Bijlage 3 Flexwoningen Voorschoten: geotechnische haalbaarheidsstudie
Tekst van het document
0,000 -0,870
Co-ordinates [m] 100,000 -0,870
2.2 Pl-lines Pl-line number 1 -X1 -Y-
2.3 General Data Soil model: Consolidation model: Strain model: Groundwater level: Unit weight of water: Stress distribution - Soil: - Loads: End of consolidation: With maintain profile (only for non uniform loads) - Material: - Time: - Unit weight above phreatic.: - Unit weight below phreatic: - Iteration stop criterium: Pc (initial): Pc (per step): Creep rate reference time: No imaginary surface With submerging (only for non uniform loads) - Iteration stop criterium : Load column width - Non-Uniform Loads : - Trapeziform Loads :
4-3-2024
NEN Bjerrum Darcy Linear Initial determined by Pl-line number 1 9,81 [kN/m³] Buisman None 10000,00 [days]
Superelevation 0,00 [days] 18,00 [kN/m³] 20,00 [kN/m³] 0,10 [m] Variable parallel to the initial effective stress Automatic increased to the final effective stresses 1,000 [days]
0,10 [m] 1,00 [m] 1,00 [m]
EO_1.0 180d
Page 3
<Not Registered> <Not Registered>
D-Settlement 21.2
2.4 Soil Profiles Layer number 10 9 8 7 6 5 4 3 2 1
Material name
Pl-line top
Zand, schoon, los Veen, slap Zand, schoon, los Zand, schoon, matig Klei, zwak zandig, sl... Klei, schoon, slap Veen, matig Klei, schoon, slap Veen, matig Zand, schoon, matig
Pl-line bottom 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
2.5 Soil Properties Layer number 10 9 8 7 6 5 4 3 2 1
Drained
Unit weight Unsaturated Saturated [kN/m³] [kN/m³] 17,00 19,00 10,00 10,00 17,00 19,00 18,00 20,00 15,00 15,00 14,00 14,00 11,00 11,00 14,00 14,00 11,00 11,00 18,00 20,00
Yes No Yes Yes No No No No No Yes
Layer number
Storage type
10 9 8 7 6 5 4 3 2 1
Vert. cons. Vert. cons. Vert. cons. Vert. cons. Vert. cons. Vert. cons. Vert. cons. Vert. cons. Vert. cons. Vert. cons.
Layer number 10 9 8 7 6 5 4 3 2 1
POP [kN/m²] -
1,00 2,00 1,00 1,00 2,20 1,73 1,99 1,73 1,99 1,00
1,000E+04 1,000E+04 1,000E+04 1,000E+04 1,000E+04 1,000E+04 -
Layer number
Reloading/ swelling ratio RR [-] 0,0038000 0,1533000 0,0038000 0,0013000 0,0767000
Compression ratio CR [-] 0,0115000 0,4600000 0,0115000 0,0038000 0,2300000
Coeff. of sec. compression Ca [-] 0,0000000 0,0230000 0,0000000 0,0000000 0,0131000
10 9 8 7 6 4-3-2024
Vert. consolid. coefficient Cv [m²/s] 1,00E-07 1,00E-06 1,00E-08 1,00E-07 1,00E-08 1,00E-07 -
Vertical permeability [m/s]
OCR [-]
Equiv. age [days]
Permeability strain mod. [-] -
EO_1.0 180d
-
Initial vertical permeability [m/s] -
Reloading/ swelling index Cr [-] -
Compression index Cc [-] -
Initial void ratio (e0) [-] Page 4
<Not Registered> <Not Registered> Layer number
Reloading/ swelling ratio RR [-] 0,1095000 0,1022000 0,1095000 0,1022000 0,0013000
5 4 3 2 1
Compression ratio CR [-] 0,3286000 0,3067000 0,3286000 0,3067000 0,0038000
Coeff. of sec. compression Ca [-] 0,0131000 0,0153000 0,0131000 0,0153000 0,0000000
Reloading/ swelling index Cr [-] -
D-Settlement 21.2 Compression index Cc [-] -
Initial void ratio (e0) [-] -
2.6 Non-Uniform Loads Load number
Time [days]
1 2
0 0
Load number 1 -X1 -Y2 -X2 -Y-
Unit weight Unsaturated Saturated [kN/m³] [kN/m³] 18,00 20,00 18,00 20,00
10,00 0,00 10,00 0,00
15,00 1,00 15,00 2,00
Co-ordinates [m] 80,00 85,00 1,00 0,00 80,00 85,00 2,00 0,00
2.7 Verticals Vertical number
X co-ordinates [m] 1
4-3-2024
50,000
EO_1.0 180d
Page 5
<Not Registered> <Not Registered>
D-Settlement 21.2
3 Results per Vertical 3.1 Results for Vertical 1 (X = 50,00 m; Z = 0,00 m)
Depth [m] 0,000 -0,100 -0,200 -0,300 -0,400 -0,450 -0,500 -0,600 -0,700 -0,800 -0,870 -0,900 -0,900 -1,000 -1,150 -1,400 -1,400 -2,000 -2,500 -3,000 -3,600 -3,600 -4,350 -5,150 -5,900 -6,700 -6,700 -7,450 -8,200 -8,200 -8,850 -9,450 -10,100 -10,700 -10,700 -10,950 -11,200 -11,200 -12,200 -13,200 -13,200 -13,500 -13,800 -13,800 -14,500 -15,500 -16,500 -16,900 -17,600 -18,600 -19,600 -20,000
4-3-2024
Effective Stress [kPa] 23,616 25,315 27,015 28,715 30,415 31,265 32,115 33,640 34,559 35,478 36,121 36,397 36,397 36,415 36,444 36,491 36,492 42,005 46,600 51,194 56,707 56,708 64,348 72,497 80,136 88,282 88,282 92,128 95,975 95,975 97,083 98,446 100,367 102,593 102,593 102,886 103,188 103,188 108,548 115,134 115,134 115,590 116,055 116,055 123,153 133,288 143,414 147,463 154,544 164,654 174,755 178,794
Hydraulic head [m] 0,000 -0,100 -0,200 -0,300 -0,400 -0,450 -0,500 -0,600 -0,700 -0,800 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,866 -0,862 -0,862 -0,699 -0,582 -0,502 -0,474 -0,474 -0,474 -0,475 -0,475 -0,598 -0,846 -0,846 -0,858 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870
Loading [kPa] 23,615 23,615 23,615 23,615 23,615 23,615 23,615 23,440 22,659 21,878 21,331 21,331 21,331 21,331 21,331 21,331 21,331 21,331 21,330 21,330 21,329 21,329 21,327 21,324 21,320 21,315 21,315 21,308 21,298 21,298 21,289 21,278 21,264 21,250 21,250 21,243 21,236 21,236 21,204 21,165 21,165 21,152 21,138 21,138 21,104 21,048 20,984 20,957 20,905 20,825 20,737 20,699
EO_1.0 180d
Settlement [m] 0,313 0,312 0,310 0,309 0,308 0,308 0,307 0,306 0,306 0,305 0,305 0,305 0,305 0,285 0,256 0,208 0,208 0,205 0,203 0,201 0,199 0,199 0,198 0,197 0,197 0,196 0,196 0,175 0,155 0,155 0,133 0,116 0,098 0,083 0,083 0,077 0,071 0,071 0,047 0,019 0,019 0,011 0,002 0,002 0,002 0,002 0,001 0,001 0,001 0,000 0,000 0,000
Page 6
<Not Registered> <Not Registered>
D-Settlement 21.2
4 Settlements 4.1 Settlements Vertical number 1
X co-ordinate [m] 50,00
Z co-ordinate [m] 0,00
Surface level [m] 0,00
Settlement
Part of final settlement [%] 68,206
Settlement [m] 0,313
4.2 Residual Times Vertical number
Time [days] 1
180
[m] 0,214
Residual settlements [m] 0,100
4.3 Maintain Profile Calculation Results Load 1 consists of 70,000 m3 per Width Load 2 consists of 70,000 m3 per Width Load 3 consists of 70,000 m3 per Width The extra amount of soil to be added is 23,396 m3 per Width This equals the found settlements for non-uniform loads
End of Report
4-3-2024
EO_1.0 180d
Page 7
Bijlage 5
Fundering op staal
14-03-2024 Projectnummer: 51020359 Onderwerp: Haalaarheidsonderzoek flexwoningen
Sweco | Flexwoningen Voorschoten Geotechnische haalbaarheidsstudie Projectnummer 51020359 Datum 14-03-2024
Versie D1.0
Documentreferentie NL24-648800269-74607
Report for D-Foundations 23.1 Design and Verification according to Eurocode 7 of Bearing/Tension Piles and Shallow Foundations Developed by Deltares
Date of report: Time of report: Report with version:
4-3-2024 16:44:46 23.1.1.40340
Date of calculation: 4-3-2024 Time of calculation: 16:40:02 Calculated with version: 23.1.1.40340 File name:
Fundering op Staal
Project identification:
Staalfundatie sonderingen Gemeente Voorschoten D-Foundations Fundering op Staal
D-Foundations 23.1
1 Table of Contents 1 Table of Contents 2 Input Data 2.1 General Input Data 2.2 General Report Data 2.3 Application Area Model Shallow Foundations 2.4 Superstructure 2.5 General CPT Data 2.5.1 View of CPT's in Foundation Plan 2.6 Soil Data 2.6.1 Soil Profile IJsbaan - CPT000000158049 2.6.2 Soil Profile Geestwoningpad - CPT000000019295 2.6.3 Soil Profile Koninklijke marinelaan - S30H02102 2.6.4 Soil Profile Oude Stationslaantje - CPT000000022126 2.6.5 Soil Profile Het Wedde (Zwembad) - CPT000000090715 2.6.6 Soil Profile Gemeentewerf Rosenburgherlaan - S40-220 2.7 Foundation Data 2.8 Foundation Plan 2.8.1 View of Foundation Plan 2.9 Load Data 2.9.1 Vertical Loads 2.9.2 Horizontal Loads 2.10 Overruled Parameters 2.11 Model Options 3 Shallow Foundations (EC7-NL): Results Maximization Vertical Loads 3.1 Errors and Warnings 3.2 Results maximization vertical loads, model Shallow Foundations 3.3 Results at the Last Iteration: Verification of Limit State EQU 3.3.1 Vertical Bearing Capacity, Undrained Situation 3.3.2 Vertical Bearing Capacity, Drained Situation 3.3.3 Horizontal Bearing Capacity 3.3.4 Stability 3.4 Results at the Last Iteration: Verification of Limit State STR/GEO 3.4.1 Verification of Settlement at Limit State STR/GEO 3.5 Results at the Last Iteration: Verification of Serviceability Limit State 3.5.1 Verification of the Serviceability Limit State 3.6 Additional
Information
4-3-2024
Fundering op Staal
2 3 3 3 3 3 3 3 4 4 5 6 7 8 9 10 10 10 11 11 11 11 11 12 12 12 12 12 13 13 13 13 13 14 14 14
Page 2
D-Foundations 23.1
2 Input Data 2.1 General Input Data Model
Shallow Foundations (EC7-NL)
2.2 General Report Data Geotechnical consultant : Design engineer superstructure : Principal : Title 1 : Title 2 : Title 3 : Number of project : Location of project :
Staalfundatie sonderingen Gemeente Voorschoten D-Foundations Fundering op Staal 51020359
2.3 Application Area Model Shallow Foundations The verifications performed by the model Shallow Foundation of D-FOUNDATIONS concern shallow foundations on which only static or quasi-static loads work. The foundation surface must be practically level and should not exceed an angle of 2.5 degrees with the horizon.
2.4 Superstructure Rigidity of the superstructure :
Non-Rigid
2.5 General CPT Data Number of CPT's :
6
2.5.1 View of CPT's in Foundation Plan
4-3-2024
Fundering op Staal
Page 3
D-Foundations 23.1 Name CPT
X-coordinate [m] 0,00 89561,90 0,00 89975,00 91080,74 89590,10
IJsbaan -.. Geestwonin.. Koninklijk.. Oude Stati.. Het Wedde.. Gemeentewe..
Y-coordinate [m] 0,00 459915,10 0,00 460382,00 461582,82 459488,10
2.6 Soil Data Number of soilprofiles:
6
2.6.1 Soil Profile IJsbaan - CPT000000158049 Belonging to CPT Surface level in [m. reference level] : Phreatic level in [m. reference level] : Placement depth of foundation element in [m R.L.] = Concentration value according to Frohlich [-] = Number of layers in profile :
Number layer 1 2 3 4 5 6 7
4-3-2024
Level top layer [m R.L.] -1,500 -1,800 -4,900 -9,000 -9,500 -12,500 -13,000
Gamma [kN/m3] 14,00 10,00 14,00 10,00 14,00 12,00 18,00
Gamma sat [kN/m3] 14,00 10,00 14,00 10,00 14,00 12,00 20,00
IJsbaan - CPT000000158049 -1,50 -1,77 -1,70 3 7
Phi
Cohesion
f;undr
Cc
Ca
[deg] 17,50 15,00 17,50 15,00 17,50 15,00 32,50
[kPa] 0,00 1,00 0,00 1,00 0,00 2,50 0,00
[kPa] 25,00 10,00 25,00 10,00 25,00 20,00 0,00
[-] 0,33 0,46 0,33 0,46 0,33 0,31 0,00
[-] 0,01 0,02 0,01 0,02 0,01 0,02 0,00
Fundering op Staal
Page 4
D-Foundations 23.1 Number layer 1 2 3 4 5 6 7
Level top layer [m R.L.] -1,500 -1,800 -4,900 -9,000 -9,500 -12,500 -13,000
e0 [-] 0,00 0,00 0,00 0,00 0,00 0,00 0,26
Material type Clay Peat Clay Peat Clay Peat Sand
2.6.2 Soil Profile Geestwoningpad - CPT000000019295 Belonging to CPT Surface level in [m. reference level] : Phreatic level in [m. reference level] : Placement depth of foundation element in [m R.L.] = Concentration value according to Frohlich [-] = Number of layers in profile :
Number layer 1 2 3 4 5 6 Number layer 1 2 3 4-3-2024
Level top layer [m R.L.] 0,300 -7,200 -7,600 -10,400 -13,200 -13,700
Gamma
Level top layer [m R.L.] 0,300 -7,200 -7,600
e0
[kN/m3] 17,00 14,00 17,00 14,00 12,00 18,00
[-] 0,00 0,00 0,00
Gamma sat [kN/m3] 19,00 14,00 19,00 14,00 12,00 20,00
Geestwoningpad - CPT000000019295 0,30 -0,87 0,10 3 6
Phi
Cohesion
f;undr
Cc
Ca
[deg] 30,00 17,50 30,00 17,50 15,00 32,50
[kPa] 0,00 0,00 0,00 0,00 2,50 0,00
[kPa] 0,00 25,00 0,00 25,00 20,00 0,00
[-] 0,01 0,33 0,01 0,33 0,31 0,00
[-] 0,00 0,01 0,00 0,01 0,02 0,00
Material type Sand Clay Sand Fundering op Staal
Page 5
D-Foundations 23.1 Number layer 4 5 6
Level top layer [m R.L.] -10,400 -13,200 -13,700
e0 [-] 0,00 0,00 0,26
Material type Clay Peat Sand
2.6.3 Soil Profile Koninklijke marinelaan - S30H02102 Belonging to CPT Surface level in [m. reference level] : Phreatic level in [m. reference level] : Placement depth of foundation element in [m R.L.] = Concentration value according to Frohlich [-] = Number of layers in profile :
Number layer 1 2 3 4 5 6 7 Number layer 1 2 3 4 5 6 7 4-3-2024
Level top layer [m R.L.] 0,400 -0,600 -3,000 -4,500 -8,600 -12,500 -13,000
Gamma
Level top layer [m R.L.] 0,400 -0,600 -3,000 -4,500 -8,600 -12,500 -13,000
e0
[kN/m3] 17,00 10,00 17,00 14,00 17,00 12,00 18,00
[-] 0,00 0,00 0,00 0,00 0,00 0,00 0,26
Gamma sat [kN/m3] 19,00 10,00 19,00 14,00 19,00 12,00 20,00
Koninklijke marinelaan - S30H02102 0,40 -0,61 0,20 3 7
Phi
Cohesion
f;undr
Cc
Ca
[deg] 30,00 15,00 30,00 17,50 30,00 15,00 32,50
[kPa] 0,00 1,00 0,00 0,00 0,00 2,50 0,00
[kPa] 0,00 10,00 0,00 25,00 0,00 20,00 0,00
[-] 0,01 0,46 0,01 0,33 0,01 0,31 0,00
[-] 0,00 0,02 0,00 0,01 0,00 0,02 0,00
Material type Sand Peat Sand Clay Sand Peat Sand Fundering op Staal
Page 6
D-Foundations 23.1 2.6.4 Soil Profile Oude Stationslaantje - CPT000000022126 Belonging to CPT Surface level in [m. reference level] : Phreatic level in [m. reference level] : Placement depth of foundation element in [m R.L.] = Concentration value according to Frohlich [-] = Number of layers in profile :
Number layer 1 2 3 4 5 6 7 8 9 10 11 12 Number layer 1 2 3 4 5 6 7 8 4-3-2024
Level top layer [m R.L.] -0,100 -0,700 -1,000 -7,000 -8,400 -10,000 -10,500 -11,000 -11,300 -12,300 -13,000 -13,500
Gamma
Level top layer [m R.L.] -0,100 -0,700 -1,000 -7,000 -8,400 -10,000 -10,500 -11,000
e0
[kN/m3] 17,00 10,00 17,00 15,00 18,00 14,00 12,00 14,00 17,00 14,00 12,00 18,00
[-] 0,00 0,00 0,00 0,01 0,26 0,00 0,00 0,00
Gamma sat [kN/m3] 19,00 10,00 19,00 15,00 20,00 14,00 12,00 14,00 19,00 14,00 12,00 20,00
Oude Stationslaantje - CPT000000022126 -0,10 -1,02 -0,30 3 12
Phi
Cohesion
f;undr
Cc
Ca
[deg] 30,00 15,00 30,00 22,50 32,50 17,50 15,00 17,50 30,00 17,50 15,00 32,50
[kPa] 0,00 1,00 0,00 0,00 0,00 0,00 2,50 0,00 0,00 0,00 2,50 0,00
[kPa] 0,00 10,00 0,00 40,00 0,00 25,00 20,00 25,00 0,00 25,00 20,00 0,00
[-] 0,01 0,46 0,01 0,23 0,00 0,33 0,31 0,33 0,01 0,33 0,31 0,00
[-] 0,00 0,02 0,00 0,08 0,00 0,01 0,02 0,01 0,00 0,01 0,02 0,00
Material type Sand Peat Sand Clay Sand Clay Peat Clay Fundering op Staal
Page 7
D-Foundations 23.1 Number layer 9 10 11 12
Level top layer [m R.L.] -11,300 -12,300 -13,000 -13,500
e0 [-] 0,00 0,00 0,00 0,26
Material type Sand Clay Peat Sand
2.6.5 Soil Profile Het Wedde (Zwembad) - CPT000000090715 Belonging to CPT Surface level in [m. reference level] : Phreatic level in [m. reference level] : Placement depth of foundation element in [m R.L.] = Concentration value according to Frohlich [-] = Number of layers in profile :
Number layer 1 2 3 4 5 6 7 8 9 Number layer 1 2 3 4 4-3-2024
Level top layer [m R.L.] -0,800 -1,700 -2,600 -3,200 -4,300 -7,700 -10,400 -12,700 -13,200
Gamma
Level top layer [m R.L.] -0,800 -1,700 -2,600 -3,200
e0
[kN/m3] 17,00 10,00 14,00 17,00 18,00 17,00 14,00 12,00 18,00
[-] 0,00 0,00 0,00 0,00
Gamma sat [kN/m3] 17,00 10,00 14,00 19,00 18,00 19,00 14,00 12,00 20,00
Het Wedde (Zwembad) - CPT000000090715 -0,80 -1,67 -1,00 3 9
Phi
Cohesion
f;undr
Cc
Ca
[deg] 17,50 15,00 17,50 30,00 27,50 30,00 17,50 15,00 32,50
[kPa] 5,00 1,00 0,00 0,00 0,00 0,00 0,00 2,50 0,00
[kPa] 50,00 10,00 25,00 0,00 0,00 0,00 25,00 20,00 0,00
[-] 0,15 0,46 0,33 0,01 0,09 0,01 0,33 0,31 0,00
[-] 0,01 0,02 0,01 0,00 0,00 0,00 0,01 0,02 0,00
Material type Clay Peat Clay Sand Fundering op Staal
Page 8
D-Foundations 23.1 Number layer 5 6 7 8 9
Level top layer [m R.L.] -4,300 -7,700 -10,400 -12,700 -13,200
e0 [-] 0,00 0,00 0,00 0,00 0,26
Material type Clay Sand Clay Peat Sand
2.6.6 Soil Profile Gemeentewerf Rosenburgherlaan - S40-220 Belonging to CPT Surface level in [m. reference level] : Phreatic level in [m. reference level] : Placement depth of foundation element in [m R.L.] = Concentration value according to Frohlich [-] = Number of layers in profile :
Number layer 1 2 3 4 5 6 7 8 9 10 Number layer 1 2 4-3-2024
Level top layer [m R.L.] 0,000 -0,900 -1,400 -3,600 -6,700 -8,200 -10,700 -11,200 -13,200 -13,800
Gamma
Level top layer [m R.L.] 0,000 -0,900
e0
[kN/m3] 17,00 10,00 17,00 18,00 15,00 14,00 12,00 14,00 12,00 18,00
[-] 0,00 0,00
Gamma sat [kN/m3] 19,00 10,00 19,00 20,00 15,00 14,00 12,00 14,00 12,00 20,00
Gemeentewerf Rosenburgherlaan - S40-220 0,00 -0,87 -0,20 3 10
Phi
Cohesion
f;undr
Cc
Ca
[deg] 30,00 15,00 30,00 32,50 22,50 17,50 15,00 17,50 15,00 32,50
[kPa] 0,00 1,00 0,00 0,00 0,00 0,00 2,50 0,00 2,50 0,00
[kPa] 0,00 10,00 0,00 0,00 40,00 25,00 20,00 25,00 20,00 0,00
[-] 0,01 0,46 0,01 0,00 0,23 0,33 0,31 0,33 0,31 0,00
[-] 0,00 0,02 0,00 0,00 0,08 0,01 0,02 0,01 0,02 0,00
Material type Sand Peat Fundering op Staal
Page 9
D-Foundations 23.1 Number layer 3 4 5 6 7 8 9 10
Level top layer [m R.L.] -1,400 -3,600 -6,700 -8,200 -10,700 -11,200 -13,200 -13,800
e0 [-] 0,00 0,26 0,01 0,00 0,00 0,00 0,00 0,26
Material type Sand Sand Clay Clay Peat Clay Peat Sand
2.7 Foundation Data
Element name
Element shape
Rect 2000x2000
Rectangular elem.
Width
Length
Diameter
[m]
[m]
[m]
2,00
2,00
n.a.
Matching type name Rect 2000x2000 Rect 2000x2000 Rect 2000x2000 Rect 2000x2000 Rect 2000x2000 Rect 2000x2000
Matching profile name IJsbaan -... Gemeent... Geestwo... Koninklij... Oude St... Het Wed...
Matching load name Load Load Load Load Load Load
Type
Prefab
2.8 Foundation Plan
2.8.1 View of Foundation Plan
Element number/ name 1: IJsbaan 2: Gemeent... 3: Geestwo... 4: Marinela... 5: Oude Sta... 6: Zwemba...
4-3-2024
Xm
Ym
angle
[m] 0,00 10,00 20,00 30,00 40,00 50,00
[m] 0,00 0,00 0,00 0,00 0,00 0,00
[deg] 0,00 0,00 0,00 0,00 0,00 0,00
Fundering op Staal
Nearby slope None None None None None None
Page 10
D-Foundations 23.1
2.9 Load Data
2.9.1 Vertical Loads Load
Load
LS EQU/STR/GEO eLat. eLong. Vd [m] [m] [kN] 0,10 0,10 135,00
eLat. [m] 0,10
SLS eLong. [m] 0,10
SLS eH Hd [m] [kN] 0,00 0,00
Kappa [deg] 90,00
Vd [kN] 135,00
2.9.2 Horizontal Loads Load
Load
LS EQU/STR/GEO eH Hd [m] [kN] 0,00 0,00
2.10 Overruled Parameters All parameters according to standard.
2.11 Model Options Create intermediate results file Do not use the interaction model. Load factor Ultimate limit state / Serviceability limit state : Use the 20% limit to determine the settlement.
4-3-2024
Fundering op Staal
0,8330
Page 11
D-Foundations 23.1
3 Shallow Foundations (EC7-NL): Results Maximization Vertical Loads 3.1 Errors and Warnings The placement depth of the element does not comply with NEN 9997-1+C2:2017 6.4(c). This level should be at least 0.6 m below the surface level. Note: for elements placed alongside other buildings, this demand is 0.8 m. The input does not comply with the demands of the NEN, however a calculation can be performed. The results of this calculation are at best indicative.
3.2 Results maximization vertical loads, model Shallow Foundations Results for foundation element: IJsbaan The maximum allowable vertical load in limit state EQU/STR/GEO is : 1,30 kN. The maximum allowable vertical load in the Serviceability limit state is : 1,08 kN. Results for foundation element: Gemeentewe The maximum allowable vertical load in limit state EQU/STR/GEO is : 62,75 kN. The maximum allowable vertical load in the Serviceability limit state is : 52,27 kN. Results for foundation element: Geestwonin The maximum allowable vertical load in limit state EQU/STR/GEO is : 470,30 kN. The maximum allowable vertical load in the Serviceability limit state is : 391,76 kN. Results for foundation element: Marinelaan The maximum allowable vertical load in limit state EQU/STR/GEO is : 18,90 kN. The maximum allowable vertical load in the Serviceability limit state is : 15,74 kN. Results for foundation element: Oude Stati The maximum allowable vertical load in limit state EQU/STR/GEO is : 115,05 kN. The maximum allowable vertical load in the Serviceability limit state is : 95,84 kN. Results for foundation element: Zwembad The maximum allowable vertical load in limit state EQU/STR/GEO is : 11,30 kN. The maximum allowable vertical load in the Serviceability limit state is : 9,41 kN.
Results at the Last Iteration
3.3 Results at the Last Iteration: Verification of Limit State EQU Required by NEN 9997-1+C2:2017 art. 2.4.8: Ed <= Cd. 3.3.1 Vertical Bearing Capacity, Undrained Situation Found elem. name IJsbaan Gemeentewe Geestwonin Marinelaan Oude Stati Zwembad
4-3-2024
Calc. case Case A Case C NONE Case C Case C Case A
Vd
Rd
[kN] 1,30 114,03
[kN] 156,33 242,26
79,65 143,81 11,30
257,09 204,46 158,09
Vd Rd (Squeeze) (Squeeze) [kN] [kN] n.a. n.a. n.a. n.a. n.a. n.a. n.a.
Fundering op Staal
n.a. n.a. n.a.
Fpull
Result of verification
[kN] n.a. n.a.
PASSED PASSED
n.a. n.a. n.a.
PASSED PASSED PASSED
Page 12
D-Foundations 23.1 - the verification checks both Vd <= Rd and, if applicable, Vd;sq <= Rd;sq! - Fpull (0.5 * w' * cu;d) is the tension force in the element per meter which should be handled by the element in case of squeeze (see art. 6.5.2.2 (s) NEN 9997-1+C2:2017). 3.3.2 Vertical Bearing Capacity, Drained Situation Found elem. name IJsbaan Gemeentewe Geestwonin Marinelaan Oude Stati Zwembad
Calc. case Case B Case C Case B Case C Case C Case B
Vd
Rd
[kN] 1,30 62,75 470,30 18,90 115,05 11,30
[kN] 58,81 264,41 470,31 192,45 310,70 170,71
Vd (Punch) [kN] 0,00 114,03 0,00 79,65 143,81 0,00
Rd (Punch) [kN] 0,00 744,52 0,00 315,72 651,56 0,00
Result of verification PASSED PASSED PASSED PASSED PASSED PASSED
Note: both the situation with and without punch through are checked! 3.3.3 Horizontal Bearing Capacity Found elem. name IJsbaan Gemeentewe Geestwonin Marinelaan Oude Stati Zwembad
Hd [kN] 0,00 0,00 0,00 0,00 0,00 0,00
Rd undrained [kN] 0,00 0,00 0,00 0,00 0,00 0,00
Rd drained [kN] 0,00 0,00 0,00 0,00 0,00 0,00
Result of verification undrained PASSED PASSED n.a. PASSED PASSED PASSED
Result of verification drained PASSED PASSED PASSED PASSED PASSED PASSED
Note: As passive neither active soil loads are taken into account while determining the horizontal bearing capacity, the qualification "FAILED" in the above table is not an definitive answer. Additional calculations , based on NEN 9997-1+C2:2017 Chapter 9 including all factors, can lead to a different conclusion. 3.3.4 Stability Found elem. name IJsbaan Gemeentewe Geestwonin Marinelaan Oude Stati Zwembad
Minimum l' [m] 1,80 1,80 1,80 1,80 1,80 1,80
Minimum w' [m] 1,80 1,80 1,80 1,80 1,80 1,80
Phi`d [deg] 13,35 22,11 26,66 13,12 23,87 14,50
Tip over stability
Total stability
PASSED PASSED PASSED PASSED PASSED PASSED
PASSED PASSED PASSED PASSED PASSED PASSED
3.4 Results at the Last Iteration: Verification of Limit State STR/GEO Required by NEN 9997-1+C2:2017 art. 2.4.9: Sd <= Sreq.Sreq = 0,000 [m] Sd = s1;d + s2;d Note: The user-defined Sreq differs from the proposed value (0.15 m) as provided by NEN 9997-1+C2:2017. Less strict values should be reviewed carefully. 3.4.1 Verification of Settlement at Limit State STR/GEO Found elem. name IJsbaan Gemeentewe Geestwonin Marinelaan Oude Stati 4-3-2024
s1 (20%) [m] 0,028 0,093 0,033 0,045 0,116
s1;gd (5%) [m] 0,064 0,093 0,039 0,077 0,117
s2 [m] 0,122 0,058 0,000 0,103 0,035
Fundering op Staal
Result of verification (20%) PASSED PASSED PASSED PASSED PASSED
Result of verification (5%) FAILED FAILED PASSED FAILED FAILED Page 13
D-Foundations 23.1 Found elem. name Zwembad
s1 (20%) [m] 0,048
s1;gd (5%) [m] 0,062
s2 [m] 0,102
Result of verification (20%) PASSED
Result of verification (5%) FAILED
Note: the verification at 20% is demanded by the NEN, at 5% is recommended by Deltares! The maximum increase in soil tension found while calculating the settlement, is100 % of the effective foundation pressure. When using this design option, rotations are not considered.
3.5 Results at the Last Iteration: Verification of Serviceability Limit State Required by NEN 9997-1+C2:2017 art. 2.4.9: Sd <= Sreq. For houses, the requirement is : Sreq = 0.05 m. For other types of superstructures a different (well considered) requirement can be specified. Seq = 0,000 Sd = s1;d + s2;d Note: The user-defined Sreq differs from the imposed value (0.05 m) as provided by NEN 9997-1+C2:2017. 3.5.1 Verification of the Serviceability Limit State Found elem. name IJsbaan Gemeentewe Geestwonin Marinelaan Oude Stati Zwembad
s1 (20%) [m] 0,012 0,059 0,022 0,023 0,078 0,026
s1;gd (5%) [m] 0,019 0,060 0,023 0,043 0,079 0,038
s2 [m] 0,070 0,046 0,000 0,064 0,028 0,063
Result of verification (20%) PASSED PASSED PASSED PASSED PASSED PASSED
Result of verification (5%) PASSED PASSED PASSED PASSED PASSED PASSED
Note: the verification at 20% is demanded by the NEN, at 5% is recommended by Deltares! The maximum increase in soil tension found while calculating the settlement, is100 % of the effective foundation pressure. When using this design option, rotations are not considered.
3.6 Additional Information The maximum settlement at limit state STR/GEO is 0,150 meter and has been found at foundation element Oude Stati The maximum settlement at the Serviceability Limit State is 0,106 meter and has been found at foundation element Oude Stati
End of Report
4-3-2024
Fundering op Staal
Page 14
Bijlage 6
Paalfundering
14-03-2024 Projectnummer: 51020359 Onderwerp: Haalaarheidsonderzoek flexwoningen
Sweco | Flexwoningen Voorschoten Geotechnische haalbaarheidsstudie Projectnummer 51020359 Datum 14-03-2024
Versie D1.0
Documentreferentie NL24-648800269-74607
Report for D-Foundations 23.1 Design and Verification according to Eurocode 7 of Bearing/Tension Piles and Shallow Foundations Developed by Deltares
Date of report: Time of report: Report with version:
4-3-2024 16:28:37 23.1.1.40340
Date of calculation: 4-3-2024 Time of calculation: 16:27:39 Calculated with version: 23.1.1.40340 File name:
0.00 Rect 290x290
Project identification:
Geestwoningpad D-Foundations Paalfundatie D-Foundations 0.00 Rect 290x290
D-Foundations 23.1
1 Table of Contents 1 Table of Contents 2 Input Data 2.1 General Input Data 2.2 General Report Data 2.3 Application Area Model Bearing Piles 2.4 Superstructure 2.5 General CPT Data 2.5.1 View of CPT's in Foundation Plan 2.6 Soil Data 2.6.1 Soil Profile S1 2.7 Pile Types 2.7.1 Pile type : Rect 290x290 2.8 Foundation Plan 2.8.1 View of Foundation Plan 2.9 Excavation Data 2.10 Totalized Loads (design values) 2.11 Requirements 2.12 Overruled Parameters 2.13 Model Options 2.14 Model Options 3 Bearing Piles (EC7-NL): Results Complete Verification 3.1 Remarks 3.2 Calculation Parameters 3.2.1 Pile Factors 3.2.2 Pile type : Rect 290x290 3.3 Verification of Limit State EQU 3.4 Verification of Limit State STR/GEO 3.5 Verification of Serviceability Limit State 3.6 Additional Information 3.6.1 The bearing capacity of shaft and point at Limit state STR/GEO 3.6.2 The bearing capacity of shaft and point at the Serviceability Limit State
4-3-2024
0.00 Rect 290x290
2 3 3 3 3 3 3 3 4 4 5 5 5 5 5 6 6 6 6 6 7 7 7 7 7 7 8 8 8 9 9
Page 2
D-Foundations 23.1
2 Input Data 2.1 General Input Data Model
Bearing Piles (EC7-NL)
2.2 General Report Data Geotechnical consultant : Design engineer superstructure : Principal : Title 1 : Title 2 : Title 3 : Number of project : Location of project :
Geestwoningpad D-Foundations Paalfundatie D-Foundations 0.00 Rect 290x290 51020359
2.3 Application Area Model Bearing Piles The verifications performed by the model BEARING PILES of D-FOUNDATIONS concern pile foundations on which axial static or quasi-static loads cause pressures in the piles. The calculations of pile forces and pile displacements are based on Cone Penetration Tests. Possible rise of (tension-)piles and horizontal displacements of piles and/or pile groups are not taken into account.
2.4 Superstructure Rigidity of the superstructure :
Non-Rigid
2.5 General CPT Data Number of CPT's : Timing of CPT's :
1 CPT - Excavation - Install
2.5.1 View of CPT's in Foundation Plan
4-3-2024
0.00 Rect 290x290
Page 3
D-Foundations 23.1 Name CPT
Pile tip level [m R.L.] -19,00
S1
Top of pos. friction zone [m R.L.] -13,80
Bottom of neg. friction zone [m R.L.] -13,80
X-coordinate [m] 89590,10
Y-coordinate [m] 459488,10
2.6 Soil Data Number of soil profiles (= number of CPT's) :
1
2.6.1 Soil Profile S1 Belonging to CPT Surface level in [m. reference level] : Phreatic level in [m. reference level] : Pile tip level in [m. reference level] : Top of positive skin friction zone in [m. reference level] : Bottom of negative skin friction zone in [m. reference level] : OCR-value foundation layer : Expected groundlevel settlement in [m] : Number of layers in profile :
Number layer 1 2 3 4 5 6 7 8
4-3-2024
Top layer [m R.L.] 0,000 -3,600 -6,700 -8,200 -10,700 -11,200 -13,200 -13,800
Gamma
Gamma;sat
[kN/m3] 17,00 18,00 15,00 14,00 12,00 14,00 12,00 18,00
[kN/m3] 19,00 20,00 15,00 14,00 12,00 14,00 12,00 20,00
S1 0,00 -0,87 -19,00 -13,80 -13,80 1,00 0,11 8
Phi [deg] 30,00 32,50 22,50 17,50 15,00 17,50 15,00 32,50
0.00 Rect 290x290
Soil Type Sand Sand Clay Clay Peat Clay Peat Sand
Median (Sand/Gravel) [mm] 0,200 0,200 -----0,200
Page 4
D-Foundations 23.1
2.7 Pile Types
2.7.1 Pile type : Rect 290x290 Pile type :
Prefabricated concrete pile
Materialtype for pile : Concrete Slip layer : None Pile shape : Rectangular pile beta (Shape factor) according to figure 7.i, NEN 9997-1+C2:2017. s (factor for influence of the shape of the crosssection of the pile base) according to NEN 9997-1+C2:2017. Pile dimensions : Smallest side pile tip [m] : Largest side pile tip [m] :
0,290 0,290
2.8 Foundation Plan Number of piles : 1 Number of collaborating piles* : 1 * : 0 = not defined, 1 = non rigid superstructure, >1 = rigid superstructure 2.8.1 View of Foundation Plan
Pile nr/name 1: 1
X-coordinate [m] 119995,00
Y-coorFc;d dinate (EQU/STR/GEO) [m] [kN] 49995,00 675,00
Fc;d (SLS) [kN] 675,00
P0 [kN/m2] 0,00
Pile head level [m R.L.] 0,00
2.9 Excavation Data Excavation level in [m. reference level] : Reduction model : 4-3-2024
0,00 Safe (NEN) 0.00 Rect 290x290
Page 5
D-Foundations 23.1
2.10 Totalized Loads (design values) Total load on all piles For limit state EQU/STR/GEO in [kN] : For Serviceability limit state in [kN] :
675,00 675,00
2.11 Requirements Limit state STR/GEO Maximum allowed settlement in [m] : Maximum allowed (relative) rotation : Serviceability Limit State Maximum allowed settlement in [m] : Maximum allowed (relative) rotation :
0,150 1/0 0,150 1/0
2.12 Overruled Parameters User defined Factor xi3 [-] : User defined Factor xi4 [-] :
1,39 1,39
2.13 Model Options Use pilegroup for negative skin friction (standard) Create intermediate results file Use reduction for continuous flight auger piles (standard) Suppress the influence of excavations.
2.14 Model Options Selected pile types : -Rect 290x290 Selected profiles : -S1
4-3-2024
0.00 Rect 290x290
Page 6
D-Foundations 23.1
3 Bearing Piles (EC7-NL): Results Complete Verification 3.1 Remarks When checking the survey and testing of soil according to NEN 9997-1+C2:2017 art. 3.2.3 section (e), the program uses the provided CPT test level. It does NOT take into account possible different pile tip levels. When different pile tip levels are used in this calculation, the user itself must check for possibly required additional survey and testing of soil. Performing the check on NEN 9997-1+C2:2017 art. 3.2.3, the average distance between the different CPT's used for this check is 25 m. The requirements set by NEN 9997-1+C2:2017 art. A.3.3.3 are met. The variation (0,00%) is ok (<= 12%).
3.2 Calculation Parameters
3.2.1 Pile Factors gamma;b (NEN 9997-1+C2:2017, table A.6 A.7 A.8, Limit State EQU/STR/GEO) : gamma;b (NEN 9997-1+C2:2017, table A.6 A.7 A.8, the Serviceability Limit State) : gamma;s (NEN 9997-1+C2:2017, table A.6 A.7 A.8, Limit State EQU/STR/GEO) : gamma;s (NEN 9997-1+C2:2017, table A.6 A.7 A.8, the Serviceability Limit State) : xi3 (user defined) : xi4 (user defined) : Xi 3 has been used.
1,20 1,00 1,20 1,00 1,39 1,39
Note: The excavation(s) is not taken into account in the calculation!
3.2.2 Pile type : Rect 290x290 Pile type :
Prefabricated concrete pile
Materialtype for pile : Slip layer : Pile shape : beta (Shape factor: figure 7.i, NEN 9997-1+C2:2017 art. 7.6.2.3(g) : Pile tip) : s (NEN 9997-1+C2:2017 art. 7.6.2.3(h) : factor for the influence of the shape of the crosssection of the pile base) :
Concrete None Rectangular pile
Pile dimensions : Smallest side pile tip [m] : Largest side pile tip [m] :
Number/Name CPT 1:S1
Alpha_s Sand/ Gravel 0,0100
1,00 1,00
0,290 0,290
Alpha_s Clay/Loam Peat
Alpha_p
--
0,7000
3.3 Verification of Limit State EQU Required by NEN 9997-1+C2:2017 art. 2.4.8: Ed <= Cd. Non rigid superstructure, verify load per pile with bearing capacity per pile. Fc;d = Rc;d = 4-3-2024
675,000 [kN] 953,426 [kN] 0.00 Rect 290x290
Page 7
D-Foundations 23.1 The requirements of limit state EQU are met, limit state EQU is ok. Note: Negative skin friction plays NO part in Limit State EQU. Its influence is incorporated in the tests for Limit State STR/GEO and the Serviceability limit state. The intermediate results provide a full overview of all values that are calculated for the negative skin friction. Purely indicative, the values for the negative skin friction vary from 249 [kN] to 249 [kN] per pile.
3.4 Verification of Limit State STR/GEO Required by NEN 9997-1+C2:2017 art. 2.4.9: Sd <= Sreq. Sd = Sreq =
0,035 [m] 0,150 [m]
The settlement requirements of limit state STR/GEO are met, this is ok. With only 1 pile, rotation as defined in the NEN is not an issue.
3.5 Verification of Serviceability Limit State Required by NEN 9997-1+C2:2017 art. 2.4.9: Sd <= Sreq. For houses, the requirement is : Sreq = 0.05 m. For other types of superstructures a different (well considered) requirement can be specified. Sd = Sreq =
0,018 [m] 0,150 [m]
The settlement requirements of the Serviceability Limit State are met, this is ok. With only 1 pile, rotation as defined in the NEN is not an issue.
3.6 Additional Information The design values of the maximum shaft tensions (calculated at the transition of positive to negative skin friction) are At Limit state EQU/STR/GEO: sigma = At Serviceability Limit State: sigma =
10,98 [N/mm2] 10,98 [N/mm2]
The maximum settlement was found at: Limit state STR/GEO Number/Name S1 Pile name: 1 Components of the maximum settlement are : sneg = 0,000 [m] sb = 0,026 [m] sel;d = 0,010 [m] s2 = 0,000 [m] Serviceability Limit State Number/Name Pile name:
S1 1
Components of the maximum settlement are : sneg = 0,000 [m] sb = 0,008 [m] sel;d = 0,010 [m] s2 = 0,000 [m] sneg stands for the settlement due to negative skin friction when the expected ground level settlement (egls) is within the next boundaries : 0.02 < egls <= 0.10 meter. For expected ground level settlement beyond the boundaries, sneg = 0.
4-3-2024
0.00 Rect 290x290
Page 8
D-Foundations 23.1 3.6.1 The bearing capacity of shaft and point at Limit state STR/GEO The next table shows the values of the bearing capacities per CPT and these are purely informative. The presented design values are determined using the maximum value of ksi3 and ksi4.
Number/Name CPT 1:S1
Bearing Cap. Shaft [kN] Rs;d 500,601
Bearing Cap. Point [kN] Rb;d 452,825
Bearing Cap. Total [kN] 953,426
3.6.2 The bearing capacity of shaft and point at the Serviceability Limit State The next table shows the values of the bearing capacities per CPT and these are purely informative. The presented design values are determined using the maximum value of ksi3 and ksi4.
Number/Name CPT 1:S1
Bearing Cap. Shaft [kN] Rs;d 600,721
Bearing Cap. Point [kN] Rb;d 543,390
Bearing Cap. Total [kN] 1144,111
End of Report
4-3-2024
0.00 Rect 290x290
Page 9
Bijlage 7
Kostenraming
14-03-2024 Projectnummer: 51020359 Onderwerp: Haalaarheidsonderzoek flexwoningen
Sweco | Flexwoningen Voorschoten Geotechnische haalbaarheidsstudie Projectnummer 51020359 Datum 14-03-2024
Versie D1.0
Documentreferentie NL24-648800269-74607
Project: Zeven locaties flexwoningen Voorschoten 2024 Onderwerp: Voorbelasting op basis van zettingsberekeningen Sweco Datum: 01 maart 2024 versie 1.01 Sweco Nederland B.V. H. (Henk) Veldhuis
gerekend met 1 fasering per locatie Ophoging
Eindzetting
Locatienummer
Locatiebestemming
Oppervlakte terrein in m2
Voorbelasttijd in maanden
(laagdikte in meters)
(laagdikte in meters)
1 2 3 4 5 6 7
IJsbaan Gemeentewerf ZD Gemeentewerf ND Geestwoningpad Koninklijke Marinelaan Oude Stationslaantje Zwembad
6.068,00 4.753,00 2.652,00 2.226,00 784,00 3.640,00 2.106,00
12 6 6 6 6 6 6
1 1 1 1 1 1 1
4,15 0,31 0,31 0,11 0,60 0,18 0,53
Uitgangspunten: Gesloten grondbalans einde werk Kostencomponent per scenario / per fase / per toepassing (= E.O vs V.D. ) helder Fase 1 zo kort mogelijke zettingstijd ( = 4 - 12 maanden) Geen sloopkosten/verwijderingskosten/opruimkosten gerekend Kosten gerekend aankoop zand 14,50,- per losse m3 (verdicht incl. verwerken totaal 22,- per vaste m3) prijspeil 01-01-2024 Kosten alle zand fase 1 = 22,- per vaste m3 Prijzen excl. 20% (uitvoering, AK en W&R) Prijzen prijspeil aannemersprijs 01-01-2024 Voor budgetprijzen 25% opplussen Geen onvoorzien 20% gerekend Geen hergebruik toepassing gerekend vrijkomende materialen Geen bovenwijkse voorzieningen gerekend Geen bouwplaatsvoorzieningen gerekend Geen kosten "voorkomen verstuiving zand" (voorbelasting) gerekend Geen monitoringskosten en zetbakens gerekend Geen watertoepassingen gerekend aangaande zetting/verstuiving/verdichting Geen engineering/begeleiding/directie/toezicht gerekend Geen Aeriusberekening (stikstof) gerekend Genoemde prijzen zijn indicatief (er zijn geen technische tekeningen/dwarsprofielen bekend)
Bruto ophoging
V.D.
(laagdikte in meters)
(h.o.h. in m)
5,15 1,31 1,31 1,11 1,60 1,18 1,53
1 niet niet niet niet niet 1,5
zettingstijd Mobilisatiek (maanden) osten V.D. 12 6 6 6 6 6 6
6000 6000 6000 6000 6000 6000 6000
kosten bruto kosten V.D. kosten totaal (€) (€) fase 1 (€) (zand 22,-) 687.504,40 136.981,46 76.430,64 54.358,92 27.596,80 94.494,40 70.887,96
91.020,00 niet niet niet niet niet 31.590,00
784.524,40 142.981,46 82.430,64 60.358,92 33.596,80 100.494,40 108.477,96
Project: Zeven locaties flexwoningen Voorschoten 2024 Onderwerp: Voorbelasting op basis van zettingsberekeningen Sweco Datum: 01 maart 2024 versie 1.01 Sweco Nederland B.V. H. (Henk) Veldhuis
% aanname
1 2 3 4 5 6 7
Locatienummer
Locatiebestemming
Oppervlakte terrein in m2
1 2 3 4 5 6 7
IJsbaan Gemeentewerf ZD Gemeentewerf ND Geestwoningpad Koninklijke Marinelaan Oude Stationslaantje Zwembad
6.068,00 4.753,00 2.652,00 2.226,00 784,00 3.640,00 2.106,00
Prijs per m2 BRM bruto
Prijs per m2 WRM bruto
Oppervlakte m2 afgerond BRM en WRM 4.248 3.327 1.856 1.558 549 2.548 1.474
73,43 73,43 73,43 73,43 73,43 73,43 73,43
32,69 32,69 32,69 32,69 32,69 32,69 32,69
Oppervlakte Oppervlakte bebouwing in bouwrijp in percentage percentage 70% 30% 1.820,40 4.247,60 1.425,90 3.327,10 795,60 1.856,40 667,80 1.558,20 235,20 548,80 1.092,00 2.548,00 631,80 1.474,20
Totaal bruto 106,12 106,12 106,12 106,12 106,12 106,12 106,12
Oppervlakte woonrijp in percentage 70% 4.247,60 3.327,10 1.856,40 1.558,20 548,80 2.548,00 1.474,20
Totaal Riolering investering hoofdgebouw BRM+WRM in meters 450.755,31 74,00 353.071,85 148,00 197.001,17 25,00 165.356,18 38,00 58.238,66 62,00 270.393,76 144,00 156.442,10 112,00
Totaal
Oppervlakte m2afgerond BRM en WRM
6.068,00 4.753,00 2.652,00 2.226,00 784,00 3.640,00 2.106,00
4.248 3.327 1.856 1.558 549 2.548 1.474
Investering riolering
Totaal investering riool
371,36 371,36 371,36 371,36 371,36 371,36 371,36
35.480,64 rioolaansluiting zuidzijde Anthoni van Leeuwenhoekkade 62.961,28 rioolaansluiting noordzijde Rosenburgherlaan 17.284,00 rioolaansluiting noordzijde Rosenburgherlaan 22.111,68 rioolaansluiting Brunita J. Gemmekelaan zuidzijde 31.024,32 rioolaansluiting Koninklijke Marinelaan oostzijde 61.475,84 rioolaansluiting Burgemeester van Eijklaan 49.592,32 rioolaansluiting Richard Wagnerlaan zuidoostzijde
Locatie flexwoningen Voorschioten vrijdag 01 maart 2024 HV Sweco Nederland B.V.
1. IJsbaan 6068 m2
Alle bedragen zijn in Euro (EUR) RAMINGS POST NUMMER
OMSCHRIJVING
EEN HEID
1 101010
Voorbereidende werkzaamheden fase 1 Klicmelding (verplicht digitaal aanwezig op project door de aannemer) EUR
101030 101040 101050 101060 101070 101080 101090
Toepassen tijdelijke afrastering (bouwhekken) ca. 100 mtr Toepassen bouwbord fase 1 Toepassen rijplaten tijdelijke een werkingang en in terrein Schoonhouden rijplaten gedurende uitvoeringsperiode Bouwplaatsvoorzieningen Verkeersmaatregelen (werkverkeer en verkeersstromen) Voorzieningen tbv VGM en aansluiting openbare ruimte
2 111 111010
HOEVEELHEID RESULTAATS VERPLICHTING
PRIJS PER EENHEID IN EURO
TOTAAL BEDRAG IN EURO
IJsbaan 6068 m2 zetting 12 mnd 150,00 V
1,00
150,00
maand stuk EUR EUR EUR EUR EUR
12,00 V 1,00 V 15.000,00 V 4.000,00 V 5.000,00 V 2.500,00 V 4.000,00 V
800,00 1.500,00 1,00 1,00 1,00 1,00 1,00
9.600,00 1.500,00 15.000,00 4.000,00 5.000,00 2.500,00 4.000,00
Voorbelastingskosten Oppervlakte 6068 m2 Voorbelastingskosten
Eur
784.524,40 V
1,00
784.524,40
12 122010
Bouwrijpmaken terrein Bouwrijpmaken terrein 70%
m2
4.247,60 V
73,43
311.901,27
13 131010
Woonrijpmaken terrein Woonrijpmaken terrein 70%
m2
4.247,60 V
32,69
138.854,04
14 140010 140020
Rioleringen Kosten riolering Aansluiting op bestaand riool
m EUR
74,00 V 1,00 V
371,36 8.000,00
27.480,64 8.000,00
9 91 919990
Overige eenmalige kosten EENMALIGE KOSTEN Revisietekeningen
EUR
1.500,00 N
1,00
1.500,00
Subtotaal
929990 939990 949990 959990
Uitvoeringskosten Algemene kosten Winst en risico Eenmalige kosten
Totaalbedrag excl. btw Sweco Nederland B.V. De 1e maart 2024
€
6% 6% 6% 2%
78.840,62 N 78.840,62 N 78.840,62 N 26.280,21 N
1,00 1,00 1,00 1,00
1.314.010,35
78.840,62 78.840,62 78.840,62 26.280,21
€
1.576.812,42
Locatie flexwoningen Voorschioten vrijdag 01 maart 2024 HV Sweco Nederland B.V.
2. Gemeentewerf ND 4753 m2
Alle bedragen zijn in Euro (EUR) RAMINGS POST NUMMER
OMSCHRIJVING
EEN HEID
1 101010
Voorbereidende werkzaamheden fase 1 Klicmelding (verplicht digitaal aanwezig op project door de aannemer) EUR
101030 101040 101050 101060 101070 101080 101090
Toepassen tijdelijke afrastering (bouwhekken) ca. 100 mtr Toepassen bouwbord fase 1 Toepassen rijplaten tijdelijke een werkingang en in terrein Schoonhouden rijplaten gedurende uitvoeringsperiode Bouwplaatsvoorzieningen Verkeersmaatregelen (werkverkeer en verkeersstromen) Voorzieningen tbv VGM en aansluiting openbare ruimte
2 111 111010
HOEVEELHEID RESULTAATS VERPLICHTING
PRIJS PER EENHEID IN EURO
TOTAAL BEDRAG IN EURO
1. Gemeentewerf ND 4753 m2 150,00 V
1,00
150,00
maand stuk EUR EUR EUR EUR EUR
12,00 V 1,00 V 15.000,00 V 4.000,00 V 5.000,00 V 2.500,00 V 4.000,00 V
800,00 1.500,00 1,00 1,00 1,00 1,00 1,00
9.600,00 1.500,00 15.000,00 4.000,00 5.000,00 2.500,00 4.000,00
Voorbelastingskosten Oppervlakte 4753 m2 Voorbelastingskosten
Eur
142.981,46 V
1,00
142.981,46
12 122010
Bouwrijpmaken terrein Bouwrijpmaken terrein 70%
m2
3.327,10 V
73,43
244.308,95
13 131010
Woonrijpmaken terrein Woonrijpmaken terrein 70%
m2
3.327,10 V
32,69
108.762,90
14 140010 140020
Rioleringen Kosten riolering Aansluiting op bestaand riool
m EUR
148,00 V 1,00 V
371,36 8.000,00
54.961,28 8.000,00
9 91 919990
Overige eenmalige kosten EENMALIGE KOSTEN Revisietekeningen
EUR
1.500,00 N
1,00
1.500,00
Subtotaal
929990 939990 949990 959990
Uitvoeringskosten Algemene kosten Winst en risico Eenmalige kosten
Totaalbedrag excl. btw Sweco Nederland B.V. De 1e maart 2024
€
6% 6% 6% 2%
36.135,88 N 36.135,88 N 36.135,88 N 12.045,29 N
1,00 1,00 1,00 1,00
602.264,59
36.135,88 36.135,88 36.135,88 12.045,29
€
722.717,51
Locatie flexwoningen Voorschioten vrijdag 01 maart 2024 HV Sweco Nederland B.V.
3. Gemeentewerf ZD 2652 m2
Alle bedragen zijn in Euro (EUR) RAMINGS POST NUMMER
OMSCHRIJVING
EEN HEID
1 101010
Voorbereidende werkzaamheden fase 1 Klicmelding (verplicht digitaal aanwezig op project door de aannemer) EUR
101030 101040 101050 101060 101070 101080 101090
Toepassen tijdelijke afrastering (bouwhekken) ca. 100 mtr Toepassen bouwbord fase 1 Toepassen rijplaten tijdelijke een werkingang en in terrein Schoonhouden rijplaten gedurende uitvoeringsperiode Bouwplaatsvoorzieningen Verkeersmaatregelen (werkverkeer en verkeersstromen) Voorzieningen tbv VGM en aansluiting openbare ruimte
2 111 111010
HOEVEELHEID RESULTAATS VERPLICHTING
PRIJS PER EENHEID IN EURO
TOTAAL BEDRAG IN EURO
3. Gemeentewerf ZD 2652 m2 150,00 V
1,00
150,00
maand stuk EUR EUR EUR EUR EUR
12,00 V 1,00 V 15.000,00 V 4.000,00 V 5.000,00 V 2.500,00 V 4.000,00 V
800,00 1.500,00 1,00 1,00 1,00 1,00 1,00
9.600,00 1.500,00 15.000,00 4.000,00 5.000,00 2.500,00 4.000,00
Voorbelastingskosten Oppervlakte 2652 m2 Voorbelastingskosten
Eur
82.430,64 V
1,00
82.430,64
12 122010
Bouwrijpmaken terrein Bouwrijpmaken terrein 70%
m2
1.856,40 V
73,43
136.315,45
13 131010
Woonrijpmaken terrein Woonrijpmaken terrein 70%
m2
1.856,40 V
32,69
60.685,72
14 140010 140020
Rioleringen Kosten riolering Aansluiting op bestaand riool
m EUR
25,00 V 1,00 V
371,36 8.000,00
9.284,00 8.000,00
9 91 919990
Overige eenmalige kosten EENMALIGE KOSTEN Revisietekeningen
EUR
1.500,00 N
1,00
1.500,00
Subtotaal
929990 939990 949990 959990
Uitvoeringskosten Algemene kosten Winst en risico Eenmalige kosten
Totaalbedrag excl. btw Sweco Nederland B.V. De 1e maart 2024
€
6% 6% 6% 2%
20.397,95 N 20.397,95 N 20.397,95 N 6.799,32 N
1,00 1,00 1,00 1,00
339.965,81
20.397,95 20.397,95 20.397,95 6.799,32
€
407.958,97
Locatie flexwoningen Voorschioten vrijdag 01 maart 2024 HV Sweco Nederland B.V.
4. Geestwoningpad 2226 m2
Alle bedragen zijn in Euro (EUR) RAMINGS POST NUMMER
OMSCHRIJVING
EEN HEID
1 101010
Voorbereidende werkzaamheden fase 1 Klicmelding (verplicht digitaal aanwezig op project door de aannemer) EUR
101030 101040 101050 101060 101070 101080 101090
Toepassen tijdelijke afrastering (bouwhekken) ca. 100 mtr Toepassen bouwbord fase 1 Toepassen rijplaten tijdelijke een werkingang en in terrein Schoonhouden rijplaten gedurende uitvoeringsperiode Bouwplaatsvoorzieningen Verkeersmaatregelen (werkverkeer en verkeersstromen) Voorzieningen tbv VGM en aansluiting openbare ruimte
2 111 111010
HOEVEELHEID RESULTAATS VERPLICHTING
PRIJS PER EENHEID IN EURO
TOTAAL BEDRAG IN EURO
4. Geestwoningpad 2226 m2 150,00 V
1,00
150,00
maand stuk EUR EUR EUR EUR EUR
12,00 V 1,00 V 15.000,00 V 4.000,00 V 5.000,00 V 2.500,00 V 4.000,00 V
800,00 1.500,00 1,00 1,00 1,00 1,00 1,00
9.600,00 1.500,00 15.000,00 4.000,00 5.000,00 2.500,00 4.000,00
Voorbelastingskosten Oppervlakte 2226 m2 Voorbelastingskosten
Eur
60.358,92 V
1,00
60.358,92
12 122010
Bouwrijpmaken terrein Bouwrijpmaken terrein 70%
m2
1.558,20 V
73,43
114.418,63
13 131010
Woonrijpmaken terrein Woonrijpmaken terrein 70%
m2
1.558,20 V
32,69
50.937,56
14 140010 140020
Rioleringen Kosten riolering Aansluiting op bestaand riool
m EUR
38,00 V 1,00 V
371,36 8.000,00
14.111,68 8.000,00
9 91 919990
Overige eenmalige kosten EENMALIGE KOSTEN Revisietekeningen
EUR
1.500,00 N
1,00
1.500,00
Subtotaal
929990 939990 949990 959990
Uitvoeringskosten Algemene kosten Winst en risico Eenmalige kosten
Totaalbedrag excl. btw Sweco Nederland B.V. De 1e maart 2024
€
6% 6% 6% 2%
17.464,61 N 17.464,61 N 17.464,61 N 5.821,54 N
1,00 1,00 1,00 1,00
291.076,78
17.464,61 17.464,61 17.464,61 5.821,54
€
349.292,14
Locatie flexwoningen Voorschioten vrijdag 01 maart 2024 HV Sweco Nederland B.V.
5. Koninklijke Marinelaan 784 m2
Alle bedragen zijn in Euro (EUR) RAMINGS POST NUMMER
OMSCHRIJVING
EEN HEID
1 101010
Voorbereidende werkzaamheden fase 1 Klicmelding (verplicht digitaal aanwezig op project door de aannemer) EUR
101030 101040 101050 101060 101070 101080 101090
Toepassen tijdelijke afrastering (bouwhekken) ca. 100 mtr Toepassen bouwbord fase 1 Toepassen rijplaten tijdelijke een werkingang en in terrein Schoonhouden rijplaten gedurende uitvoeringsperiode Bouwplaatsvoorzieningen Verkeersmaatregelen (werkverkeer en verkeersstromen) Voorzieningen tbv VGM en aansluiting openbare ruimte
2 111 111010
HOEVEELHEID RESULTAATS VERPLICHTING
PRIJS PER EENHEID IN EURO
TOTAAL BEDRAG IN EURO
5. Koninklijke Marinelaan 784 m2 150,00 V
1,00
150,00
maand stuk EUR EUR EUR EUR EUR
12,00 V 1,00 V 15.000,00 V 4.000,00 V 5.000,00 V 2.500,00 V 4.000,00 V
800,00 1.500,00 1,00 1,00 1,00 1,00 1,00
9.600,00 1.500,00 15.000,00 4.000,00 5.000,00 2.500,00 4.000,00
Voorbelastingskosten Oppervlakte 784 m2 Voorbelastingskosten
Eur
33.596,80 V
1,00
33.596,80
12 122010
Bouwrijpmaken terrein Bouwrijpmaken terrein 70%
m2
548,80 V
73,43
40.298,38
13 131010
Woonrijpmaken terrein Woonrijpmaken terrein 70%
m2
548,80 V
32,69
17.940,27
14 140010 140020
Rioleringen Kosten riolering Aansluiting op bestaand riool
m EUR
62,00 V 1,00 V
371,36 8.000,00
23.024,32 8.000,00
9 91 919990
Overige eenmalige kosten EENMALIGE KOSTEN Revisietekeningen
EUR
1.500,00 N
1,00
1.500,00
Subtotaal
929990 939990 949990 959990
Uitvoeringskosten Algemene kosten Winst en risico Eenmalige kosten
Totaalbedrag excl. btw Sweco Nederland B.V. De 1e maart 2024
€
6% 6% 6% 2%
9.966,59 N 9.966,59 N 9.966,59 N 3.322,20 N
1,00 1,00 1,00 1,00
166.109,78
9.966,59 9.966,59 9.966,59 3.322,20
€
199.331,73
Locatie flexwoningen Voorschioten vrijdag 01 maart 2024 HV Sweco Nederland B.V.
6. Oude Stationslaantje 3640 m2
Alle bedragen zijn in Euro (EUR) RAMINGS POST NUMMER
OMSCHRIJVING
EEN HEID
1 101010
Voorbereidende werkzaamheden fase 1 Klicmelding (verplicht digitaal aanwezig op project door de aannemer) EUR
101030 101040 101050 101060 101070 101080 101090
Toepassen tijdelijke afrastering (bouwhekken) ca. 100 mtr Toepassen bouwbord fase 1 Toepassen rijplaten tijdelijke een werkingang en in terrein Schoonhouden rijplaten gedurende uitvoeringsperiode Bouwplaatsvoorzieningen Verkeersmaatregelen (werkverkeer en verkeersstromen) Voorzieningen tbv VGM en aansluiting openbare ruimte
2 111 111010
HOEVEELHEID RESULTAATS VERPLICHTING
PRIJS PER EENHEID IN EURO
TOTAAL BEDRAG IN EURO
6. Oude Stationslaantje 3640 m2 150,00 V
1,00
150,00
maand stuk EUR EUR EUR EUR EUR
12,00 V 1,00 V 15.000,00 V 4.000,00 V 5.000,00 V 2.500,00 V 4.000,00 V
800,00 1.500,00 1,00 1,00 1,00 1,00 1,00
9.600,00 1.500,00 15.000,00 4.000,00 5.000,00 2.500,00 4.000,00
Voorbelastingskosten Oppervlakte 3640 m2 Voorbelastingskosten
Eur
100.494,40 V
1,00
100.494,40
12 122010
Bouwrijpmaken terrein Bouwrijpmaken terrein 70%
m2
2.548,00 V
73,43
187.099,64
13 131010
Woonrijpmaken terrein Woonrijpmaken terrein 70%
m2
2.548,00 V
32,69
83.294,12
14 140010 140020
Rioleringen Kosten riolering Aansluiting op bestaand riool
m EUR
144,00 V 1,00 V
371,36 8.000,00
53.475,84 8.000,00
9 91 919990
Overige eenmalige kosten EENMALIGE KOSTEN Revisietekeningen
EUR
1.500,00 N
1,00
1.500,00
Subtotaal
929990 939990 949990 959990
Uitvoeringskosten Algemene kosten Winst en risico Eenmalige kosten
Totaalbedrag excl. btw Sweco Nederland B.V. De 1e maart 2024
€
6% 6% 6% 2%
28.536,84 N 28.536,84 N 28.536,84 N 9.512,28 N
1,00 1,00 1,00 1,00
475.614,00
28.536,84 28.536,84 28.536,84 9.512,28
€
570.736,80