2025-02-12 Bijlage RIB - Achtergronddocument variantenstudie uitvoeringsmethoden
Tekst van het document
Stralen en reinigen (Chrome 6 measures)
50
S
Remove bolts and decking
Set up enclosure(s)
Verwijderen bestaande hoekstalen
S
Removal of rij-ijzers
Conservation (at Leaf)
Vervangen hoekstalen
F
Remove traffic management for channel closure
31
49
T
Remove traffic management for deck replacement
30
48
07 Dec '26 M T W
Set-up traffic management for full road closure replacement
29
47
S
Set-up traffic management for channel closure
Tue 15/09/26
0.5 days
46
S
Fase 5 - Wegverkeer en scheepvaart niet gestremd
0.5 days
Installation new deck
F
Traffic Management (Local)
Remove traffic management for deck replacement 0.5 days
37
T
Fase 4 - Scheepvaart onder basculebrug gestremd + short duration hindrance to wegverkeer
Set-up traffic management for full road closure replacement
Bascule Deck Replacement Works - Leaf
30 Nov '26 M T W
Mobilisation
Set-up traffic management for channel closure
25
S
Fase 3 - Wegverkeer en scheepvaart gestremd
21
Hoofdrijbaan - boven dek
S
Stage 2 - Scheepvaart onder basculebrug gestremd
20
24
F
Phasing
19
Above Deck Works
T
Wed 23/12/26 Wed 06/01/27
17
23
23 Nov '26 M T W
Stage 1 - Wegverkeer en scheepvaart niet gestremd
Reviseren rem Gewichtsmeting basculebrug Weighing of bridge Adjustments to Counterweight Testing of bridge opening Injecteren scheuren in Kelder > 0.2mm Conserveren voor opleggingen basculebrug Stralen en reinigen staalconstructie Aanbrengen grondlaag Aanbrengen dubbele toplaag Remove access provisions below deck De-mobilisation Page 1
Bijlage B-2 Option A2
Uitvoeringsvarianten
blad B-18
OPTION A2a: Combined Scope
Uitvoeringsvarianten
blad B-19
Algerabrug: Concept Planning Option A2-a (Medium Crane) ID
Task Mode 1
Task Name
Duration
Phasing
117.11 days Tue 01/09/26
Start
Finish
Stage 1 - Wegverkeer en scheepvaart niet gestremd
10 days
Tue 01/09/26
Mon 14/09/26
5
Stage 2 - Scheepvaart onder basculebrug gestremd
10.5 days
Mon 14/09/26
Tue 29/09/26
8
Fase 3 - HRB Wegverkeer en scheepvaart gestremd
56 days
Tue 29/09/26
Tue 15/12/26
9
Startdatum
0 days
Tue 29/09/26
Tue 29/09/26
10
Einddatum
0 days
Tue 15/12/26
Tue 15/12/26
11
Fase 3A
20 days
Tue 29/09/26
Mon 26/10/26
Fase 3B
10 days
Mon 26/10/26
Fri 06/11/26
Fase 3C
18 days
Fase 3D
12
Fri 06/11/26
Tue 01/12/26
11 days
Tue 01/12/26
Tue 15/12/26
15
Fase 4 - Scheepvaart onder basculebrug gestremd + short duration 32 days hindrance to wegverkeer
Tue 15/12/26
Thu 28/01/27
18
Fase 5 - Wegverkeer en scheepvaart niet gestremd
10 days
Thu 28/01/27
Thu 11/02/27
13 14
21
Mobilisation
10 days
Tue 01/09/26
Mon 14/09/26
22
Traffic Management (Local)
97.11 days
Tue 15/09/26
Thu 28/01/27
0.5 days
Tue 15/09/26
Tue 15/09/26
23 24 25 26 27 28
Set-up traffic management for channel closure
F
S
S
14 Sep '26 M T W
T
F
S
S
21 Sep '26 M T W
T
F
S
S
28 Sep '26 M T W
T
F
S
S
05 Oct '26 M T W
T
F
S
S
12 Oct '26 M T W
T
F
S
S
19 Oct '26 M T W
T
F
S
S
26 Oct '26 M T W
T
F
S
S
02 Nov '26 M T W
T
S
S
09 Nov '26 M T W
T
F
S
S
16 Nov '26 M T W
F
S
S
07 Dec '26 M T W
T
F
S
S
14 Dec '26 M T W
Fri 02/10/26 Wed 30/09/26 Wed 30/09/26 Thu 01/10/26
Lift out purlins + deck
1 day
Thu 01/10/26
Fri 02/10/26
Strenthening consoles Wisselstrook
3 days
Thu 15/10/26
Tue 20/10/26
undertake strengthening works
3 days
Thu 15/10/26
Tue 20/10/26
16 days
Fri 02/10/26
Mon 26/10/26
Conservation (Main Girder + Wisselstrook)
38
Set up enclosure(s)
2 days
Fri 02/10/26
Tue 06/10/26
39
Stralen en reinigen (Chrome 6 measures): 1/3 deck
7 days
Tue 06/10/26
Thu 15/10/26
40
NDT & local repairs
2 days
Thu 15/10/26
Mon 19/10/26
Painting (primer + 2 layers): Main girder + verge
1.5 days
Tue 20/10/26
1 day
Thu 22/10/26
Thu 22/10/26
0.5 days
Mon 26/10/26
Mon 26/10/26
18 days
Wed 30/09/26
Fri 23/10/26
1 day
Wed 30/09/26
Wed 30/09/26
Aanleggen nieuwe slijtlaag
2 days
Mon 19/10/26
Wed 21/10/26
Vervangen slitjlaag Wisselstrook
45
Verwijderen bestaande slitjlaag
46
Tue 03/11/26 Thu 29/10/26 Fri 30/10/26
Stralen en reinigen (Chrome 6 measures):
57
NDT & local repairs
1 day
Fri 30/10/26
Mon 02/11/26
NDT & local repairs
Painting (primer + 2 layers): top flange only
1 day
Mon 02/11/26
Tue 03/11/26
Painting (primer + 2 layers): top flange only
Remove enclosure(s) - roof
0.1 days
Tue 03/11/26
Tue 03/11/26
Remove enclosure(s) - roof
Tue 03/11/26
Tue 01/12/26
Tue 03/11/26
Mon 09/11/26
1 day
Tue 03/11/26
Wed 04/11/26
63
Lift in temporary bridge for pedestrians
1 day
Wed 04/11/26
Thu 05/11/26
Move cyclists/pedestrians to temporary bridges
0.5 days
Thu 05/11/26
Fri 06/11/26
Move cyclists/pedestrians to temporary bridges
Lifting attachments & unbolting purlin connections
1 day
Thu 05/11/26
Fri 06/11/26
Lifting attachments & unbolting purlin connections
Lift out of existing deck (single unit)
1 day
Fri 06/11/26
Mon 09/11/26
10.5 days
Mon 09/11/26
Tue 24/11/26
Stralen en reinigen (Chrome 6 measures): 1/3 deck
5 days
Wed 11/11/26
Wed 18/11/26
70
NDT & local repairs
1 day
Wed 18/11/26
Thu 19/11/26
Painting (primer + 2 layers): full deck
1.5 days
Thu 19/11/26
Mon 23/11/26
72
Remove enclosure(s)
1 day
73
Nieuwe dek aanbrengen
Mon 23/11/26
Tue 24/11/26
14.51 days
Mon 09/11/26
Mon 30/11/26
74
Transfer railings from old deck to new deck (off bridge)
2 days
Mon 09/11/26
Wed 11/11/26
75
Lift-in new deck (single lift)
1 day
Tue 24/11/26
Wed 25/11/26
76
Bolting purlins to consoles
2 days
Wed 25/11/26
Fri 27/11/26
Verven witte stopstrepen op voet/fietspad
1 day
Aanbrengen nieuwe slijtlaag (fixed bridge)
2 days
Wed 25/11/26
Fri 27/11/26
Aanbrengen nieuwe slijtlaag (fixed bridge)
82
Vervangen voegovergangen fietspad (part of new deck)
0.01 days
Fri 27/11/26
Fri 27/11/26
Vervangen voegovergangen fietspad (part of new deck)
Move cyclists and pedestrians back to fietspad
0.5 days
Mon 30/11/26
Mon 30/11/26
Move cyclists and pedestrians back to fietspad
1 day
Mon 30/11/26
Tue 01/12/26
Remove temporary bridges (ped & cycle)
9 days
Tue 01/12/26
Mon 14/12/26
Complete connection (remaining bolts)
2 days
Tue 08/12/26
Thu 10/12/26
Install rij-ijzers (leaf)
1 day
Tue 08/12/26
Wed 09/12/26
Fill bolt holes with epoxy
1 day
Wed 09/12/26
Thu 10/12/26
92
Place wearing course
1 day
Thu 10/12/26
Fri 11/12/26
White-lines
Place wearing course White-lines
Fri 04/12/26
Randafwerking basculebrug
95
Vernieuwen radkeerder
47.61 days
Wed 30/09/26
Fri 04/12/26
Vernieuwen radkeerder
Verwijderen bestaande radkeerder (1/2)
1 day
Wed 30/09/26
Wed 30/09/26
Verwijderen bestaande radkeerder (1/2)
1 day
Mon 26/10/26
Tue 27/10/26
Aanbrengen nieuw radkeerder
2 days
Wed 02/12/26
Fri 04/12/26
27.1 days
Tue 06/10/26
Thu 12/11/26
1 day
Tue 06/10/26
Wed 07/10/26
Verwijderen bestaande radkeerder (1/2) Verwijderen bestaande radkeerder (1/2) Aanbrengen nieuw radkeerder Vervangen hoekstalen Verwijderen bestaande hoekstalen (1/2) Verwijderen bestaande hoekstalen (1/2) Fixed Bridge - boven dek Replace asphalt
3 days
Wed 09/12/26
Mon 14/12/26
104
Remove existing asphalt
1 day
Wed 09/12/26
Thu 10/12/26
Remove existing asphalt
105
Lay new asphalt
1 day
Thu 10/12/26
Fri 11/12/26
Lay new asphalt
106
Whitelines
1 day
Fri 11/12/26
Mon 14/12/26
96.61 days
Tue 15/09/26
Thu 28/01/27
10 days
Tue 15/09/26
Tue 29/09/26
Wed 09/12/26
Tue 12/01/27
Wed 09/12/26
Tue 22/12/26
Whitelines Below Deck Works Prepare access provisions below deck Conserveren hoofdligger en dwarsdragers basculebrug (below deck) Conservation cross girders below deck Install enclosure
111
Install enclosure
2 days
Wed 09/12/26
Fri 11/12/26
112
Stralen en reinigen staalconstructie
2 days
Fri 11/12/26
Tue 15/12/26
Stralen en reinigen staalconstructie
113
Aanbrengen grondlaag
1.5 days
Tue 15/12/26
Thu 17/12/26
Aanbrengen grondlaag
114
Aanbrengen dubbele toplaag
3 days
Thu 17/12/26
Tue 22/12/26
15 days
Tue 22/12/26
Tue 12/01/27
Aanbrengen dubbele toplaag Conservation steelwork within Kelder Install enclosure
116
Install enclosure
2 days
Tue 22/12/26
Thu 24/12/26
117
Stralen en reinigen staalconstructie
7 days
Thu 24/12/26
Mon 04/01/27
Stralen en reinigen staalconstructie
118
Aanbrengen grondlaag
2 days
Mon 04/01/27
Wed 06/01/27
Aanbrengen grondlaag
4 days
Wed 06/01/27
Tue 12/01/27
61.11 days
Tue 15/09/26
Wed 09/12/26
121
Vervangen onderdelen betonschade onder voegdorpel(binnenzijde basculekelder)
10 days
Tue 15/09/26
Tue 29/09/26
122
Vervangen voegdorpel - Wisselstrook
3 days
Tue 06/10/26
Fri 09/10/26
Vervangen voegdorpel - Fietspad
3 days
Wed 11/11/26
Mon 16/11/26
Vervangen voegdorpel - HRB
3 days
123
Fri 04/12/26
Wed 09/12/26
96.61 days
Tue 15/09/26
Thu 28/01/27
126
Reviseren rem
5 days
Tue 12/01/27
Tue 19/01/27
127
Gewichtsmeting basculebrug
5 days
Tue 19/01/27
Tue 26/01/27
Weighing of bridge
2 days
Tue 19/01/27
Thu 21/01/27
Adjustments to Counterweight
124 125
128
Andere werkzaamheden
3 days
Thu 21/01/27
Tue 26/01/27
Testing of bridge opening
2 days
Tue 26/01/27
Thu 28/01/27
131
Injecteren scheuren in Kelder > 0.2mm
10 days
Tue 15/09/26
Tue 29/09/26
132
Conserveren voor opleggingen basculebrug
3 days
Wed 30/09/26
Fri 02/10/26
129 130
133
Stralen en reinigen staalconstructie
0.75 days
Wed 30/09/26
Wed 30/09/26
134
Aanbrengen grondlaag
0.5 days
Thu 01/10/26
Thu 01/10/26
Aanbrengen dubbele toplaag
1 day
Fri 02/10/26
Fri 02/10/26
5 days
Tue 22/12/26
Tue 29/12/26
10 days
Thu 28/01/27
Thu 11/02/27
135 136 137
Remove access provisions below deck De-mobilisation
Project: concept uitvoerings planning option A2a Date: Thu 24/10/24
S
Fill bolt holes with epoxy
Mon 14/12/26
8.5 days
S
Complete connection (remaining bolts)
Wed 30/09/26
Thu 12/11/26
F
Install rij-ijzers (leaf)
Fri 11/12/26
Mon 14/12/26
T
Installation new deck: Phase 3D
47.61 days
Wed 11/11/26
15 Mar '27 M T W
Place timber planks+ initial connection
1 day
Wed 09/12/26
S
Drill holes in cross girder/bracing & bolting
Randafwerking basculebrug
1 day
S
Lift in purlins
94
3 days
F
Otherworks at Fietspad
Remove temporary bridges (ped & cycle)
91
T
Verwijderen bestaande slijtlaag (fixed bridge)
84
90
08 Mar '27 M T W
Voorzie de brug van een schoprand van 100mm (Fietspad only)
83
89
S
Verven witte stopstrepen op voet/fietspad
81
Tue 08/12/26
S
Nieuwe dek aanbrengen
Wed 25/11/26
Fri 04/12/26
F
Bolting purlins to consoles
Tue 24/11/26
2 days
T
Lift-in new deck (single lift)
1 day
Place timber planks+ initial connection
01 Mar '27 M T W
Remove enclosure(s)
Verwijderen bestaande slijtlaag (fixed bridge)
88
S
Painting (primer + 2 layers): full deck
80
Fri 04/12/26
S
Transfer railings from old deck to new deck (off bridge)
Fri 27/11/26
Wed 02/12/26
F
Conservation (Main Girder + FietsPad): Phase 3C
Tue 01/12/26
2 days
T
NDT & local repairs
Mon 30/11/26
Drill holes in cross girder/bracing & bolting
22 Feb '27 M T W
Stralen en reinigen (Chrome 6 measures): 1/3 deck
Fri 27/11/26
87
S
Set up enclosure(s)
Tue 24/11/26
Wed 02/12/26
S
Lift out of existing deck (single unit)
Fri 27/11/26
Tue 01/12/26
F
Weghalen bestaande dek
5.51 days
1 day
T
Lift in temporary bridge for pedestrians
Voorzie de brug van een schoprand van 100mm (Fietspad 0.01 days only)
Lift in purlins
15 Feb '27 M T W
Lift in temporary bridge for cyclists
79
86
S
Fietspad - boven dek
20.01 days 4 days
69
S
Conservation (Top flange cross girders): Phase 3B
Lift in temporary bridge for cyclists
Wed 11/11/26
F
Set up enclosure(s)
62
Mon 09/11/26
T
Lift out purlins + deck
Thu 29/10/26
2 days
08 Feb '27 M T W
Removal of purlins+deck [Phase 3B]
Thu 29/10/26
Set up enclosure(s)
S
Separate purlins from structure (Chrome 6 measures)
Thu 29/10/26
68
S
Cutting timber deck (2/3)
Thu 29/10/26
Aanbrengen dubbele toplaag
F
Removal of rij-ijzers (2/3)
Wed 28/10/26
Voegdorpel en voegovergangen
T
Move emergency vehicle traffic to wisselstrook
1 day
119
01 Feb '27 M T W
Vervangen slitjlaag Wisselstrook
0.1 days
120
S
Aanleggen nieuwe slijtlaag
3.2 days
Conservation steelwork within Kelder
S
Remove enclosure(s)
1 day
115
F
Verwijderen bestaande slitjlaag
Stralen en reinigen (Chrome 6 measures):
Conservation cross girders below deck
T
Conservation (Main Girder + Wisselstrook)
Set up enclosure(s)
Conserveren hoofdligger en dwarsdragers basculebrug (below deck) 23.5 days
25 Jan '27 M T W
Painting (primer + 2 layers): Main girder + verge
Lift out purlins + deck
Prepare access provisions below deck
S
NDT & local repairs
56
Below Deck Works
S
Stralen en reinigen (Chrome 6 measures): 1/3 deck
55
110
F
Strenthening consoles Wisselstrook
Wed 28/10/26
109
T
undertake strengthening works
Tue 27/10/26
108
18 Jan '27 M T W
Set up enclosure(s)
1 day
107
S
Lift out purlins + deck
Separate purlins from structure (Chrome 6 measures)
Replace asphalt
S
Removal of purlins+deck [Phase 3A]
52
103
F
Separate purlins from structure (Chrome 6 measures)
Verven witte strepen bij de voegen
Verwijderen bestaande hoekstalen (1/2)
T
Cutting timber deck (1/3)
Tue 27/10/26
Fixed Bridge - boven dek
11 Jan '27 M T W
Removal of rij-ijzers (1/3)
Tue 27/10/26
102
S
Remove traffic management for channel closure
0.5 days
Verwijderen bestaande hoekstalen (1/2)
S
Remove traffic management for HRB closure
Cutting timber deck (2/3)
Vervangen hoekstalen
F
Fase 5 - Wegverkeer en scheepvaart niet gestremd
51
99
T
Traffic Management (Local)
Vervangen voegovergangen wisselstrook
98
04 Jan '27 M T W
Set-up traffic management for HRB closure
Mon 26/10/26
Installation new deck: Phase 3D
S
Set-up traffic management for channel closure
Thu 29/10/26
Otherworks at Fietspad
S
Fase 4 - Scheepvaart onder basculebrug gestremd + short duration hindrance to wegverkeer
Fri 23/10/26
Conservation (Main Girder + FietsPad): Phase 3C
F
Mobilisation
Fri 23/10/26
Weghalen bestaande dek
T
Fase 3D
Mon 26/10/26
Fietspad - boven dek
28 Dec '26 M T W
Fase 3C
Mon 26/10/26
Conservation (Top flange cross girders): Phase 3B
S
Fase 3B
Fri 23/10/26
Thu 22/10/26
97
S
Fase 3 - HRB Wegverkeer en scheepvaart gestremd
0.5 days
0.5 days
100
F
Einddatum
3 days
2 days
Verven witte strepen bij de voegen Removal of purlins+deck [Phase 3B]
101
T
Fase 3A
Removal of rij-ijzers (2/3)
Vervangen voegovergangen wisselstrook
49
96
21 Dec '26 M T W
Startdatum
50
48
93
S
Phasing
Wed 21/10/26
Remove enclosure(s) Move emergency vehicle traffic to wisselstrook
44
85
S
Bascule Deck Replacement Works - Leaf
Thu 01/10/26
78
F
Hoofdrijbaan - boven dek
Wed 30/09/26
77
T
Above Deck Works
Wed 30/09/26
71
T
Mon 14/12/26
Wed 30/09/26
67
30 Nov '26 M T W
Mon 14/12/26
0.5 days
66
S
Thu 28/01/27
0.5 days
65
S
Tue 29/09/26
0.5 days
64
F
Tue 15/12/26
2.5 days
61
T
Wed 30/09/26
Separate purlins from structure (Chrome 6 measures)
60
23 Nov '26 M T W
Wed 30/09/26
Cutting timber deck (1/3)
59
S
Wed 27/01/27
Removal of rij-ijzers (1/3)
58
S
Tue 29/09/26
Removal of purlins+deck [Phase 3A]
54
F
Mon 14/12/26
33
53
T
Stage 2 - Scheepvaart onder basculebrug gestremd
53.61 days
32
47
F
Stage 1 - Wegverkeer en scheepvaart niet gestremd
53.61 days
31
43
T
0.5 days
30
41
07 Sep '26 M T W
0.5 days
Mon 14/12/26
42
S
0.5 days
Hoofdrijbaan - boven dek
Wed 30/09/26
37
S
Remove traffic management for channel closure
53.61 days
36
F
Set-up traffic management for HRB closure
Bascule Deck Replacement Works - Leaf
35
T
Remove traffic management for HRB closure Above Deck Works
29
34
31 Aug '26 M T W
Thu 11/02/27
2
Aanbrengen dubbele toplaag Voegdorpel en voegovergangen Vervangen onderdelen betonschade onder voegdorpel(binnenzijde basculekelder) Vervangen voegdorpel - Wisselstrook Vervangen voegdorpel - Fietspad Vervangen voegdorpel - HRB Andere werkzaamheden Reviseren rem Gewichtsmeting basculebrug Weighing of bridge Adjustments to Counterweight Testing of bridge opening Injecteren scheuren in Kelder > 0.2mm Conserveren voor opleggingen basculebrug Stralen en reinigen staalconstructie Aanbrengen grondlaag Aanbrengen dubbele toplaag Remove access provisions below deck De-mobilisation Page 1
22 Mar '27 M
OPTION A2b: Separated Scope
Uitvoeringsvarianten
blad B-20
Algerabrug: Concept Planning Option A2-b (Large Crane) ID
Task Mode
Task Name
Duration
Start
Finish
Phasing
93 days
Tue 01/09/26
Thu 07/01/27
2
Fase 1 - Wegverkeer en scheepvaart niet gestremd10 days
Tue 01/09/26
Mon 14/09/26
5
Fase 2 - Scheepvaart onder basculebrug gestremd 10.5 days
Mon 14/09/26 Tue 29/09/26
1
8
Fase 3 - HRB en scheepvaart gestremd
13.5 days
Tue 29/09/26
Fri 16/10/26
11
Fase 4 - Scheepvaart onder basculebrug gestremd | HRB Wegverkeer niet gestremd
29 days
Fri 16/10/26
Thu 26/11/26
14
Fase 5 - Wegverkeer Night-time en scheepvaart niet gestremd
20 days
Thu 26/11/26
Thu 24/12/26
Fase 6 - Wegverkeer en scheepvaart niet gestremd10 days
Thu 24/12/26
Thu 07/01/27
Tue 01/09/26
Mon 14/09/26
17 20
Mobilisation (arbitrary)
10 days
Predecessors
0.5 days
Tue 15/09/26
Tue 15/09/26 20
Set-up traffic management for HRB road closure
0.5 days
Tue 29/09/26
Tue 29/09/26 96,97
Remove HRB traffic management
0.5 days
Fri 16/10/26
Fri 16/10/26
Remove traffic management for channel closure
0.5 days
Thu 26/11/26
Thu 26/11/26 116,122
26
Traffic Management (painting scope outside deck replacement)
20 days
Thu 26/11/26
Thu 24/12/26
0 days
Thu 26/11/26
Thu 26/11/26 15
28
Night-time (partial road open) finish
0 days
Fri 18/12/26
Fri 18/12/26
29
Night-time (full road open) finish
0 days
Thu 24/12/26
Thu 24/12/26 61
30
Traffic Management ( Wisselstrook)
11 days
Mon 19/10/26 Mon 02/11/26
0.5 days
Mon 19/10/26 Mon 19/10/26 24
36 37
38 39 40
Removal of purlins+deck
Mon 02/11/26 Mon 02/11/26 86,88 Tue 29/09/26
62 days
Wed 30/09/26 Thu 24/12/26
12.5 days
Wed 30/09/26 Fri 16/10/26
3 days
Wed 30/09/26 Fri 02/10/26
S
05 Oct '26 M T W
T
F
S
S
12 Oct '26 M T W
Fri 02/10/26
37,71,38,53
Thu 08/10/26
Mon 12/10/26 42
Thu 08/10/26
Fri 09/10/26
43SS
Painting (primer + 2 coats)
Fri 09/10/26
Fri 09/10/26
44
Remove enclosure(s)
Mon 12/10/26 Fri 16/10/26
1 day
Mon 12/10/26 Tue 13/10/26 45,58
Finishes (for road opening)
1 day
Thu 15/10/26
Fri 16/10/26
51
Randafwerking basculebrug
11.5 days
Wed 30/09/26 Thu 15/10/26
52
Vernieuwen radkeerder
11.5 days
Wed 30/09/26 Thu 15/10/26
2 days
Wed 30/09/26 Thu 01/10/26 23
S
S
09 Nov '26 M T W
T
F
S
S
16 Nov '26 M T W
T
F
S
S
23 Nov '26 M T W
Verwijderen bestaande hoekstalen
1 day
Mon 05/10/26 Mon 05/10/26 53,39
Verwijderen bestaande hoekstalen
Thu 24/12/26 Fri 18/12/26
61
Night-time works - with no traffic
4 days
Mon 21/12/26 Thu 24/12/26 60
5 days
Fri 09/10/26
Fri 16/10/26
Fri 09/10/26
Fri 16/10/26
3 days
Fri 09/10/26
Wed 14/10/26 65SF
Lay new asphalt
1 day
Wed 14/10/26 Thu 15/10/26 66SF
Whitelines
1 day
Thu 15/10/26
Fri 16/10/26
67
Fietspad - boven dek
Tue 29/09/26
Mon 02/11/26
0.5 days
Tue 29/09/26
Tue 29/09/26 95
Weghalen bestaande dek
2 days
Wed 30/09/26 Thu 01/10/26 Wed 30/09/26 Wed 30/09/26 23,68
Lift out of existing dek (single unit)
1 day
Thu 01/10/26
Thu 01/10/26 70
Conserveren bovenkant consoles
Mon 05/10/26 Mon 05/10/26 41
part of leaf works
Fri 02/10/26
Mon 19/10/26
Transfer railings from old deck to new deck (off bridge)
2 days
Fri 02/10/26
Mon 05/10/26 71
76
Lift-in new deck (single lift)
1 day
Tue 13/10/26
Wed 14/10/26 75,45,47
77
Bolting purlins to consoles
2 days
Wed 14/10/26 Fri 16/10/26
78
Fine tuning at rijijzers
1 day
Wed 14/10/26 Thu 15/10/26 76
79
Verven witte stopstrepen op voet/fietspad
1 day
Fri 16/10/26
Mon 19/10/26 84,77
10.01 days
Fri 02/10/26
Fri 16/10/26
0.01 days
Fri 16/10/26
Fri 16/10/26
Wed 07/10/26 83SF
82
Verwijderen bestaande gietasfalt (fixed bridge)3 days
Fri 02/10/26
83
Aanbrengen nieuwe gietasfalt (fixed bridge) 2 days
Wed 07/10/26 Fri 09/10/26
64SF
84
Vervangen voegovergangen fietspad (part of 0.01 days new deck)
Fri 16/10/26
77
T
F
S
S
18 Jan '27 M T W
T
F
S
S
25 Jan '27 M T W
T
F
S
S
01 Feb '27 M T W
T
F
Wisselstrook Strengthening Console (above & below deck) Strengthening works (no access from HRB assumed to be needed): Assumed duration
Vervangen surfacing Wisselstrook
88
Vervangen surfacing Wisselstrook
8 days
Mon 19/10/26 Thu 29/10/26
89
Set up enclosures / protection
1 day
Mon 19/10/26 Tue 20/10/26 31
90
Verwijderen bestaande slijtlaag / gietasfalt 4 days
Tue 20/10/26
91
Aanleggen nieuwe slijtlaag / gietasfalt
2 days
Mon 26/10/26 Wed 28/10/26 90
Aanleggen nieuwe slijtlaag / gietasfalt
Vervangen voegovergangen wisselstrook (no scope)
0.01 days
Wed 28/10/26 Wed 28/10/26 91
Vervangen voegovergangen wisselstrook (no scope)
Remove enclosures & whitelining
1 day
Wed 28/10/26 Thu 29/10/26 91
52 days
Tue 15/09/26
Thu 26/11/26
Set up enclosures / protection Verwijderen bestaande slijtlaag / gietasfalt
Mon 26/10/26 89
Remove enclosures & whitelining Below Deck Works
95
Install temporay bridge for cycle-peds
10 days
Tue 15/09/26
Tue 29/09/26 22
Install temporay bridge for cycle-peds
96
Prepare access provisions below deck
10 days
Tue 15/09/26
Tue 29/09/26 22
Prepare access provisions below deck
97
Set-up large crane
5 days
Tue 22/09/26
Tue 29/09/26 96FF
Set-up large crane
98
Conserveren hoofdligger en dwarsdragers basculebrug (below deck)
17 days
Mon 02/11/26 Wed 25/11/26
99
Conservation main girder at kelder
Conserveren hoofdligger en dwarsdragers basculebrug (below deck) Conservation main girder at kelder
13 days
Mon 02/11/26 Thu 19/11/26
Stralen en reinigen staalconstructie
7 days
Mon 02/11/26 Wed 11/11/26 87
Stralen en reinigen staalconstructie Aanbrengen grondlaag
100
Aanbrengen dubbele toplaag
Thu 19/11/26 101
Conservation leaf (below deck)
104
Setup enclosure/ventilation systems
2 days
Mon 02/11/26 Wed 04/11/26 87
105
Stralen en reinigen staalconstructie (part of 9 days above deck works)
Wed 04/11/26 Tue 17/11/26 104
Aanbrengen grondlaag
2 days
Tue 17/11/26
Thu 19/11/26 105
Aanbrengen dubbele toplaag
4 days
Thu 19/11/26
Wed 25/11/26 106
15.5 days
Tue 15/09/26
Tue 06/10/26
Vervangen onderdelen betonschade onder voegdorpel(binnenzijde basculekelder)
10 days
Tue 15/09/26
Tue 29/09/26 22
Vervangen voegdorpel (scope not clear)
5 days
Wed 30/09/26 Tue 06/10/26 23
Setup enclosure/ventilation systems Stralen en reinigen staalconstructie (part of above deck works) Aanbrengen grondlaag Aanbrengen dubbele toplaag Voegdorpel en voegovergangen Vervangen onderdelen betonschade onder voegdorpel(binnenzijde basculekelder) Vervangen voegdorpel (scope not clear) Andere werkzaamheden
30 days
Tue 15/09/26
112
Reviseren rem
5 days
Wed 30/09/26 Tue 06/10/26 23
113
Gewichtsmeting basculebrug
5 days
Fri 16/10/26
Fri 23/10/26
Weighing of bridge
2 days
Fri 16/10/26
Tue 20/10/26 50
Tue 27/10/26
Adjustments to Counterweight
Reviseren rem Gewichtsmeting basculebrug
46
3 days
Tue 20/10/26
Fri 23/10/26
Testing of bridge opening
2 days
Fri 23/10/26
Tue 27/10/26 113,112
117
Injecteren scheuren in Kelder > 0.2mm
10 days
Tue 15/09/26
Tue 29/09/26 22
118
Conserveren voor opleggingen basculebrug
3 days
Mon 02/11/26 Thu 05/11/26
Weighing of bridge Adjustments to Counterweight
114
119
Stralen en reinigen staalconstructie
0.75 days
Mon 02/11/26 Tue 03/11/26 87
120
Aanbrengen grondlaag
0.5 days
Tue 03/11/26
121
Aanbrengen dubbele toplaag
1 day
Wed 04/11/26 Thu 05/11/26 120SS+1 day
5 days
Thu 19/11/26
Thu 26/11/26 87,106
10 days
Fri 25/12/26
Thu 07/01/27 122,116,61
Remove access provisions below deck
11 Jan '27 M T W
Vervangen voegovergangen fietspad (part of new deck)
Mon 19/10/26 Mon 02/11/26 31
De-mobilisation (arbitrary)
S
Aanbrengen nieuwe gietasfalt (fixed bridge)
Strengthening works (no access from HRB 10 days assumed to be needed): Assumed duration
123
S
Verwijderen bestaande gietasfalt (fixed bridge)
87
122
F
Verven witte stopstrepen op voet/fietspad
Mon 19/10/26 Mon 02/11/26
Project: concept uitvoerings planning option A2b Date: Thu 24/10/24
T
Voorzie de brug van een schoprand van 100mm (Fixed bridge) - advance works
77
Strengthening Console (above & below deck)10 days
116
04 Jan '27 M T W
Bolting purlins to consoles
86
115
S
Fine tuning at rijijzers
Mon 19/10/26 Mon 02/11/26
114
S
Lift-in new deck (single lift)
10 days
Andere werkzaamheden
F
Otherworks at Fietspad
Voorzie de brug van een schoprand van 100mm (Fixed bridge) - advance works
Mon 02/11/26 Wed 25/11/26
T
Transfer railings from old deck to new deck (off bridge)
76
81
Fri 13/11/26
28 Dec '26 M T W
Nieuwe dek aanbrengen
75
Wed 11/11/26 Fri 13/11/26
S
Lift out of existing dek (single unit)
Mon 05/10/26 Mon 05/10/26
17 days
S
Lifting attachments & unbolting purlin connections
11.51 days
4 days
F
Move cycle-peds to temporary bridge
0.1 days
2 days
T
Whitelines
0.1 days
Aanbrengen dubbele toplaag
21 Dec '26 M T W
Lay new asphalt
part of leaf works
Aanbrengen grondlaag
S
Remove existing asphalt
Nieuwe dek aanbrengen
Conservation leaf (below deck)
S
Night-time works - with no traffic
74
103
F
Night-time works - with ped/cyclists/emergency
73
102
T
Weghalen bestaande dek
Lifting attachments & unbolting purlin connections 1 day
Fri 16/10/26
14 Dec '26 M T W
Fietspad - boven dek
24 days
Move cycle-peds to temporary bridge
69
111
S
Install new drainage channels (HRB/fietspad)
50FF
68
110
S
Replace asphalt
5 days
Remove existing asphalt
Voegdorpel en voegovergangen
F
Painting Main Girders (above Deck)
66
109
T
Fixed Bridge - boven dek
65
108
07 Dec '26 M T W
15
64
107
S
Vervangen hoekstalen / drainage channel Remove drainage channels
Mon 12/10/26 44
106
S
Aanbrengen nieuw radkeerder + coverplate
Thu 15/10/26 47
Fri 27/11/26
101
F
Finishes (for road opening)
Mon 05/10/26 Mon 12/10/26
Fri 27/11/26
100
T
Verwijderen bestaande radkeerder + cover plate
Mon 05/10/26 Mon 05/10/26 53,39
Below Deck Works
30 Nov '26 M T W
Drill holes in cross girder/bracing & bolting
1 day
Fri 09/10/26
94
S
Vernieuwen radkeerder
20 days
93
S
Randafwerking basculebrug
Night-time works - with ped/cyclists/emergency 16 days
92
F
Fine tuning at rijijzers
48
60
85
T
Lift in deck (single lift)
Remove drainage channels
Wisselstrook
F
Installation new deck
50
Otherworks at Fietspad
T
Conservation
4 days
Conserveren bovenkant consoles
02 Nov '26 M T W
NDT & local repairs
0.5 days
Replace asphalt
S
Stralen en reinigen (Chrome 6 measures)
1.5 days
Fixed Bridge - boven dek
S
Set up enclosure(s)
Wed 07/10/26 41,73,57
3 days
Install new drainage channels (HRB/fietspad) 1 day
F
Lift out deck (single lift)
Remove enclosure(s)
Painting Main Girders (above Deck)
T
Night-time (full road open) finish
Painting (primer + 2 coats)
Tue 13/10/26
26 Oct '26 M T W
Remove wisselstrook closure
NDT & local repairs
Aanbrengen nieuw radkeerder + coverplate 2 days
S
Set-up Wisselstrook closure
Mon 05/10/26 Mon 05/10/26 39
Vervangen hoekstalen / drainage channel 5.5 days
S
Night-time (partial road open) finish
0.5 days
55
F
Night-time (partial road open) start
Lifting attachments to existing structure
54
T
Remove traffic management for channel closure
Mon 05/10/26 Mon 12/10/26
Verwijderen bestaande radkeerder + cover plate
19 Oct '26 M T W
Remove HRB traffic management
Fri 02/10/26
Installation new deck
S
Set-up traffic management for HRB road closure
Wed 30/09/26 Thu 01/10/26 23
Tue 06/10/26
S
Set-up traffic management for channel closure
6 days
Wed 14/10/26 47
80
F
1 day
Tue 13/10/26
72
T
2 days
1 day
71
S
Lift out deck (single lift)
Fine tuning at rijijzers
70
F
Lifting attachments to existing structure Conservation
49
63
T
Hoofdrijbaan - boven dek
Thu 15/10/26 47
62
28 Sep '26 M T W
Removal of purlins+deck
Tue 13/10/26
59
S
Separate purlins from structure (Chrome 6 measures)
Drill holes in cross girder/bracing & bolting 2 days
58
S
Above Deck Works
Lift in deck (single lift)
57
F
Bascule Deck Replacement Works - Leaf
48
56
T
Thu 24/12/26
47
53
21 Sep '26 M T W
Wed 30/09/26 Thu 01/10/26 23
Stralen en reinigen (Chrome 6 measures) 2 days
46
S
Separate purlins from structure (Chrome 6 2 days measures)
42
45
S
Traffic Management ( Wisselstrook)
62.5 days
Set up enclosure(s)
44
F
60
0.5 days
41
43
T
Traffic Management (painting scope outside deck replacement)
Night-time (partial road open) start
Bascule Deck Replacement Works - Leaf
14 Sep '26 M T W
35FF,50
27
Hoofdrijbaan - boven dek
S
Fase 6 - Wegverkeer en scheepvaart niet gestremd
Set-up traffic management for channel closure
Remove wisselstrook closure
S
Fase 5 - Wegverkeer Night-time en scheepvaart niet gestremd
25
Above Deck Works
F
Traffic Management (deck replacement scope)
24
35
T
Mobilisation (arbitrary)
23
34
07 Sep '26 M T W
Fase 4 - Scheepvaart onder basculebrug gestremd | HRB Wegverkeer niet gestremd
22
33
S
Fase 3 - HRB en scheepvaart gestremd
Thu 26/11/26
32
S
Phasing
Tue 15/09/26
Set-up Wisselstrook closure
F
Fase 2 - Scheepvaart onder basculebrug gestremd
53 days
31
T
Fase 1 - Wegverkeer en scheepvaart niet gestremd
Traffic Management (deck replacement scope)
21
31 Aug '26 M T W
Tue 03/11/26 119SS+1 day
Testing of bridge opening Injecteren scheuren in Kelder > 0.2mm Conserveren voor opleggingen basculebrug Stralen en reinigen staalconstructie Aanbrengen grondlaag Aanbrengen dubbele toplaag Remove access provisions below deck De-mobilisation (arbitrary) Page 1