scheepvaart onder basculebrug 29.49 days gestremd + short duration hindrance to wegverkeer Fase 5 - Wegverkeer en scheepvaart niet gestremd10 days
14
Mobilisation
10 days
18
Traffic Management (Local)
68.1 days
19
Set-up traffic management for channel closure
0.5 days
20
Set-up traffic management for full road closure replacement
0.5 days
21
Remove traffic management for deck replacement 0.5 days
22
Remove traffic management for channel closure
24 25 26 27
28
Above Deck Works Hoofdrijbaan - boven dek Bascule Deck Replacement Works - Leaf Removal of purlins+deck
S
07 Sep '26 M T W
T
F
S
S
14 Sep '26 M T W
T
F
S
S
21 Sep '26 M T W
T
F
S
S
28 Sep '26 M T W
T
F
S
S
05 Oct '26 M T W
T
F
S
S
12 Oct '26 M T W
T
F
S
S
19 Oct '26 M T W
T
F
S
S
26 Oct '26 M T W
T
F
S
S
02 Nov '26 M T W
T
F
S
S
09 Nov '26 M T W
T
F
3 days
1 day 2 days
31
Stralen en reinigen (Chrome 6 measures) - 11 days full deck
32
NDT & local repairs
3 days
33
Painting (primer + 2 coats) : above deck
3 days
34
Remove enclosure(s) - roof
1 day
Lift in deck (single lift)
37
Drill holes in cross girder/bracing & bolting 2 days
3 days 2 days
Replace asphalt
Lay new asphalt
Whitelines
1 day
Conserveren bovenkant consoles part of leaf works
56
Nieuwe dek aanbrengen
25.11 days
59
Bolting purlins to consoles
2 days
60
Verven witte stopstrepen op voet/fietspad
1 day
Verwijderen bestaande slijtlaag (fixed bridge) 1 day Aanbrengen nieuwe slijtlaag (fixed bridge)
65
Vervangen voegovergangen fietspad (part of 0.01 days new deck)
Strengthening Console
3 days
Strengthening Console
68
Above deck works
3 days
Above deck works
6 days 1 day
Aanleggen nieuwe slijtlaag
2 days
Vervangen voegovergangen wisselstrook
2 days
Verven witte strepen bij de voegen
1 day
74
Below Deck Works Set-up large crane
5 days
Set-up large crane
77
Strengthening Consoles (Wisselstrook)
7 days
Strengthening Consoles (Wisselstrook)
7 days
Below deck works
Conservation main girder at kelder
13 days
Stralen en reinigen staalconstructie
7 days
Stralen en reinigen staalconstructie
Aanbrengen grondlaag
2 days
Aanbrengen grondlaag
83
Aanbrengen dubbele toplaag
4 days
84
Conservation leaf (below deck)
19 days 0.1 days
86
Aanbrengen grondlaag
2 days
Aanbrengen dubbele toplaag
4 days
87 88
Voegdorpel en voegovergangen
15.5 days
Vervangen onderdelen betonschade onder voegdorpel(binnenzijde basculekelder)
10 days
90
Vervangen voegdorpel
5 days
91
Andere werkzaamheden
67.6 days
89
92
Reviseren rem
5 days
93
Gewichtsmeting basculebrug
5 days
94 95
Weighing of bridge
2 days
Adjustments to Counterweight
3 days
96
Testing of bridge opening
2 days
97
Injecteren scheuren in Kelder > 0.2mm
10 days
98
Conserveren voor opleggingen basculebrug
3 days
99 100 101 102 103
Stralen en reinigen staalconstructie
0.75 days
Aanbrengen grondlaag
0.5 days
Aanbrengen dubbele toplaag
1 day
Remove access provisions below deck De-mobilisation
Project: concept uitvoerings planning option A1_largecrane Date: Wed 30/10/24
5 days 10 days
S
S
25 Jan '27 M T W
T
F
S
S
01 Feb '27 M T W
T
F
S
S
08 Feb '27 M T
Conserveren hoofdligger en dwarsdragers basculebrug (below deck)
82
Stralen en reinigen staalconstructie (part of above deck works)
F
Conservation main girder at kelder
81
85
T
Below Deck Works
76
80
18 Jan '27 M T W
Verven witte strepen bij de voegen
Prepare access provisions below deck
19 days
S
Vervangen voegovergangen wisselstrook
10 days
Below deck works
S
Vervangen slitjlaag Wisselstrook
67.6 days
Conserveren hoofdligger en dwarsdragers basculebrug (below deck)
F
Aanleggen nieuwe slijtlaag
Prepare access provisions below deck
79
T
Verwijderen bestaande slitjlaag
75
78
11 Jan '27 M T W
Wisselstrook - boven dek
67
Verwijderen bestaande slitjlaag
S
Vervangen voegovergangen fietspad (part of new deck)
11 days
Vervangen slitjlaag Wisselstrook
S
Aanbrengen nieuwe slijtlaag (fixed bridge)
Wisselstrook - boven dek
71
F
Verwijderen bestaande slijtlaag (fixed bridge)
66
70
T
Verven witte stopstrepen op voet/fietspad
2 days
69
04 Jan '27 M T W
Bolting purlins to consoles
Otherworks at Fietspad
64
S
Nieuwe dek aanbrengen
Voorzie de brug van een schoprand van 100mm (Fietspad only)
63
S
Lift-in new deck (single lift)
0.01 days
Voorzie de brug van een schoprand van 100mm (Fietspad only)
F
Transfer railings from old deck to new deck (off bridge)
3 days
62
T
Lift out of existing dek (single unit)
0.1 days
1 day
28 Dec '26 M T W
Fietspad - boven dek
0.1 days
2 days
S
Lifting attachments & unbolting purlin connections
part of leaf works
Lift-in new deck (single lift)
S
Weghalen bestaande dek
55
Transfer railings from old deck to new deck (off bridge)
F
Whitelines
27.11 days
58
T
Fixed Bridge - boven dek
3 days
57
21 Dec '26 M T W
Aanbrengen nieuw radkeerder Vervangen hoekstalen Verwijderen bestaande hoekstalen
1 day
S
Verwijderen bestaande radkeerder
1 day
Lifting attachments & unbolting purlin connections 1 day
S
Finishes (for road opening)
1 day
2 days
F
Installation new deck
1 day
73
T
Drill holes in cross girder/bracing & bolting
Lay new asphalt
72
14 Dec '26 M T W
Lift in deck (single lift)
48
Otherworks at Fietspad
S
Remove enclosure(s) - roof
Remove existing asphalt
61
S
Painting (primer + 2 coats) : above deck
1 day
Lift out of existing dek (single unit)
F
NDT & local repairs
1 day
Aanbrengen nieuw radkeerder
Conserveren bovenkant consoles
T
Conservation (at Leaf)
3 days
54
07 Dec '26 M T W
Stralen en reinigen (Chrome 6 measures) - full deck
Remove existing asphalt
53
S
Set up enclosure(s)
47
52
S
Lift out deck (single lift)
1 day
Verwijderen bestaande radkeerder
Weghalen bestaande dek
F
Bascule Deck Replacement Works - Leaf
Vernieuwen radkeerder
Fietspad - boven dek
T
Removal of purlins+deck
Randafwerking basculebrug
51
30 Nov '26 M T W
Separate purlins from structure (Chrome 6 measures)
26.1 days
50
S
Remove traffic management for channel closure
26.1 days
49
S
Remove traffic management for deck replacement
Vernieuwen radkeerder
Replace asphalt
F
Set-up traffic management for full road closure replacement
Finishes (for road opening)
Fixed Bridge - boven dek
T
Fase 5 - Wegverkeer en scheepvaart niet gestremd
Randafwerking basculebrug
46
23 Nov '26 M T W
Traffic Management (Local)
40
45
S
Set-up traffic management for channel closure
39
Verwijderen bestaande hoekstalen
S
Mobilisation
38
44
F
Fase 4 - Scheepvaart onder basculebrug gestremd + short duration hindrance to wegverkeer
4 days
36
Vervangen hoekstalen
T
Fase 3 - Wegverkeer en scheepvaart gestremd
27.1 days
20.1 days
43
16 Nov '26 M T W
Fase 2 - Scheepvaart onder basculebrug gestremd
Hoofdrijbaan - boven dek
Set up enclosure(s)
42
S
Phasing
27.1 days
Conservation (at Leaf)
41
S
Fase 1 - Wegverkeer en scheepvaart niet gestremd
Above Deck Works
30
Installation new deck
S
27.11 days
29
35
F
0.5 days
Separate purlins from structure (Chrome 6 2 days measures) Lift out deck (single lift)
T
28.11 days
17
23
31 Aug '26 M T W
Aanbrengen dubbele toplaag Conservation leaf (below deck) Stralen en reinigen staalconstructie (part of above deck works) Aanbrengen grondlaag Aanbrengen dubbele toplaag Voegdorpel en voegovergangen Vervangen onderdelen betonschade onder voegdorpel(binnenzijde basculekelder) Vervangen voegdorpel Andere werkzaamheden Reviseren rem Gewichtsmeting basculebrug Weighing of bridge Adjustments to Counterweight Testing of bridge opening Injecteren scheuren in Kelder > 0.2mm Conserveren voor opleggingen basculebrug Stralen en reinigen staalconstructie Aanbrengen grondlaag Aanbrengen dubbele toplaag Remove access provisions below deck De-mobilisation Page 1
OPTION A1: Medium Crane
Uitvoeringsvarianten
blad B-16
Algerabrug: Concept Planning Option A1 (Medium Crane) ID
Task Mode
Task Name
Duration
Start
Finish
Phasing
86 days
Tue 01/09/26
Tue 29/12/26
2
Stage 1 - Wegverkeer en scheepvaart niet gestremd 10 days
Tue 01/09/26
Mon 14/09/26
5
Stage 2 - Scheepvaart onder basculebrug gestremd10.5 days
Mon 14/09/26
Tue 29/09/26
8
Fase 3 - Wegverkeer en scheepvaart gestremd
Tue 29/09/26
Tue 17/11/26
11
Fase 4 - Scheepvaart onder basculebrug 20.5 days gestremd + short duration hindrance to wegverkeer Fase 5 - Wegverkeer en scheepvaart niet gestremd10 days
Tue 17/11/26
Tue 15/12/26
Tue 15/12/26
Tue 29/12/26
1
14
35 days
17
Mobilisation
10 days
Tue 01/09/26
Mon 14/09/26
18
Traffic Management (Local)
66 days
Tue 15/09/26
Tue 15/12/26
31 Aug '26 M T W
T
F
S
S
07 Sep '26 M T W
T
F
S
S
14 Sep '26 M T W
T
F
S
S
21 Sep '26 M T W
T
F
S
S
28 Sep '26 M T W
T
F
S
S
05 Oct '26 M T W
T
F
S
S
12 Oct '26 M T W
T
F
S
S
19 Oct '26 M T W
T
F
S
S
26 Oct '26 M T W
T
F
S
S
02 Nov '26 M T W
T
F
S
S
09 Nov '26 M T W
T
F
S
S
16 Nov '26 M T W
T
F
S
S
23 Nov '26 M T W
Tue 15/09/26
Tue 29/09/26
Tue 29/09/26
Tue 17/11/26
Tue 17/11/26
22
Remove traffic management for channel closure
0.5 days
Tue 15/12/26
Tue 15/12/26
34 days
Wed 30/09/26
Mon 16/11/26
Above Deck Works
34 days
Wed 30/09/26
Mon 16/11/26
Hoofdrijbaan - boven dek
34 days
Wed 30/09/26
Mon 16/11/26
Removal of purlins+deck
5 days
Wed 30/09/26
Tue 06/10/26
Removal of rij-ijzers
1 day
Wed 30/09/26
Wed 30/09/26
Cutting timber deck
1 day
Thu 01/10/26
Thu 01/10/26
Separate purlins from structure (Chrome 6 2 days measures) Lift out purlins + deck
29
Bascule Deck Replacement Works - Leaf
Tue 06/10/26 Tue 03/11/26
32
Set up enclosure(s)
2 days
Wed 07/10/26
Thu 08/10/26
33
Stralen en reinigen (Chrome 6 measures): 11 days full deck
Fri 09/10/26
Fri 23/10/26
Stralen en reinigen (Chrome 6 measures): full deck
34
NDT & local repairs
3 days
Mon 26/10/26
Wed 28/10/26
NDT & local repairs
35
Painting (primer + 2 layers): full deck
3 days
Thu 29/10/26
Mon 02/11/26
36
Remove enclosure(s) - roof
1 day
Tue 03/11/26
Tue 03/11/26
9 days
Mon 16/11/26 Wed 04/11/26
39
Drill holes in cross girder/bracing & bolting 2 days
Thu 05/11/26
Fri 06/11/26
40
Place timber planks+ initial connection
2 days
Fri 06/11/26
Mon 09/11/26
41
Complete connection (remaining bolts)
2 days
Tue 10/11/26
Wed 11/11/26
42
Install rij-ijzers (leaf)
1 day
Tue 10/11/26
Tue 10/11/26
43
Fill bolt holes with epoxy
1 day
Wed 11/11/26
Wed 11/11/26
44
Place wearing course
2 days
Thu 12/11/26
Fri 13/11/26
45
White-lines
1 day
Mon 16/11/26
Mon 16/11/26
3 days
Wed 30/09/26
Fri 02/10/26
2 days
Thu 05/11/26
Fri 06/11/26
1 day
Wed 07/10/26
Wed 07/10/26
Vervangen hoekstalen
1 day
Wed 07/10/26
Wed 07/10/26
Verwijderen bestaande hoekstalen
3 days
Mon 16/11/26
Thu 12/11/26
Mon 16/11/26
1 day
Thu 12/11/26
Fri 13/11/26
Lay new asphalt
1 day
Fri 13/11/26
Mon 16/11/26
Lay new asphalt Whitelines
60
Whitelines
Lift out of existing dek (single unit)
1 day
Mon 16/11/26
Mon 16/11/26
29.01 days
Wed 30/09/26
Tue 10/11/26
2 days
Wed 30/09/26
Thu 01/10/26
1 day
Wed 30/09/26
Wed 30/09/26
1 day
Wed 07/10/26
Conserveren bovenkant consoles
Wed 07/10/26
Wed 07/10/26
Part of leaf works
63
Nieuwe dek aanbrengen
27.01 days
Fri 02/10/26
Tue 10/11/26
2 days
Fri 02/10/26
Mon 05/10/26
1 day
Wed 04/11/26
Wed 04/11/26
66
Bolting purlins to consoles
2 days
Thu 05/11/26
Fri 06/11/26
67
Verven witte stopstrepen op voet/fietspad
1 day
Mon 09/11/26
Tue 10/11/26
3.01 days
Wed 04/11/26
Mon 09/11/26
0.01 days
68
Otherworks at Fietspad
69
Voorzie de brug van een schoprand van 100mm (Fietspad only)
Mon 09/11/26
Mon 09/11/26
70
Verwijderen bestaande slijtlaag (fixed bridge) 1 day
Wed 04/11/26
Thu 05/11/26
71
Aanbrengen nieuwe slijtlaag (fixed bridge)
Thu 05/11/26
Mon 09/11/26
Mon 09/11/26
Mon 09/11/26
Mon 26/10/26
Mon 16/11/26
72
73
2 days
Vervangen voegovergangen fietspad (part of 0.01 days new deck) Wisselstrook - boven dek
15 days
Above deck works
Vervangen slitjlaag Wisselstrook
5 days
Thu 05/11/26
Thu 12/11/26
77
Verwijderen bestaande slitjlaag
1 day
Thu 05/11/26
Fri 06/11/26
78
Aanleggen nieuwe slijtlaag
2 days
Tue 10/11/26
Thu 12/11/26
Aanleggen nieuwe slijtlaag Vervangen voegovergangen wisselstrook
Verwijderen bestaande slitjlaag
Vervangen voegovergangen wisselstrook
2 days
Fri 06/11/26
Tue 10/11/26
Verven witte strepen bij de voegen
1 day
Fri 13/11/26
Mon 16/11/26
76 days
Tue 01/09/26
Tue 15/12/26
10 days
Tue 15/09/26
Tue 29/09/26
7 days
Tue 01/09/26
Wed 09/09/26
Strengthening Consoles (Wisselstrook)
7 days
Tue 01/09/26
Wed 09/09/26
Below deck works
Conserveren hoofdligger en dwarsdragers basculebrug (below deck)
13 days
Conservation main girder at kelder
Verven witte strepen bij de voegen Below Deck Works Prepare access provisions below deck
Conserveren hoofdligger en dwarsdragers basculebrug (below deck)
Wed 11/11/26
Fri 27/11/26
13 days
Wed 11/11/26
Fri 27/11/26
87
Stralen en reinigen staalconstructie
7 days
Wed 11/11/26
Thu 19/11/26
Stralen en reinigen staalconstructie
88
Aanbrengen grondlaag
2 days
Fri 20/11/26
Mon 23/11/26
Aanbrengen grondlaag
89
Aanbrengen dubbele toplaag
4 days
Tue 24/11/26
Fri 27/11/26
Conservation main girder at kelder
Aanbrengen dubbele toplaag
15.5 days
Tue 15/09/26
Tue 06/10/26
Voegdorpel en voegovergangen
Vervangen onderdelen betonschade onder voegdorpel(binnenzijde basculekelder)
10 days
Tue 15/09/26
Tue 29/09/26
Vervangen onderdelen betonschade onder voegdorpel(binnenzijde basculekelder)
92
Vervangen voegdorpel
5 days
93
Andere werkzaamheden
90 91
Voegdorpel en voegovergangen
Wed 30/09/26
Tue 06/10/26
65.5 days
Tue 15/09/26
Tue 15/12/26
94
Reviseren rem
5 days
Mon 30/11/26
Fri 04/12/26
95
Gewichtsmeting basculebrug
5 days
Mon 07/12/26
Fri 11/12/26
96 97
Weighing of bridge
2 days
Mon 07/12/26
Tue 08/12/26
Adjustments to Counterweight
3 days
Wed 09/12/26
Fri 11/12/26
2 days
Mon 14/12/26
Tue 15/12/26
10 days
Tue 15/09/26
Tue 29/09/26
3 days
Wed 30/09/26
Fri 02/10/26
Stralen en reinigen staalconstructie
0.75 days
Wed 30/09/26
Wed 30/09/26
Aanbrengen grondlaag
0.5 days
Thu 01/10/26
Thu 01/10/26
Aanbrengen dubbele toplaag
1 day
Fri 02/10/26
Fri 02/10/26
5 days
Mon 30/11/26
Fri 04/12/26
10 days
Wed 16/12/26
Tue 29/12/26
98
Testing of bridge opening
99
Injecteren scheuren in Kelder > 0.2mm
100
Conserveren voor opleggingen basculebrug
101 102 103 104 105
Remove access provisions below deck De-mobilisation
Project: concept uitvoerings planning option A1-mediumcrane Date: Wed 30/10/24
F
Vervangen slitjlaag Wisselstrook
76
86
T
Wisselstrook - boven dek
Wed 28/10/26
85
01 Feb '27 M T W
Vervangen voegovergangen fietspad (part of new deck)
Wed 28/10/26
Below deck works
S
Voorzie de brug van een schoprand van 100mm (Fietspad only)
Mon 26/10/26
84
S
Aanbrengen nieuwe slijtlaag (fixed bridge)
Mon 26/10/26
Strengthening Consoles (Wisselstrook)
F
Verwijderen bestaande slijtlaag (fixed bridge)
3 days
83
T
Verven witte stopstrepen op voet/fietspad
3 days
Prepare access provisions below deck
25 Jan '27 M T W
Otherworks at Fietspad
Above deck works
Below Deck Works
S
Bolting purlins to consoles
Strengthening Console
82
S
Nieuwe dek aanbrengen
75
81
F
Lift-in new deck (single lift)
Strengthening Console
80
T
Transfer railings from old deck to new deck (off bridge)
74
79
18 Jan '27 M T W
Lift out of existing dek (single unit)
Thu 01/10/26
Wed 07/10/26
Lift-in new deck (single lift)
S
Fietspad - boven dek
Thu 01/10/26
Transfer railings from old deck to new deck (off bridge)
S
Weghalen bestaande dek
0.01 days
65
F
Lifting attachments & unbolting purlin connections
0.01 days
64
T
Replace asphalt
Part of leaf works
Conserveren bovenkant consoles
11 Jan '27 M T W
Remove existing asphalt
62
61
S
Fixed Bridge - boven dek
Thu 12/11/26
3 days
Remove existing asphalt
Lifting attachments & unbolting purlin connections
S
Aanbrengen nieuw radkeerder
55
Weghalen bestaande dek
F
Verwijderen bestaande radkeerder
54
Fietspad - boven dek
T
White-lines
Aanbrengen nieuw radkeerder
59
04 Jan '27 M T W
Place wearing course
Verwijderen bestaande radkeerder
58
S
Fill bolt holes with epoxy
Vernieuwen radkeerder
57
S
Complete connection (remaining bolts)
Fri 06/11/26
56
F
Install rij-ijzers (leaf)
Wed 30/09/26
Replace asphalt
T
Place timber planks+ initial connection
28 days
Fixed Bridge - boven dek
28 Dec '26 M T W
Installation new deck
Vernieuwen radkeerder
53
S
Drill holes in cross girder/bracing & bolting
47
52
S
Lift in purlins
Randafwerking basculebrug
Verwijderen bestaande hoekstalen
F
Remove enclosure(s) - roof
Fri 06/11/26
51
T
Painting (primer + 2 layers): full deck
Wed 30/09/26
Vervangen hoekstalen
21 Dec '26 M T W
Conservation (at Leaf)
28 days
50
S
Set up enclosure(s)
Randafwerking basculebrug
49
S
Lift out purlins + deck
46
48
F
Separate purlins from structure (Chrome 6 measures)
Mon 05/10/26
Wed 04/11/26
T
Bascule Deck Replacement Works - Leaf
Wed 07/10/26
Wed 04/11/26
14 Dec '26 M T W
Removal of purlins+deck
Tue 06/10/26
1 day
S
Cutting timber deck
Fri 02/10/26
Lift in purlins
S
Removal of rij-ijzers
20 days
Installation new deck
F
Remove traffic management for channel closure
1 day
38
T
Remove traffic management for deck replacement
Conservation (at Leaf)
37
07 Dec '26 M T W
Set-up traffic management for full road closure replacement
31
30
S
Set-up traffic management for channel closure
Tue 15/09/26
0.5 days
28
S
Fase 5 - Wegverkeer en scheepvaart niet gestremd
0.5 days
27
F
Traffic Management (Local)
Remove traffic management for deck replacement 0.5 days
26
T
Fase 4 - Scheepvaart onder basculebrug gestremd + short duration hindrance to wegverkeer
Set-up traffic management for full road closure replacement
25
30 Nov '26 M T W
Mobilisation
Set-up traffic management for channel closure
Hoofdrijbaan - boven dek
S
Fase 3 - Wegverkeer en scheepvaart gestremd
21
24
S
Stage 2 - Scheepvaart onder basculebrug gestremd
20
Above Deck Works
F
Phasing
19
23
T
Stage 1 - Wegverkeer en scheepvaart niet gestremd
Vervangen voegdorpel Andere werkzaamheden Reviseren rem Gewichtsmeting basculebrug Weighing of bridge Adjustments to Counterweight Testing of bridge opening Injecteren scheuren in Kelder > 0.2mm Conserveren voor opleggingen basculebrug Stralen en reinigen staalconstructie Aanbrengen grondlaag Aanbrengen dubbele toplaag Remove access provisions below deck De-mobilisation Page 1
S
OPTION A1: Repair Langsliggers
Uitvoeringsvarianten
blad B-17
Algerabrug: Concept Planning Option A1 (Keep Langsliggers) ID
Task Mode 1
Task Name
Duration
Start
Finish
Phasing
91.5 days
Tue 01/09/26
Wed 06/01/27
2
Stage 1 - Wegverkeer en scheepvaart niet gestremd 10 days
Tue 01/09/26
5
Stage 2 - Scheepvaart onder basculebrug gestremd10.5 days
Mon 14/09/26 Tue 29/09/26
8
Fase 3 - Wegverkeer en scheepvaart gestremd
33.5 days
Tue 29/09/26
Fri 13/11/26
11
Fase 4 - Scheepvaart onder basculebrug 27.5 days gestremd + short duration hindrance to wegverkeer Fase 5 - Wegverkeer en scheepvaart niet gestremd10 days
Fri 13/11/26
Wed 23/12/26
14
Mon 14/09/26
31 Aug '26 M T W
T
F
S
S
07 Sep '26 M T W
T
F
S
S
14 Sep '26 M T W
T
F
S
S
21 Sep '26 M T W
T
F
S
S
28 Sep '26 M T W
T
F
S
S
05 Oct '26 M T W
T
F
S
S
12 Oct '26 M T W
T
F
S
S
19 Oct '26 M T W
T
F
S
S
26 Oct '26 M T W
T
F
S
S
02 Nov '26 M T W
T
F
S
S
09 Nov '26 M T W
T
F
S
S
16 Nov '26 M T W
T
F
S
S
Mobilisation
10 days
Tue 01/09/26
Mon 14/09/26
18
Traffic Management (Local)
71.5 days
Tue 15/09/26
Wed 23/12/26 Tue 15/09/26
Tue 29/09/26
Tue 29/09/26
Fri 13/11/26
Fri 13/11/26
22
Remove traffic management for channel closure
0.5 days
Wed 23/12/26 Wed 23/12/26
32.5 days
Wed 30/09/26 Fri 13/11/26
Above Deck Works
32.5 days
Wed 30/09/26 Fri 13/11/26
Hoofdrijbaan - boven dek
32.5 days
Wed 30/09/26 Fri 13/11/26
26
Removal of timber decking
3.5 days
Wed 30/09/26 Mon 05/10/26
27
Removal of rij-ijzers
1 day
Wed 30/09/26 Wed 30/09/26
28
Remove bolts and decking
2.5 days
Thu 01/10/26
Mon 05/10/26
Mon 05/10/26 Wed 07/10/26
13 days
Wed 07/10/26 Mon 26/10/26
32
Repairs to purlins
3 days
Mon 26/10/26 Thu 29/10/26
Repairs to purlins
33
NDT & local repairs
3 days
Mon 26/10/26 Thu 29/10/26
NDT & local repairs
34
Painting (primer + 2 layers)
3 days
Thu 29/10/26
Tue 03/11/26
35
Epoxy coat to top of purlins
1 day
Tue 03/11/26
Wed 04/11/26
36
Remove enclosure(s) - roof
1 day
Wed 04/11/26 Thu 05/11/26
6 days
Thu 05/11/26
Fri 13/11/26
38
Place timber planks+ initial connection
2 days
Thu 05/11/26
Mon 09/11/26
39
Complete connection (remaining bolts)
2 days
Mon 09/11/26 Wed 11/11/26
40
Install rij-ijzers (leaf)
1 day
Mon 09/11/26 Tue 10/11/26
41
Fill bolt holes with epoxy
1 day
Mon 09/11/26 Tue 10/11/26
42
Place wearing course
2 days
Tue 10/11/26
Thu 12/11/26
43
White-lines
1 day
Thu 12/11/26
Fri 13/11/26
3 days
Wed 30/09/26 Fri 02/10/26
2 days
Thu 05/11/26
1 day
Mon 05/10/26 Mon 05/10/26
Vervangen hoekstalen
1 day
Mon 05/10/26 Mon 05/10/26
Verwijderen bestaande hoekstalen
3 days
Tue 10/11/26
Fri 13/11/26 Fri 13/11/26
Tue 10/11/26
Wed 11/11/26
53
Lay new asphalt
1 day
Wed 11/11/26 Thu 12/11/26
Whitelines
1 day
Thu 12/11/26
30.51 days
Wed 30/09/26 Wed 11/11/26
2 days
Wed 30/09/26 Thu 01/10/26
Lifting attachments & unbolting purlin connections
1 day
Wed 30/09/26 Wed 30/09/26
Lift out of existing dek (single unit)
1 day
Thu 01/10/26
0.01 days
Mon 05/10/26 Mon 05/10/26
Conserveren bovenkant consoles Part of leaf works
Mon 05/10/26 Mon 05/10/26
28.51 days
Fri 02/10/26
Wed 11/11/26
Lift-in new deck (single lift)
1 day
Thu 05/11/26
Fri 06/11/26
Bolting purlins to consoles
2 days
Fri 06/11/26
Tue 10/11/26
Verven witte stopstrepen op voet/fietspad
1 day
Tue 10/11/26
Wed 11/11/26
3.01 days
Thu 05/11/26
Tue 10/11/26
Otherworks at Fietspad
0.01 days
Tue 10/11/26
Tue 10/11/26
Voorzie de brug van een schoprand van 100mm (Fietspad only)
Thu 05/11/26
Fri 06/11/26
Fri 06/11/26
Tue 10/11/26
Vervangen voegovergangen fietspad (part of 0.01 days new deck)
Tue 10/11/26
Tue 10/11/26
2 days
Mon 26/10/26 Thu 29/10/26
Strengthening Console
Above deck works
Above deck works
Tue 10/11/26
Verwijderen bestaande slitjlaag
1 day
Aanleggen nieuwe slijtlaag
Tue 03/11/26
Wed 04/11/26
2 days
Fri 06/11/26
Tue 10/11/26
77
Vervangen voegovergangen wisselstrook
2 days
Wed 04/11/26 Fri 06/11/26
78
Verven witte strepen bij de voegen
1 day
Wed 11/11/26 Thu 12/11/26
71 days
Tue 15/09/26
Wed 23/12/26
75 76
79
Below Deck Works
7 days
Tue 10/11/26
Thu 19/11/26
Strengthening Consoles (Wisselstrook) Below deck works
Tue 10/11/26
Thu 19/11/26
19 days
Tue 10/11/26
Mon 07/12/26
13 days
Tue 10/11/26
Fri 27/11/26
Stralen en reinigen staalconstructie
7 days
Tue 10/11/26
Thu 19/11/26 Mon 23/11/26
85
Aanbrengen grondlaag
2 days
Thu 19/11/26
87
Aanbrengen dubbele toplaag
4 days
Mon 23/11/26 Fri 27/11/26
88
Conservation leaf (below deck)
86
19 days
Tue 10/11/26
Mon 07/12/26
89
Stralen en reinigen staalconstructie (part of 0.1 days above deck works)
Tue 10/11/26
Tue 10/11/26
90
Aanbrengen grondlaag
2 days
Fri 27/11/26
Tue 01/12/26
Aanbrengen dubbele toplaag
4 days
Aanbrengen grondlaag Aanbrengen dubbele toplaag Conservation leaf (below deck) Stralen en reinigen staalconstructie (part of above deck works) Aanbrengen grondlaag Aanbrengen dubbele toplaag
Tue 01/12/26
Mon 07/12/26
Tue 15/09/26
Tue 06/10/26
Voegdorpel en voegovergangen
Tue 15/09/26
Tue 29/09/26
Vervangen onderdelen betonschade onder voegdorpel(binnenzijde basculekelder)
94
Vervangen voegdorpel
5 days
Wed 30/09/26 Tue 06/10/26
95
Andere werkzaamheden
Voegdorpel en voegovergangen
71 days
Tue 15/09/26
96
Reviseren rem
5 days
Mon 07/12/26 Mon 14/12/26
97
Gewichtsmeting basculebrug
5 days
Mon 14/12/26 Mon 21/12/26
Weighing of bridge
2 days
Mon 14/12/26 Wed 16/12/26
Adjustments to Counterweight
98
3 days
Wed 16/12/26 Mon 21/12/26
Testing of bridge opening
2 days
Mon 21/12/26 Wed 23/12/26
101
Injecteren scheuren in Kelder > 0.2mm
10 days
Tue 15/09/26
102
Conserveren voor opleggingen basculebrug
3 days
Wed 30/09/26 Fri 02/10/26
Stralen en reinigen staalconstructie
0.75 days
Wed 30/09/26 Wed 30/09/26
Aanbrengen grondlaag
0.5 days
Thu 01/10/26
Thu 01/10/26
Aanbrengen dubbele toplaag
1 day
Fri 02/10/26
Fri 02/10/26
5 days
Mon 07/12/26 Mon 14/12/26
10 days
Wed 23/12/26 Wed 06/01/27
99
103 104 105 106 107
Remove access provisions below deck De-mobilisation
Project: concept uitvoerings planning option A1-keeplangsliggers Date: Wed 30/10/24
Vervangen voegdorpel Andere werkzaamheden
Wed 23/12/26
100
Tue 29/09/26
S
Conserveren hoofdligger en dwarsdragers basculebrug (below deck)
10 days
93
S
Conservation main girder at kelder
15.5 days
92
F
Stralen en reinigen staalconstructie
Vervangen onderdelen betonschade onder voegdorpel(binnenzijde basculekelder)
91
T
Below Deck Works
Strengthening Consoles (Wisselstrook)
7 days
08 Feb '27 M T W
Verven witte strepen bij de voegen
81
Conservation main girder at kelder
S
Prepare access provisions below deck
Tue 29/09/26
Below deck works
S
Aanleggen nieuwe slijtlaag
Tue 15/09/26
Conserveren hoofdligger en dwarsdragers basculebrug (below deck)
F
Vervangen voegovergangen wisselstrook
10 days
84
T
Verwijderen bestaande slitjlaag
Prepare access provisions below deck
83
01 Feb '27 M T W
Vervangen slitjlaag Wisselstrook
80
82
S
Wisselstrook - boven dek
3 days
Tue 03/11/26
S
Vervangen voegovergangen fietspad (part of new deck)
Strengthening Console
Mon 26/10/26 Thu 29/10/26
F
Aanbrengen nieuwe slijtlaag (fixed bridge)
72
5 days
T
Verwijderen bestaande slijtlaag (fixed bridge)
Mon 26/10/26 Thu 12/11/26
3 days
25 Jan '27 M T W
Verven witte stopstrepen op voet/fietspad
13 days
Vervangen slitjlaag Wisselstrook
S
Bolting purlins to consoles
Wisselstrook - boven dek
74
S
Lift-in new deck (single lift)
71
73
F
Nieuwe dek aanbrengen
65
Aanbrengen nieuwe slijtlaag (fixed bridge)
T
Transfer railings from old deck to new deck (off bridge)
64
Verwijderen bestaande slijtlaag (fixed bridge) 1 day
18 Jan '27 M T W
Lift out of existing dek (single unit)
63
70
S
Lifting attachments & unbolting purlin connections
Mon 05/10/26
69
S
Whitelines
Fri 02/10/26
68
F
Fietspad - boven dek
2 days
Voorzie de brug van een schoprand van 100mm (Fietspad only)
T
Weghalen bestaande dek
Transfer railings from old deck to new deck (off bridge)
67
11 Jan '27 M T W
Lay new asphalt
62
Otherworks at Fietspad
S
Remove existing asphalt
Fri 13/11/26
0.01 days
S
Replace asphalt
Tue 10/11/26
1 day
Part of leaf works
F
Fixed Bridge - boven dek
3 days
Remove existing asphalt
Nieuwe dek aanbrengen
T
Aanbrengen nieuw radkeerder
52
61
04 Jan '27 M T W
Verwijderen bestaande radkeerder
Mon 09/11/26
60
S
White-lines
Aanbrengen nieuw radkeerder
Thu 01/10/26
S
Place wearing course
Verwijderen bestaande radkeerder
66
F
Fill bolt holes with epoxy
Vernieuwen radkeerder
Conserveren bovenkant consoles
T
Installation new deck
Wed 30/09/26 Mon 09/11/26
59
28 Dec '26 M T W
Complete connection (remaining bolts)
28.5 days
58
S
Install rij-ijzers (leaf)
Vernieuwen radkeerder
57
S
Place timber planks+ initial connection
45
Weghalen bestaande dek
F
Remove enclosure(s) - roof
Randafwerking basculebrug
Fietspad - boven dek
T
Epoxy coat to top of purlins
Wed 30/09/26 Mon 09/11/26
56
21 Dec '26 M T W
Painting (primer + 2 layers)
28.5 days
55
S
Stralen en reinigen (Chrome 6 measures)
Randafwerking basculebrug
54
S
Set up enclosure(s)
44
Replace asphalt
F
Conservation (at Leaf)
Mon 05/10/26 Thu 05/11/26
2 days
51
T
Bascule Deck Replacement Works - Leaf
23 days
Fixed Bridge - boven dek
14 Dec '26 M T W
Removal of timber decking