Bijlage 3 Flexwoningen Voorschoten: geotechnische haalbaarheidsstudie

Gemeenteraad Voorschoten 23 mei 2024, gemeente voorschotenBij agendapunt: Locaties flexwoningen18.610 woorden

Open het PDF bij de gemeente ↗Naar de vergadering →

Tekst van het document

Uit het bestand gehaald, zonder opmaak, tabellen en afbeeldingen · deel 2 van 2

0,000 -0,870

Co-ordinates [m] 100,000 -0,870

2.2 Pl-lines Pl-line number 1 -X1 -Y-

2.3 General Data Soil model: Consolidation model: Strain model: Groundwater level: Unit weight of water: Stress distribution - Soil: - Loads: End of consolidation: With maintain profile (only for non uniform loads) - Material: - Time: - Unit weight above phreatic.: - Unit weight below phreatic: - Iteration stop criterium: Pc (initial): Pc (per step): Creep rate reference time: No imaginary surface With submerging (only for non uniform loads) - Iteration stop criterium : Load column width - Non-Uniform Loads : - Trapeziform Loads :

4-3-2024

NEN Bjerrum Darcy Linear Initial determined by Pl-line number 1 9,81 [kN/m³] Buisman None 10000,00 [days]

Superelevation 0,00 [days] 18,00 [kN/m³] 20,00 [kN/m³] 0,10 [m] Variable parallel to the initial effective stress Automatic increased to the final effective stresses 1,000 [days]

0,10 [m] 1,00 [m] 1,00 [m]

EO_1.0 180d

Page 3

<Not Registered> <Not Registered>

D-Settlement 21.2

2.4 Soil Profiles Layer number 10 9 8 7 6 5 4 3 2 1

Material name

Pl-line top

Zand, schoon, los Veen, slap Zand, schoon, los Zand, schoon, matig Klei, zwak zandig, sl... Klei, schoon, slap Veen, matig Klei, schoon, slap Veen, matig Zand, schoon, matig

Pl-line bottom 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1

2.5 Soil Properties Layer number 10 9 8 7 6 5 4 3 2 1

Drained

Unit weight Unsaturated Saturated [kN/m³] [kN/m³] 17,00 19,00 10,00 10,00 17,00 19,00 18,00 20,00 15,00 15,00 14,00 14,00 11,00 11,00 14,00 14,00 11,00 11,00 18,00 20,00

Yes No Yes Yes No No No No No Yes

Layer number

Storage type

10 9 8 7 6 5 4 3 2 1

Vert. cons. Vert. cons. Vert. cons. Vert. cons. Vert. cons. Vert. cons. Vert. cons. Vert. cons. Vert. cons. Vert. cons.

Layer number 10 9 8 7 6 5 4 3 2 1

POP [kN/m²] -

1,00 2,00 1,00 1,00 2,20 1,73 1,99 1,73 1,99 1,00

1,000E+04 1,000E+04 1,000E+04 1,000E+04 1,000E+04 1,000E+04 -

Layer number

Reloading/ swelling ratio RR [-] 0,0038000 0,1533000 0,0038000 0,0013000 0,0767000

Compression ratio CR [-] 0,0115000 0,4600000 0,0115000 0,0038000 0,2300000

Coeff. of sec. compression Ca [-] 0,0000000 0,0230000 0,0000000 0,0000000 0,0131000

10 9 8 7 6 4-3-2024

Vert. consolid. coefficient Cv [m²/s] 1,00E-07 1,00E-06 1,00E-08 1,00E-07 1,00E-08 1,00E-07 -

Vertical permeability [m/s]

OCR [-]

Equiv. age [days]

Permeability strain mod. [-] -

EO_1.0 180d

-

Initial vertical permeability [m/s] -

Reloading/ swelling index Cr [-] -

Compression index Cc [-] -

Initial void ratio (e0) [-] Page 4

<Not Registered> <Not Registered> Layer number

Reloading/ swelling ratio RR [-] 0,1095000 0,1022000 0,1095000 0,1022000 0,0013000

5 4 3 2 1

Compression ratio CR [-] 0,3286000 0,3067000 0,3286000 0,3067000 0,0038000

Coeff. of sec. compression Ca [-] 0,0131000 0,0153000 0,0131000 0,0153000 0,0000000

Reloading/ swelling index Cr [-] -

D-Settlement 21.2 Compression index Cc [-] -

Initial void ratio (e0) [-] -

2.6 Non-Uniform Loads Load number

Time [days]

1 2

0 0

Load number 1 -X1 -Y2 -X2 -Y-

Unit weight Unsaturated Saturated [kN/m³] [kN/m³] 18,00 20,00 18,00 20,00

10,00 0,00 10,00 0,00

15,00 1,00 15,00 2,00

Co-ordinates [m] 80,00 85,00 1,00 0,00 80,00 85,00 2,00 0,00

2.7 Verticals Vertical number

X co-ordinates [m] 1

4-3-2024

50,000

EO_1.0 180d

Page 5

<Not Registered> <Not Registered>

D-Settlement 21.2

3 Results per Vertical 3.1 Results for Vertical 1 (X = 50,00 m; Z = 0,00 m)

Depth [m] 0,000 -0,100 -0,200 -0,300 -0,400 -0,450 -0,500 -0,600 -0,700 -0,800 -0,870 -0,900 -0,900 -1,000 -1,150 -1,400 -1,400 -2,000 -2,500 -3,000 -3,600 -3,600 -4,350 -5,150 -5,900 -6,700 -6,700 -7,450 -8,200 -8,200 -8,850 -9,450 -10,100 -10,700 -10,700 -10,950 -11,200 -11,200 -12,200 -13,200 -13,200 -13,500 -13,800 -13,800 -14,500 -15,500 -16,500 -16,900 -17,600 -18,600 -19,600 -20,000

4-3-2024

Effective Stress [kPa] 23,616 25,315 27,015 28,715 30,415 31,265 32,115 33,640 34,559 35,478 36,121 36,397 36,397 36,415 36,444 36,491 36,492 42,005 46,600 51,194 56,707 56,708 64,348 72,497 80,136 88,282 88,282 92,128 95,975 95,975 97,083 98,446 100,367 102,593 102,593 102,886 103,188 103,188 108,548 115,134 115,134 115,590 116,055 116,055 123,153 133,288 143,414 147,463 154,544 164,654 174,755 178,794

Hydraulic head [m] 0,000 -0,100 -0,200 -0,300 -0,400 -0,450 -0,500 -0,600 -0,700 -0,800 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,866 -0,862 -0,862 -0,699 -0,582 -0,502 -0,474 -0,474 -0,474 -0,475 -0,475 -0,598 -0,846 -0,846 -0,858 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870 -0,870

Loading [kPa] 23,615 23,615 23,615 23,615 23,615 23,615 23,615 23,440 22,659 21,878 21,331 21,331 21,331 21,331 21,331 21,331 21,331 21,331 21,330 21,330 21,329 21,329 21,327 21,324 21,320 21,315 21,315 21,308 21,298 21,298 21,289 21,278 21,264 21,250 21,250 21,243 21,236 21,236 21,204 21,165 21,165 21,152 21,138 21,138 21,104 21,048 20,984 20,957 20,905 20,825 20,737 20,699

EO_1.0 180d

Settlement [m] 0,313 0,312 0,310 0,309 0,308 0,308 0,307 0,306 0,306 0,305 0,305 0,305 0,305 0,285 0,256 0,208 0,208 0,205 0,203 0,201 0,199 0,199 0,198 0,197 0,197 0,196 0,196 0,175 0,155 0,155 0,133 0,116 0,098 0,083 0,083 0,077 0,071 0,071 0,047 0,019 0,019 0,011 0,002 0,002 0,002 0,002 0,001 0,001 0,001 0,000 0,000 0,000

Page 6

<Not Registered> <Not Registered>

D-Settlement 21.2

4 Settlements 4.1 Settlements Vertical number 1

X co-ordinate [m] 50,00

Z co-ordinate [m] 0,00

Surface level [m] 0,00

Settlement

Part of final settlement [%] 68,206

Settlement [m] 0,313

4.2 Residual Times Vertical number

Time [days] 1

180

[m] 0,214

Residual settlements [m] 0,100

4.3 Maintain Profile Calculation Results Load 1 consists of 70,000 m3 per Width Load 2 consists of 70,000 m3 per Width Load 3 consists of 70,000 m3 per Width The extra amount of soil to be added is 23,396 m3 per Width This equals the found settlements for non-uniform loads

End of Report

4-3-2024

EO_1.0 180d

Page 7

Bijlage 5

Fundering op staal

14-03-2024 Projectnummer: 51020359 Onderwerp: Haalaarheidsonderzoek flexwoningen

Sweco | Flexwoningen Voorschoten Geotechnische haalbaarheidsstudie Projectnummer 51020359 Datum 14-03-2024

Versie D1.0

Documentreferentie NL24-648800269-74607

Report for D-Foundations 23.1 Design and Verification according to Eurocode 7 of Bearing/Tension Piles and Shallow Foundations Developed by Deltares

Date of report: Time of report: Report with version:

4-3-2024 16:44:46 23.1.1.40340

Date of calculation: 4-3-2024 Time of calculation: 16:40:02 Calculated with version: 23.1.1.40340 File name:

Fundering op Staal

Project identification:

Staalfundatie sonderingen Gemeente Voorschoten D-Foundations Fundering op Staal

D-Foundations 23.1

1 Table of Contents 1 Table of Contents 2 Input Data 2.1 General Input Data 2.2 General Report Data 2.3 Application Area Model Shallow Foundations 2.4 Superstructure 2.5 General CPT Data 2.5.1 View of CPT's in Foundation Plan 2.6 Soil Data 2.6.1 Soil Profile IJsbaan - CPT000000158049 2.6.2 Soil Profile Geestwoningpad - CPT000000019295 2.6.3 Soil Profile Koninklijke marinelaan - S30H02102 2.6.4 Soil Profile Oude Stationslaantje - CPT000000022126 2.6.5 Soil Profile Het Wedde (Zwembad) - CPT000000090715 2.6.6 Soil Profile Gemeentewerf Rosenburgherlaan - S40-220 2.7 Foundation Data 2.8 Foundation Plan 2.8.1 View of Foundation Plan 2.9 Load Data 2.9.1 Vertical Loads 2.9.2 Horizontal Loads 2.10 Overruled Parameters 2.11 Model Options 3 Shallow Foundations (EC7-NL): Results Maximization Vertical Loads 3.1 Errors and Warnings 3.2 Results maximization vertical loads, model Shallow Foundations 3.3 Results at the Last Iteration: Verification of Limit State EQU 3.3.1 Vertical Bearing Capacity, Undrained Situation 3.3.2 Vertical Bearing Capacity, Drained Situation 3.3.3 Horizontal Bearing Capacity 3.3.4 Stability 3.4 Results at the Last Iteration: Verification of Limit State STR/GEO 3.4.1 Verification of Settlement at Limit State STR/GEO 3.5 Results at the Last Iteration: Verification of Serviceability Limit State 3.5.1 Verification of the Serviceability Limit State 3.6 Additional

Information

4-3-2024

Fundering op Staal

2 3 3 3 3 3 3 3 4 4 5 6 7 8 9 10 10 10 11 11 11 11 11 12 12 12 12 12 13 13 13 13 13 14 14 14

Page 2

D-Foundations 23.1

2 Input Data 2.1 General Input Data Model

Shallow Foundations (EC7-NL)

2.2 General Report Data Geotechnical consultant : Design engineer superstructure : Principal : Title 1 : Title 2 : Title 3 : Number of project : Location of project :

Staalfundatie sonderingen Gemeente Voorschoten D-Foundations Fundering op Staal 51020359

2.3 Application Area Model Shallow Foundations The verifications performed by the model Shallow Foundation of D-FOUNDATIONS concern shallow foundations on which only static or quasi-static loads work. The foundation surface must be practically level and should not exceed an angle of 2.5 degrees with the horizon.

2.4 Superstructure Rigidity of the superstructure :

Non-Rigid

2.5 General CPT Data Number of CPT's :

6

2.5.1 View of CPT's in Foundation Plan

4-3-2024

Fundering op Staal

Page 3

D-Foundations 23.1 Name CPT

X-coordinate [m] 0,00 89561,90 0,00 89975,00 91080,74 89590,10

IJsbaan -.. Geestwonin.. Koninklijk.. Oude Stati.. Het Wedde.. Gemeentewe..

Y-coordinate [m] 0,00 459915,10 0,00 460382,00 461582,82 459488,10

2.6 Soil Data Number of soilprofiles:

6

2.6.1 Soil Profile IJsbaan - CPT000000158049 Belonging to CPT Surface level in [m. reference level] : Phreatic level in [m. reference level] : Placement depth of foundation element in [m R.L.] = Concentration value according to Frohlich [-] = Number of layers in profile :

Number layer 1 2 3 4 5 6 7

4-3-2024

Level top layer [m R.L.] -1,500 -1,800 -4,900 -9,000 -9,500 -12,500 -13,000

Gamma [kN/m3] 14,00 10,00 14,00 10,00 14,00 12,00 18,00

Gamma sat [kN/m3] 14,00 10,00 14,00 10,00 14,00 12,00 20,00

IJsbaan - CPT000000158049 -1,50 -1,77 -1,70 3 7

Phi

Cohesion

f;undr

Cc

Ca

[deg] 17,50 15,00 17,50 15,00 17,50 15,00 32,50

[kPa] 0,00 1,00 0,00 1,00 0,00 2,50 0,00

[kPa] 25,00 10,00 25,00 10,00 25,00 20,00 0,00

[-] 0,33 0,46 0,33 0,46 0,33 0,31 0,00

[-] 0,01 0,02 0,01 0,02 0,01 0,02 0,00

Fundering op Staal

Page 4

D-Foundations 23.1 Number layer 1 2 3 4 5 6 7

Level top layer [m R.L.] -1,500 -1,800 -4,900 -9,000 -9,500 -12,500 -13,000

e0 [-] 0,00 0,00 0,00 0,00 0,00 0,00 0,26

Material type Clay Peat Clay Peat Clay Peat Sand

2.6.2 Soil Profile Geestwoningpad - CPT000000019295 Belonging to CPT Surface level in [m. reference level] : Phreatic level in [m. reference level] : Placement depth of foundation element in [m R.L.] = Concentration value according to Frohlich [-] = Number of layers in profile :

Number layer 1 2 3 4 5 6 Number layer 1 2 3 4-3-2024

Level top layer [m R.L.] 0,300 -7,200 -7,600 -10,400 -13,200 -13,700

Gamma

Level top layer [m R.L.] 0,300 -7,200 -7,600

e0

[kN/m3] 17,00 14,00 17,00 14,00 12,00 18,00

[-] 0,00 0,00 0,00

Gamma sat [kN/m3] 19,00 14,00 19,00 14,00 12,00 20,00

Geestwoningpad - CPT000000019295 0,30 -0,87 0,10 3 6

Phi

Cohesion

f;undr

Cc

Ca

[deg] 30,00 17,50 30,00 17,50 15,00 32,50

[kPa] 0,00 0,00 0,00 0,00 2,50 0,00

[kPa] 0,00 25,00 0,00 25,00 20,00 0,00

[-] 0,01 0,33 0,01 0,33 0,31 0,00

[-] 0,00 0,01 0,00 0,01 0,02 0,00

Material type Sand Clay Sand Fundering op Staal

Page 5

D-Foundations 23.1 Number layer 4 5 6

Level top layer [m R.L.] -10,400 -13,200 -13,700

e0 [-] 0,00 0,00 0,26

Material type Clay Peat Sand

2.6.3 Soil Profile Koninklijke marinelaan - S30H02102 Belonging to CPT Surface level in [m. reference level] : Phreatic level in [m. reference level] : Placement depth of foundation element in [m R.L.] = Concentration value according to Frohlich [-] = Number of layers in profile :

Number layer 1 2 3 4 5 6 7 Number layer 1 2 3 4 5 6 7 4-3-2024

Level top layer [m R.L.] 0,400 -0,600 -3,000 -4,500 -8,600 -12,500 -13,000

Gamma

Level top layer [m R.L.] 0,400 -0,600 -3,000 -4,500 -8,600 -12,500 -13,000

e0

[kN/m3] 17,00 10,00 17,00 14,00 17,00 12,00 18,00

[-] 0,00 0,00 0,00 0,00 0,00 0,00 0,26

Gamma sat [kN/m3] 19,00 10,00 19,00 14,00 19,00 12,00 20,00

Koninklijke marinelaan - S30H02102 0,40 -0,61 0,20 3 7

Phi

Cohesion

f;undr

Cc

Ca

[deg] 30,00 15,00 30,00 17,50 30,00 15,00 32,50

[kPa] 0,00 1,00 0,00 0,00 0,00 2,50 0,00

[kPa] 0,00 10,00 0,00 25,00 0,00 20,00 0,00

[-] 0,01 0,46 0,01 0,33 0,01 0,31 0,00

[-] 0,00 0,02 0,00 0,01 0,00 0,02 0,00

Material type Sand Peat Sand Clay Sand Peat Sand Fundering op Staal

Page 6

D-Foundations 23.1 2.6.4 Soil Profile Oude Stationslaantje - CPT000000022126 Belonging to CPT Surface level in [m. reference level] : Phreatic level in [m. reference level] : Placement depth of foundation element in [m R.L.] = Concentration value according to Frohlich [-] = Number of layers in profile :

Number layer 1 2 3 4 5 6 7 8 9 10 11 12 Number layer 1 2 3 4 5 6 7 8 4-3-2024

Level top layer [m R.L.] -0,100 -0,700 -1,000 -7,000 -8,400 -10,000 -10,500 -11,000 -11,300 -12,300 -13,000 -13,500

Gamma

Level top layer [m R.L.] -0,100 -0,700 -1,000 -7,000 -8,400 -10,000 -10,500 -11,000

e0

[kN/m3] 17,00 10,00 17,00 15,00 18,00 14,00 12,00 14,00 17,00 14,00 12,00 18,00

[-] 0,00 0,00 0,00 0,01 0,26 0,00 0,00 0,00

Gamma sat [kN/m3] 19,00 10,00 19,00 15,00 20,00 14,00 12,00 14,00 19,00 14,00 12,00 20,00

Oude Stationslaantje - CPT000000022126 -0,10 -1,02 -0,30 3 12

Phi

Cohesion

f;undr

Cc

Ca

[deg] 30,00 15,00 30,00 22,50 32,50 17,50 15,00 17,50 30,00 17,50 15,00 32,50

[kPa] 0,00 1,00 0,00 0,00 0,00 0,00 2,50 0,00 0,00 0,00 2,50 0,00

[kPa] 0,00 10,00 0,00 40,00 0,00 25,00 20,00 25,00 0,00 25,00 20,00 0,00

[-] 0,01 0,46 0,01 0,23 0,00 0,33 0,31 0,33 0,01 0,33 0,31 0,00

[-] 0,00 0,02 0,00 0,08 0,00 0,01 0,02 0,01 0,00 0,01 0,02 0,00

Material type Sand Peat Sand Clay Sand Clay Peat Clay Fundering op Staal

Page 7

D-Foundations 23.1 Number layer 9 10 11 12

Level top layer [m R.L.] -11,300 -12,300 -13,000 -13,500

e0 [-] 0,00 0,00 0,00 0,26

Material type Sand Clay Peat Sand

2.6.5 Soil Profile Het Wedde (Zwembad) - CPT000000090715 Belonging to CPT Surface level in [m. reference level] : Phreatic level in [m. reference level] : Placement depth of foundation element in [m R.L.] = Concentration value according to Frohlich [-] = Number of layers in profile :

Number layer 1 2 3 4 5 6 7 8 9 Number layer 1 2 3 4 4-3-2024

Level top layer [m R.L.] -0,800 -1,700 -2,600 -3,200 -4,300 -7,700 -10,400 -12,700 -13,200

Gamma

Level top layer [m R.L.] -0,800 -1,700 -2,600 -3,200

e0

[kN/m3] 17,00 10,00 14,00 17,00 18,00 17,00 14,00 12,00 18,00

[-] 0,00 0,00 0,00 0,00

Gamma sat [kN/m3] 17,00 10,00 14,00 19,00 18,00 19,00 14,00 12,00 20,00

Het Wedde (Zwembad) - CPT000000090715 -0,80 -1,67 -1,00 3 9

Phi

Cohesion

f;undr

Cc

Ca

[deg] 17,50 15,00 17,50 30,00 27,50 30,00 17,50 15,00 32,50

[kPa] 5,00 1,00 0,00 0,00 0,00 0,00 0,00 2,50 0,00

[kPa] 50,00 10,00 25,00 0,00 0,00 0,00 25,00 20,00 0,00

[-] 0,15 0,46 0,33 0,01 0,09 0,01 0,33 0,31 0,00

[-] 0,01 0,02 0,01 0,00 0,00 0,00 0,01 0,02 0,00

Material type Clay Peat Clay Sand Fundering op Staal

Page 8

D-Foundations 23.1 Number layer 5 6 7 8 9

Level top layer [m R.L.] -4,300 -7,700 -10,400 -12,700 -13,200

e0 [-] 0,00 0,00 0,00 0,00 0,26

Material type Clay Sand Clay Peat Sand

2.6.6 Soil Profile Gemeentewerf Rosenburgherlaan - S40-220 Belonging to CPT Surface level in [m. reference level] : Phreatic level in [m. reference level] : Placement depth of foundation element in [m R.L.] = Concentration value according to Frohlich [-] = Number of layers in profile :

Number layer 1 2 3 4 5 6 7 8 9 10 Number layer 1 2 4-3-2024

Level top layer [m R.L.] 0,000 -0,900 -1,400 -3,600 -6,700 -8,200 -10,700 -11,200 -13,200 -13,800

Gamma

Level top layer [m R.L.] 0,000 -0,900

e0

[kN/m3] 17,00 10,00 17,00 18,00 15,00 14,00 12,00 14,00 12,00 18,00

[-] 0,00 0,00

Gamma sat [kN/m3] 19,00 10,00 19,00 20,00 15,00 14,00 12,00 14,00 12,00 20,00

Gemeentewerf Rosenburgherlaan - S40-220 0,00 -0,87 -0,20 3 10

Phi

Cohesion

f;undr

Cc

Ca

[deg] 30,00 15,00 30,00 32,50 22,50 17,50 15,00 17,50 15,00 32,50

[kPa] 0,00 1,00 0,00 0,00 0,00 0,00 2,50 0,00 2,50 0,00

[kPa] 0,00 10,00 0,00 0,00 40,00 25,00 20,00 25,00 20,00 0,00

[-] 0,01 0,46 0,01 0,00 0,23 0,33 0,31 0,33 0,31 0,00

[-] 0,00 0,02 0,00 0,00 0,08 0,01 0,02 0,01 0,02 0,00

Material type Sand Peat Fundering op Staal

Page 9

D-Foundations 23.1 Number layer 3 4 5 6 7 8 9 10

Level top layer [m R.L.] -1,400 -3,600 -6,700 -8,200 -10,700 -11,200 -13,200 -13,800

e0 [-] 0,00 0,26 0,01 0,00 0,00 0,00 0,00 0,26

Material type Sand Sand Clay Clay Peat Clay Peat Sand

2.7 Foundation Data

Element name

Element shape

Rect 2000x2000

Rectangular elem.

Width

Length

Diameter

[m]

[m]

[m]

2,00

2,00

n.a.

Matching type name Rect 2000x2000 Rect 2000x2000 Rect 2000x2000 Rect 2000x2000 Rect 2000x2000 Rect 2000x2000

Matching profile name IJsbaan -... Gemeent... Geestwo... Koninklij... Oude St... Het Wed...

Matching load name Load Load Load Load Load Load

Type

Prefab

2.8 Foundation Plan

2.8.1 View of Foundation Plan

Element number/ name 1: IJsbaan 2: Gemeent... 3: Geestwo... 4: Marinela... 5: Oude Sta... 6: Zwemba...

4-3-2024

Xm

Ym

angle

[m] 0,00 10,00 20,00 30,00 40,00 50,00

[m] 0,00 0,00 0,00 0,00 0,00 0,00

[deg] 0,00 0,00 0,00 0,00 0,00 0,00

Fundering op Staal

Nearby slope None None None None None None

Page 10

D-Foundations 23.1

2.9 Load Data

2.9.1 Vertical Loads Load

Load

LS EQU/STR/GEO eLat. eLong. Vd [m] [m] [kN] 0,10 0,10 135,00

eLat. [m] 0,10

SLS eLong. [m] 0,10

SLS eH Hd [m] [kN] 0,00 0,00

Kappa [deg] 90,00

Vd [kN] 135,00

2.9.2 Horizontal Loads Load

Load

LS EQU/STR/GEO eH Hd [m] [kN] 0,00 0,00

2.10 Overruled Parameters All parameters according to standard.

2.11 Model Options Create intermediate results file Do not use the interaction model. Load factor Ultimate limit state / Serviceability limit state : Use the 20% limit to determine the settlement.

4-3-2024

Fundering op Staal

0,8330

Page 11

D-Foundations 23.1

3 Shallow Foundations (EC7-NL): Results Maximization Vertical Loads 3.1 Errors and Warnings The placement depth of the element does not comply with NEN 9997-1+C2:2017 6.4(c). This level should be at least 0.6 m below the surface level. Note: for elements placed alongside other buildings, this demand is 0.8 m. The input does not comply with the demands of the NEN, however a calculation can be performed. The results of this calculation are at best indicative.

3.2 Results maximization vertical loads, model Shallow Foundations Results for foundation element: IJsbaan The maximum allowable vertical load in limit state EQU/STR/GEO is : 1,30 kN. The maximum allowable vertical load in the Serviceability limit state is : 1,08 kN. Results for foundation element: Gemeentewe The maximum allowable vertical load in limit state EQU/STR/GEO is : 62,75 kN. The maximum allowable vertical load in the Serviceability limit state is : 52,27 kN. Results for foundation element: Geestwonin The maximum allowable vertical load in limit state EQU/STR/GEO is : 470,30 kN. The maximum allowable vertical load in the Serviceability limit state is : 391,76 kN. Results for foundation element: Marinelaan The maximum allowable vertical load in limit state EQU/STR/GEO is : 18,90 kN. The maximum allowable vertical load in the Serviceability limit state is : 15,74 kN. Results for foundation element: Oude Stati The maximum allowable vertical load in limit state EQU/STR/GEO is : 115,05 kN. The maximum allowable vertical load in the Serviceability limit state is : 95,84 kN. Results for foundation element: Zwembad The maximum allowable vertical load in limit state EQU/STR/GEO is : 11,30 kN. The maximum allowable vertical load in the Serviceability limit state is : 9,41 kN.

Results at the Last Iteration

3.3 Results at the Last Iteration: Verification of Limit State EQU Required by NEN 9997-1+C2:2017 art. 2.4.8: Ed <= Cd. 3.3.1 Vertical Bearing Capacity, Undrained Situation Found elem. name IJsbaan Gemeentewe Geestwonin Marinelaan Oude Stati Zwembad

4-3-2024

Calc. case Case A Case C NONE Case C Case C Case A

Vd

Rd

[kN] 1,30 114,03

[kN] 156,33 242,26

79,65 143,81 11,30

257,09 204,46 158,09

Vd Rd (Squeeze) (Squeeze) [kN] [kN] n.a. n.a. n.a. n.a. n.a. n.a. n.a.

Fundering op Staal

n.a. n.a. n.a.

Fpull

Result of verification

[kN] n.a. n.a.

PASSED PASSED

n.a. n.a. n.a.

PASSED PASSED PASSED

Page 12

D-Foundations 23.1 - the verification checks both Vd <= Rd and, if applicable, Vd;sq <= Rd;sq! - Fpull (0.5 * w' * cu;d) is the tension force in the element per meter which should be handled by the element in case of squeeze (see art. 6.5.2.2 (s) NEN 9997-1+C2:2017). 3.3.2 Vertical Bearing Capacity, Drained Situation Found elem. name IJsbaan Gemeentewe Geestwonin Marinelaan Oude Stati Zwembad

Calc. case Case B Case C Case B Case C Case C Case B

Vd

Rd

[kN] 1,30 62,75 470,30 18,90 115,05 11,30

[kN] 58,81 264,41 470,31 192,45 310,70 170,71

Vd (Punch) [kN] 0,00 114,03 0,00 79,65 143,81 0,00

Rd (Punch) [kN] 0,00 744,52 0,00 315,72 651,56 0,00

Result of verification PASSED PASSED PASSED PASSED PASSED PASSED

Note: both the situation with and without punch through are checked! 3.3.3 Horizontal Bearing Capacity Found elem. name IJsbaan Gemeentewe Geestwonin Marinelaan Oude Stati Zwembad

Hd [kN] 0,00 0,00 0,00 0,00 0,00 0,00

Rd undrained [kN] 0,00 0,00 0,00 0,00 0,00 0,00

Rd drained [kN] 0,00 0,00 0,00 0,00 0,00 0,00

Result of verification undrained PASSED PASSED n.a. PASSED PASSED PASSED

Result of verification drained PASSED PASSED PASSED PASSED PASSED PASSED

Note: As passive neither active soil loads are taken into account while determining the horizontal bearing capacity, the qualification "FAILED" in the above table is not an definitive answer. Additional calculations , based on NEN 9997-1+C2:2017 Chapter 9 including all factors, can lead to a different conclusion. 3.3.4 Stability Found elem. name IJsbaan Gemeentewe Geestwonin Marinelaan Oude Stati Zwembad

Minimum l' [m] 1,80 1,80 1,80 1,80 1,80 1,80

Minimum w' [m] 1,80 1,80 1,80 1,80 1,80 1,80

Phi`d [deg] 13,35 22,11 26,66 13,12 23,87 14,50

Tip over stability

Total stability

PASSED PASSED PASSED PASSED PASSED PASSED

PASSED PASSED PASSED PASSED PASSED PASSED

3.4 Results at the Last Iteration: Verification of Limit State STR/GEO Required by NEN 9997-1+C2:2017 art. 2.4.9: Sd <= Sreq.Sreq = 0,000 [m] Sd = s1;d + s2;d Note: The user-defined Sreq differs from the proposed value (0.15 m) as provided by NEN 9997-1+C2:2017. Less strict values should be reviewed carefully. 3.4.1 Verification of Settlement at Limit State STR/GEO Found elem. name IJsbaan Gemeentewe Geestwonin Marinelaan Oude Stati 4-3-2024

s1 (20%) [m] 0,028 0,093 0,033 0,045 0,116

s1;gd (5%) [m] 0,064 0,093 0,039 0,077 0,117

s2 [m] 0,122 0,058 0,000 0,103 0,035

Fundering op Staal

Result of verification (20%) PASSED PASSED PASSED PASSED PASSED

Result of verification (5%) FAILED FAILED PASSED FAILED FAILED Page 13

D-Foundations 23.1 Found elem. name Zwembad

s1 (20%) [m] 0,048

s1;gd (5%) [m] 0,062

s2 [m] 0,102

Result of verification (20%) PASSED

Result of verification (5%) FAILED

Note: the verification at 20% is demanded by the NEN, at 5% is recommended by Deltares! The maximum increase in soil tension found while calculating the settlement, is100 % of the effective foundation pressure. When using this design option, rotations are not considered.

3.5 Results at the Last Iteration: Verification of Serviceability Limit State Required by NEN 9997-1+C2:2017 art. 2.4.9: Sd <= Sreq. For houses, the requirement is : Sreq = 0.05 m. For other types of superstructures a different (well considered) requirement can be specified. Seq = 0,000 Sd = s1;d + s2;d Note: The user-defined Sreq differs from the imposed value (0.05 m) as provided by NEN 9997-1+C2:2017. 3.5.1 Verification of the Serviceability Limit State Found elem. name IJsbaan Gemeentewe Geestwonin Marinelaan Oude Stati Zwembad

s1 (20%) [m] 0,012 0,059 0,022 0,023 0,078 0,026

s1;gd (5%) [m] 0,019 0,060 0,023 0,043 0,079 0,038

s2 [m] 0,070 0,046 0,000 0,064 0,028 0,063

Result of verification (20%) PASSED PASSED PASSED PASSED PASSED PASSED

Result of verification (5%) PASSED PASSED PASSED PASSED PASSED PASSED

Note: the verification at 20% is demanded by the NEN, at 5% is recommended by Deltares! The maximum increase in soil tension found while calculating the settlement, is100 % of the effective foundation pressure. When using this design option, rotations are not considered.

3.6 Additional Information The maximum settlement at limit state STR/GEO is 0,150 meter and has been found at foundation element Oude Stati The maximum settlement at the Serviceability Limit State is 0,106 meter and has been found at foundation element Oude Stati

End of Report

4-3-2024

Fundering op Staal

Page 14

Bijlage 6

Paalfundering

14-03-2024 Projectnummer: 51020359 Onderwerp: Haalaarheidsonderzoek flexwoningen

Sweco | Flexwoningen Voorschoten Geotechnische haalbaarheidsstudie Projectnummer 51020359 Datum 14-03-2024

Versie D1.0

Documentreferentie NL24-648800269-74607

Report for D-Foundations 23.1 Design and Verification according to Eurocode 7 of Bearing/Tension Piles and Shallow Foundations Developed by Deltares

Date of report: Time of report: Report with version:

4-3-2024 16:28:37 23.1.1.40340

Date of calculation: 4-3-2024 Time of calculation: 16:27:39 Calculated with version: 23.1.1.40340 File name:

0.00 Rect 290x290

Project identification:

Geestwoningpad D-Foundations Paalfundatie D-Foundations 0.00 Rect 290x290

D-Foundations 23.1

1 Table of Contents 1 Table of Contents 2 Input Data 2.1 General Input Data 2.2 General Report Data 2.3 Application Area Model Bearing Piles 2.4 Superstructure 2.5 General CPT Data 2.5.1 View of CPT's in Foundation Plan 2.6 Soil Data 2.6.1 Soil Profile S1 2.7 Pile Types 2.7.1 Pile type : Rect 290x290 2.8 Foundation Plan 2.8.1 View of Foundation Plan 2.9 Excavation Data 2.10 Totalized Loads (design values) 2.11 Requirements 2.12 Overruled Parameters 2.13 Model Options 2.14 Model Options 3 Bearing Piles (EC7-NL): Results Complete Verification 3.1 Remarks 3.2 Calculation Parameters 3.2.1 Pile Factors 3.2.2 Pile type : Rect 290x290 3.3 Verification of Limit State EQU 3.4 Verification of Limit State STR/GEO 3.5 Verification of Serviceability Limit State 3.6 Additional Information 3.6.1 The bearing capacity of shaft and point at Limit state STR/GEO 3.6.2 The bearing capacity of shaft and point at the Serviceability Limit State

4-3-2024

0.00 Rect 290x290

2 3 3 3 3 3 3 3 4 4 5 5 5 5 5 6 6 6 6 6 7 7 7 7 7 7 8 8 8 9 9

Page 2

D-Foundations 23.1

2 Input Data 2.1 General Input Data Model

Bearing Piles (EC7-NL)

2.2 General Report Data Geotechnical consultant : Design engineer superstructure : Principal : Title 1 : Title 2 : Title 3 : Number of project : Location of project :

Geestwoningpad D-Foundations Paalfundatie D-Foundations 0.00 Rect 290x290 51020359

2.3 Application Area Model Bearing Piles The verifications performed by the model BEARING PILES of D-FOUNDATIONS concern pile foundations on which axial static or quasi-static loads cause pressures in the piles. The calculations of pile forces and pile displacements are based on Cone Penetration Tests. Possible rise of (tension-)piles and horizontal displacements of piles and/or pile groups are not taken into account.

2.4 Superstructure Rigidity of the superstructure :

Non-Rigid

2.5 General CPT Data Number of CPT's : Timing of CPT's :

1 CPT - Excavation - Install

2.5.1 View of CPT's in Foundation Plan

4-3-2024

0.00 Rect 290x290

Page 3

D-Foundations 23.1 Name CPT

Pile tip level [m R.L.] -19,00

S1

Top of pos. friction zone [m R.L.] -13,80

Bottom of neg. friction zone [m R.L.] -13,80

X-coordinate [m] 89590,10

Y-coordinate [m] 459488,10

2.6 Soil Data Number of soil profiles (= number of CPT's) :

1

2.6.1 Soil Profile S1 Belonging to CPT Surface level in [m. reference level] : Phreatic level in [m. reference level] : Pile tip level in [m. reference level] : Top of positive skin friction zone in [m. reference level] : Bottom of negative skin friction zone in [m. reference level] : OCR-value foundation layer : Expected groundlevel settlement in [m] : Number of layers in profile :

Number layer 1 2 3 4 5 6 7 8

4-3-2024

Top layer [m R.L.] 0,000 -3,600 -6,700 -8,200 -10,700 -11,200 -13,200 -13,800

Gamma

Gamma;sat

[kN/m3] 17,00 18,00 15,00 14,00 12,00 14,00 12,00 18,00

[kN/m3] 19,00 20,00 15,00 14,00 12,00 14,00 12,00 20,00

S1 0,00 -0,87 -19,00 -13,80 -13,80 1,00 0,11 8

Phi [deg] 30,00 32,50 22,50 17,50 15,00 17,50 15,00 32,50

0.00 Rect 290x290

Soil Type Sand Sand Clay Clay Peat Clay Peat Sand

Median (Sand/Gravel) [mm] 0,200 0,200 -----0,200

Page 4

D-Foundations 23.1

2.7 Pile Types

2.7.1 Pile type : Rect 290x290 Pile type :

Prefabricated concrete pile

Materialtype for pile : Concrete Slip layer : None Pile shape : Rectangular pile beta (Shape factor) according to figure 7.i, NEN 9997-1+C2:2017. s (factor for influence of the shape of the crosssection of the pile base) according to NEN 9997-1+C2:2017. Pile dimensions : Smallest side pile tip [m] : Largest side pile tip [m] :

0,290 0,290

2.8 Foundation Plan Number of piles : 1 Number of collaborating piles* : 1 * : 0 = not defined, 1 = non rigid superstructure, >1 = rigid superstructure 2.8.1 View of Foundation Plan

Pile nr/name 1: 1

X-coordinate [m] 119995,00

Y-coorFc;d dinate (EQU/STR/GEO) [m] [kN] 49995,00 675,00

Fc;d (SLS) [kN] 675,00

P0 [kN/m2] 0,00

Pile head level [m R.L.] 0,00

2.9 Excavation Data Excavation level in [m. reference level] : Reduction model : 4-3-2024

0,00 Safe (NEN) 0.00 Rect 290x290

Page 5

D-Foundations 23.1

2.10 Totalized Loads (design values) Total load on all piles For limit state EQU/STR/GEO in [kN] : For Serviceability limit state in [kN] :

675,00 675,00

2.11 Requirements Limit state STR/GEO Maximum allowed settlement in [m] : Maximum allowed (relative) rotation : Serviceability Limit State Maximum allowed settlement in [m] : Maximum allowed (relative) rotation :

0,150 1/0 0,150 1/0

2.12 Overruled Parameters User defined Factor xi3 [-] : User defined Factor xi4 [-] :

1,39 1,39

2.13 Model Options Use pilegroup for negative skin friction (standard) Create intermediate results file Use reduction for continuous flight auger piles (standard) Suppress the influence of excavations.

2.14 Model Options Selected pile types : -Rect 290x290 Selected profiles : -S1

4-3-2024

0.00 Rect 290x290

Page 6

D-Foundations 23.1

3 Bearing Piles (EC7-NL): Results Complete Verification 3.1 Remarks When checking the survey and testing of soil according to NEN 9997-1+C2:2017 art. 3.2.3 section (e), the program uses the provided CPT test level. It does NOT take into account possible different pile tip levels. When different pile tip levels are used in this calculation, the user itself must check for possibly required additional survey and testing of soil. Performing the check on NEN 9997-1+C2:2017 art. 3.2.3, the average distance between the different CPT's used for this check is 25 m. The requirements set by NEN 9997-1+C2:2017 art. A.3.3.3 are met. The variation (0,00%) is ok (<= 12%).

3.2 Calculation Parameters

3.2.1 Pile Factors gamma;b (NEN 9997-1+C2:2017, table A.6 A.7 A.8, Limit State EQU/STR/GEO) : gamma;b (NEN 9997-1+C2:2017, table A.6 A.7 A.8, the Serviceability Limit State) : gamma;s (NEN 9997-1+C2:2017, table A.6 A.7 A.8, Limit State EQU/STR/GEO) : gamma;s (NEN 9997-1+C2:2017, table A.6 A.7 A.8, the Serviceability Limit State) : xi3 (user defined) : xi4 (user defined) : Xi 3 has been used.

1,20 1,00 1,20 1,00 1,39 1,39

Note: The excavation(s) is not taken into account in the calculation!

3.2.2 Pile type : Rect 290x290 Pile type :

Prefabricated concrete pile

Materialtype for pile : Slip layer : Pile shape : beta (Shape factor: figure 7.i, NEN 9997-1+C2:2017 art. 7.6.2.3(g) : Pile tip) : s (NEN 9997-1+C2:2017 art. 7.6.2.3(h) : factor for the influence of the shape of the crosssection of the pile base) :

Concrete None Rectangular pile

Pile dimensions : Smallest side pile tip [m] : Largest side pile tip [m] :

Number/Name CPT 1:S1

Alpha_s Sand/ Gravel 0,0100

1,00 1,00

0,290 0,290

Alpha_s Clay/Loam Peat

Alpha_p

--

0,7000

3.3 Verification of Limit State EQU Required by NEN 9997-1+C2:2017 art. 2.4.8: Ed <= Cd. Non rigid superstructure, verify load per pile with bearing capacity per pile. Fc;d = Rc;d = 4-3-2024

675,000 [kN] 953,426 [kN] 0.00 Rect 290x290

Page 7

D-Foundations 23.1 The requirements of limit state EQU are met, limit state EQU is ok. Note: Negative skin friction plays NO part in Limit State EQU. Its influence is incorporated in the tests for Limit State STR/GEO and the Serviceability limit state. The intermediate results provide a full overview of all values that are calculated for the negative skin friction. Purely indicative, the values for the negative skin friction vary from 249 [kN] to 249 [kN] per pile.

3.4 Verification of Limit State STR/GEO Required by NEN 9997-1+C2:2017 art. 2.4.9: Sd <= Sreq. Sd = Sreq =

0,035 [m] 0,150 [m]

The settlement requirements of limit state STR/GEO are met, this is ok. With only 1 pile, rotation as defined in the NEN is not an issue.

3.5 Verification of Serviceability Limit State Required by NEN 9997-1+C2:2017 art. 2.4.9: Sd <= Sreq. For houses, the requirement is : Sreq = 0.05 m. For other types of superstructures a different (well considered) requirement can be specified. Sd = Sreq =

0,018 [m] 0,150 [m]

The settlement requirements of the Serviceability Limit State are met, this is ok. With only 1 pile, rotation as defined in the NEN is not an issue.

3.6 Additional Information The design values of the maximum shaft tensions (calculated at the transition of positive to negative skin friction) are At Limit state EQU/STR/GEO: sigma = At Serviceability Limit State: sigma =

10,98 [N/mm2] 10,98 [N/mm2]

The maximum settlement was found at: Limit state STR/GEO Number/Name S1 Pile name: 1 Components of the maximum settlement are : sneg = 0,000 [m] sb = 0,026 [m] sel;d = 0,010 [m] s2 = 0,000 [m] Serviceability Limit State Number/Name Pile name:

S1 1

Components of the maximum settlement are : sneg = 0,000 [m] sb = 0,008 [m] sel;d = 0,010 [m] s2 = 0,000 [m] sneg stands for the settlement due to negative skin friction when the expected ground level settlement (egls) is within the next boundaries : 0.02 < egls <= 0.10 meter. For expected ground level settlement beyond the boundaries, sneg = 0.

4-3-2024

0.00 Rect 290x290

Page 8

D-Foundations 23.1 3.6.1 The bearing capacity of shaft and point at Limit state STR/GEO The next table shows the values of the bearing capacities per CPT and these are purely informative. The presented design values are determined using the maximum value of ksi3 and ksi4.

Number/Name CPT 1:S1

Bearing Cap. Shaft [kN] Rs;d 500,601

Bearing Cap. Point [kN] Rb;d 452,825

Bearing Cap. Total [kN] 953,426

3.6.2 The bearing capacity of shaft and point at the Serviceability Limit State The next table shows the values of the bearing capacities per CPT and these are purely informative. The presented design values are determined using the maximum value of ksi3 and ksi4.

Number/Name CPT 1:S1

Bearing Cap. Shaft [kN] Rs;d 600,721

Bearing Cap. Point [kN] Rb;d 543,390

Bearing Cap. Total [kN] 1144,111

End of Report

4-3-2024

0.00 Rect 290x290

Page 9

Bijlage 7

Kostenraming

14-03-2024 Projectnummer: 51020359 Onderwerp: Haalaarheidsonderzoek flexwoningen

Sweco | Flexwoningen Voorschoten Geotechnische haalbaarheidsstudie Projectnummer 51020359 Datum 14-03-2024

Versie D1.0

Documentreferentie NL24-648800269-74607

Project: Zeven locaties flexwoningen Voorschoten 2024 Onderwerp: Voorbelasting op basis van zettingsberekeningen Sweco Datum: 01 maart 2024 versie 1.01 Sweco Nederland B.V. H. (Henk) Veldhuis

gerekend met 1 fasering per locatie Ophoging

Eindzetting

Locatienummer

Locatiebestemming

Oppervlakte terrein in m2

Voorbelasttijd in maanden

(laagdikte in meters)

(laagdikte in meters)

1 2 3 4 5 6 7

IJsbaan Gemeentewerf ZD Gemeentewerf ND Geestwoningpad Koninklijke Marinelaan Oude Stationslaantje Zwembad

6.068,00 4.753,00 2.652,00 2.226,00 784,00 3.640,00 2.106,00

12 6 6 6 6 6 6

1 1 1 1 1 1 1

4,15 0,31 0,31 0,11 0,60 0,18 0,53

Uitgangspunten: Gesloten grondbalans einde werk Kostencomponent per scenario / per fase / per toepassing (= E.O vs V.D. ) helder Fase 1 zo kort mogelijke zettingstijd ( = 4 - 12 maanden) Geen sloopkosten/verwijderingskosten/opruimkosten gerekend Kosten gerekend aankoop zand 14,50,- per losse m3 (verdicht incl. verwerken totaal 22,- per vaste m3) prijspeil 01-01-2024 Kosten alle zand fase 1 = 22,- per vaste m3 Prijzen excl. 20% (uitvoering, AK en W&R) Prijzen prijspeil aannemersprijs 01-01-2024 Voor budgetprijzen 25% opplussen Geen onvoorzien 20% gerekend Geen hergebruik toepassing gerekend vrijkomende materialen Geen bovenwijkse voorzieningen gerekend Geen bouwplaatsvoorzieningen gerekend Geen kosten "voorkomen verstuiving zand" (voorbelasting) gerekend Geen monitoringskosten en zetbakens gerekend Geen watertoepassingen gerekend aangaande zetting/verstuiving/verdichting Geen engineering/begeleiding/directie/toezicht gerekend Geen Aeriusberekening (stikstof) gerekend Genoemde prijzen zijn indicatief (er zijn geen technische tekeningen/dwarsprofielen bekend)

Bruto ophoging

V.D.

(laagdikte in meters)

(h.o.h. in m)

5,15 1,31 1,31 1,11 1,60 1,18 1,53

1 niet niet niet niet niet 1,5

zettingstijd Mobilisatiek (maanden) osten V.D. 12 6 6 6 6 6 6

6000 6000 6000 6000 6000 6000 6000

kosten bruto kosten V.D. kosten totaal (€) (€) fase 1 (€) (zand 22,-) 687.504,40 136.981,46 76.430,64 54.358,92 27.596,80 94.494,40 70.887,96

91.020,00 niet niet niet niet niet 31.590,00

784.524,40 142.981,46 82.430,64 60.358,92 33.596,80 100.494,40 108.477,96

Project: Zeven locaties flexwoningen Voorschoten 2024 Onderwerp: Voorbelasting op basis van zettingsberekeningen Sweco Datum: 01 maart 2024 versie 1.01 Sweco Nederland B.V. H. (Henk) Veldhuis

% aanname

1 2 3 4 5 6 7

Locatienummer

Locatiebestemming

Oppervlakte terrein in m2

1 2 3 4 5 6 7

IJsbaan Gemeentewerf ZD Gemeentewerf ND Geestwoningpad Koninklijke Marinelaan Oude Stationslaantje Zwembad

6.068,00 4.753,00 2.652,00 2.226,00 784,00 3.640,00 2.106,00

Prijs per m2 BRM bruto

Prijs per m2 WRM bruto

Oppervlakte m2 afgerond BRM en WRM 4.248 3.327 1.856 1.558 549 2.548 1.474

73,43 73,43 73,43 73,43 73,43 73,43 73,43

32,69 32,69 32,69 32,69 32,69 32,69 32,69

Oppervlakte Oppervlakte bebouwing in bouwrijp in percentage percentage 70% 30% 1.820,40 4.247,60 1.425,90 3.327,10 795,60 1.856,40 667,80 1.558,20 235,20 548,80 1.092,00 2.548,00 631,80 1.474,20

Totaal bruto 106,12 106,12 106,12 106,12 106,12 106,12 106,12

Oppervlakte woonrijp in percentage 70% 4.247,60 3.327,10 1.856,40 1.558,20 548,80 2.548,00 1.474,20

Totaal Riolering investering hoofdgebouw BRM+WRM in meters 450.755,31 74,00 353.071,85 148,00 197.001,17 25,00 165.356,18 38,00 58.238,66 62,00 270.393,76 144,00 156.442,10 112,00

Totaal

Oppervlakte m2afgerond BRM en WRM

6.068,00 4.753,00 2.652,00 2.226,00 784,00 3.640,00 2.106,00

4.248 3.327 1.856 1.558 549 2.548 1.474

Investering riolering

Totaal investering riool

371,36 371,36 371,36 371,36 371,36 371,36 371,36

35.480,64 rioolaansluiting zuidzijde Anthoni van Leeuwenhoekkade 62.961,28 rioolaansluiting noordzijde Rosenburgherlaan 17.284,00 rioolaansluiting noordzijde Rosenburgherlaan 22.111,68 rioolaansluiting Brunita J. Gemmekelaan zuidzijde 31.024,32 rioolaansluiting Koninklijke Marinelaan oostzijde 61.475,84 rioolaansluiting Burgemeester van Eijklaan 49.592,32 rioolaansluiting Richard Wagnerlaan zuidoostzijde

Locatie flexwoningen Voorschioten vrijdag 01 maart 2024 HV Sweco Nederland B.V.

1. IJsbaan 6068 m2

Alle bedragen zijn in Euro (EUR) RAMINGS POST NUMMER

OMSCHRIJVING

EEN HEID

1 101010

Voorbereidende werkzaamheden fase 1 Klicmelding (verplicht digitaal aanwezig op project door de aannemer) EUR

101030 101040 101050 101060 101070 101080 101090

Toepassen tijdelijke afrastering (bouwhekken) ca. 100 mtr Toepassen bouwbord fase 1 Toepassen rijplaten tijdelijke een werkingang en in terrein Schoonhouden rijplaten gedurende uitvoeringsperiode Bouwplaatsvoorzieningen Verkeersmaatregelen (werkverkeer en verkeersstromen) Voorzieningen tbv VGM en aansluiting openbare ruimte

2 111 111010

HOEVEELHEID RESULTAATS VERPLICHTING

PRIJS PER EENHEID IN EURO

TOTAAL BEDRAG IN EURO

IJsbaan 6068 m2 zetting 12 mnd 150,00 V

1,00

150,00

maand stuk EUR EUR EUR EUR EUR

12,00 V 1,00 V 15.000,00 V 4.000,00 V 5.000,00 V 2.500,00 V 4.000,00 V

800,00 1.500,00 1,00 1,00 1,00 1,00 1,00

9.600,00 1.500,00 15.000,00 4.000,00 5.000,00 2.500,00 4.000,00

Voorbelastingskosten Oppervlakte 6068 m2 Voorbelastingskosten

Eur

784.524,40 V

1,00

784.524,40

12 122010

Bouwrijpmaken terrein Bouwrijpmaken terrein 70%

m2

4.247,60 V

73,43

311.901,27

13 131010

Woonrijpmaken terrein Woonrijpmaken terrein 70%

m2

4.247,60 V

32,69

138.854,04

14 140010 140020

Rioleringen Kosten riolering Aansluiting op bestaand riool

m EUR

74,00 V 1,00 V

371,36 8.000,00

27.480,64 8.000,00

9 91 919990

Overige eenmalige kosten EENMALIGE KOSTEN Revisietekeningen

EUR

1.500,00 N

1,00

1.500,00

Subtotaal

929990 939990 949990 959990

Uitvoeringskosten Algemene kosten Winst en risico Eenmalige kosten

Totaalbedrag excl. btw Sweco Nederland B.V. De 1e maart 2024

€

6% 6% 6% 2%

78.840,62 N 78.840,62 N 78.840,62 N 26.280,21 N

1,00 1,00 1,00 1,00

1.314.010,35

78.840,62 78.840,62 78.840,62 26.280,21

€

1.576.812,42

Locatie flexwoningen Voorschioten vrijdag 01 maart 2024 HV Sweco Nederland B.V.

2. Gemeentewerf ND 4753 m2

Alle bedragen zijn in Euro (EUR) RAMINGS POST NUMMER

OMSCHRIJVING

EEN HEID

1 101010

Voorbereidende werkzaamheden fase 1 Klicmelding (verplicht digitaal aanwezig op project door de aannemer) EUR

101030 101040 101050 101060 101070 101080 101090

Toepassen tijdelijke afrastering (bouwhekken) ca. 100 mtr Toepassen bouwbord fase 1 Toepassen rijplaten tijdelijke een werkingang en in terrein Schoonhouden rijplaten gedurende uitvoeringsperiode Bouwplaatsvoorzieningen Verkeersmaatregelen (werkverkeer en verkeersstromen) Voorzieningen tbv VGM en aansluiting openbare ruimte

2 111 111010

HOEVEELHEID RESULTAATS VERPLICHTING

PRIJS PER EENHEID IN EURO

TOTAAL BEDRAG IN EURO

1. Gemeentewerf ND 4753 m2 150,00 V

1,00

150,00

maand stuk EUR EUR EUR EUR EUR

12,00 V 1,00 V 15.000,00 V 4.000,00 V 5.000,00 V 2.500,00 V 4.000,00 V

800,00 1.500,00 1,00 1,00 1,00 1,00 1,00

9.600,00 1.500,00 15.000,00 4.000,00 5.000,00 2.500,00 4.000,00

Voorbelastingskosten Oppervlakte 4753 m2 Voorbelastingskosten

Eur

142.981,46 V

1,00

142.981,46

12 122010

Bouwrijpmaken terrein Bouwrijpmaken terrein 70%

m2

3.327,10 V

73,43

244.308,95

13 131010

Woonrijpmaken terrein Woonrijpmaken terrein 70%

m2

3.327,10 V

32,69

108.762,90

14 140010 140020

Rioleringen Kosten riolering Aansluiting op bestaand riool

m EUR

148,00 V 1,00 V

371,36 8.000,00

54.961,28 8.000,00

9 91 919990

Overige eenmalige kosten EENMALIGE KOSTEN Revisietekeningen

EUR

1.500,00 N

1,00

1.500,00

Subtotaal

929990 939990 949990 959990

Uitvoeringskosten Algemene kosten Winst en risico Eenmalige kosten

Totaalbedrag excl. btw Sweco Nederland B.V. De 1e maart 2024

€

6% 6% 6% 2%

36.135,88 N 36.135,88 N 36.135,88 N 12.045,29 N

1,00 1,00 1,00 1,00

602.264,59

36.135,88 36.135,88 36.135,88 12.045,29

€

722.717,51

Locatie flexwoningen Voorschioten vrijdag 01 maart 2024 HV Sweco Nederland B.V.

3. Gemeentewerf ZD 2652 m2

Alle bedragen zijn in Euro (EUR) RAMINGS POST NUMMER

OMSCHRIJVING

EEN HEID

1 101010

Voorbereidende werkzaamheden fase 1 Klicmelding (verplicht digitaal aanwezig op project door de aannemer) EUR

101030 101040 101050 101060 101070 101080 101090

Toepassen tijdelijke afrastering (bouwhekken) ca. 100 mtr Toepassen bouwbord fase 1 Toepassen rijplaten tijdelijke een werkingang en in terrein Schoonhouden rijplaten gedurende uitvoeringsperiode Bouwplaatsvoorzieningen Verkeersmaatregelen (werkverkeer en verkeersstromen) Voorzieningen tbv VGM en aansluiting openbare ruimte

2 111 111010

HOEVEELHEID RESULTAATS VERPLICHTING

PRIJS PER EENHEID IN EURO

TOTAAL BEDRAG IN EURO

3. Gemeentewerf ZD 2652 m2 150,00 V

1,00

150,00

maand stuk EUR EUR EUR EUR EUR

12,00 V 1,00 V 15.000,00 V 4.000,00 V 5.000,00 V 2.500,00 V 4.000,00 V

800,00 1.500,00 1,00 1,00 1,00 1,00 1,00

9.600,00 1.500,00 15.000,00 4.000,00 5.000,00 2.500,00 4.000,00

Voorbelastingskosten Oppervlakte 2652 m2 Voorbelastingskosten

Eur

82.430,64 V

1,00

82.430,64

12 122010

Bouwrijpmaken terrein Bouwrijpmaken terrein 70%

m2

1.856,40 V

73,43

136.315,45

13 131010

Woonrijpmaken terrein Woonrijpmaken terrein 70%

m2

1.856,40 V

32,69

60.685,72

14 140010 140020

Rioleringen Kosten riolering Aansluiting op bestaand riool

m EUR

25,00 V 1,00 V

371,36 8.000,00

9.284,00 8.000,00

9 91 919990

Overige eenmalige kosten EENMALIGE KOSTEN Revisietekeningen

EUR

1.500,00 N

1,00

1.500,00

Subtotaal

929990 939990 949990 959990

Uitvoeringskosten Algemene kosten Winst en risico Eenmalige kosten

Totaalbedrag excl. btw Sweco Nederland B.V. De 1e maart 2024

€

6% 6% 6% 2%

20.397,95 N 20.397,95 N 20.397,95 N 6.799,32 N

1,00 1,00 1,00 1,00

339.965,81

20.397,95 20.397,95 20.397,95 6.799,32

€

407.958,97

Locatie flexwoningen Voorschioten vrijdag 01 maart 2024 HV Sweco Nederland B.V.

4. Geestwoningpad 2226 m2

Alle bedragen zijn in Euro (EUR) RAMINGS POST NUMMER

OMSCHRIJVING

EEN HEID

1 101010

Voorbereidende werkzaamheden fase 1 Klicmelding (verplicht digitaal aanwezig op project door de aannemer) EUR

101030 101040 101050 101060 101070 101080 101090

Toepassen tijdelijke afrastering (bouwhekken) ca. 100 mtr Toepassen bouwbord fase 1 Toepassen rijplaten tijdelijke een werkingang en in terrein Schoonhouden rijplaten gedurende uitvoeringsperiode Bouwplaatsvoorzieningen Verkeersmaatregelen (werkverkeer en verkeersstromen) Voorzieningen tbv VGM en aansluiting openbare ruimte

2 111 111010

HOEVEELHEID RESULTAATS VERPLICHTING

PRIJS PER EENHEID IN EURO

TOTAAL BEDRAG IN EURO

4. Geestwoningpad 2226 m2 150,00 V

1,00

150,00

maand stuk EUR EUR EUR EUR EUR

12,00 V 1,00 V 15.000,00 V 4.000,00 V 5.000,00 V 2.500,00 V 4.000,00 V

800,00 1.500,00 1,00 1,00 1,00 1,00 1,00

9.600,00 1.500,00 15.000,00 4.000,00 5.000,00 2.500,00 4.000,00

Voorbelastingskosten Oppervlakte 2226 m2 Voorbelastingskosten

Eur

60.358,92 V

1,00

60.358,92

12 122010

Bouwrijpmaken terrein Bouwrijpmaken terrein 70%

m2

1.558,20 V

73,43

114.418,63

13 131010

Woonrijpmaken terrein Woonrijpmaken terrein 70%

m2

1.558,20 V

32,69

50.937,56

14 140010 140020

Rioleringen Kosten riolering Aansluiting op bestaand riool

m EUR

38,00 V 1,00 V

371,36 8.000,00

14.111,68 8.000,00

9 91 919990

Overige eenmalige kosten EENMALIGE KOSTEN Revisietekeningen

EUR

1.500,00 N

1,00

1.500,00

Subtotaal

929990 939990 949990 959990

Uitvoeringskosten Algemene kosten Winst en risico Eenmalige kosten

Totaalbedrag excl. btw Sweco Nederland B.V. De 1e maart 2024

€

6% 6% 6% 2%

17.464,61 N 17.464,61 N 17.464,61 N 5.821,54 N

1,00 1,00 1,00 1,00

291.076,78

17.464,61 17.464,61 17.464,61 5.821,54

€

349.292,14

Locatie flexwoningen Voorschioten vrijdag 01 maart 2024 HV Sweco Nederland B.V.

5. Koninklijke Marinelaan 784 m2

Alle bedragen zijn in Euro (EUR) RAMINGS POST NUMMER

OMSCHRIJVING

EEN HEID

1 101010

Voorbereidende werkzaamheden fase 1 Klicmelding (verplicht digitaal aanwezig op project door de aannemer) EUR

101030 101040 101050 101060 101070 101080 101090

Toepassen tijdelijke afrastering (bouwhekken) ca. 100 mtr Toepassen bouwbord fase 1 Toepassen rijplaten tijdelijke een werkingang en in terrein Schoonhouden rijplaten gedurende uitvoeringsperiode Bouwplaatsvoorzieningen Verkeersmaatregelen (werkverkeer en verkeersstromen) Voorzieningen tbv VGM en aansluiting openbare ruimte

2 111 111010

HOEVEELHEID RESULTAATS VERPLICHTING

PRIJS PER EENHEID IN EURO

TOTAAL BEDRAG IN EURO

5. Koninklijke Marinelaan 784 m2 150,00 V

1,00

150,00

maand stuk EUR EUR EUR EUR EUR

12,00 V 1,00 V 15.000,00 V 4.000,00 V 5.000,00 V 2.500,00 V 4.000,00 V

800,00 1.500,00 1,00 1,00 1,00 1,00 1,00

9.600,00 1.500,00 15.000,00 4.000,00 5.000,00 2.500,00 4.000,00

Voorbelastingskosten Oppervlakte 784 m2 Voorbelastingskosten

Eur

33.596,80 V

1,00

33.596,80

12 122010

Bouwrijpmaken terrein Bouwrijpmaken terrein 70%

m2

548,80 V

73,43

40.298,38

13 131010

Woonrijpmaken terrein Woonrijpmaken terrein 70%

m2

548,80 V

32,69

17.940,27

14 140010 140020

Rioleringen Kosten riolering Aansluiting op bestaand riool

m EUR

62,00 V 1,00 V

371,36 8.000,00

23.024,32 8.000,00

9 91 919990

Overige eenmalige kosten EENMALIGE KOSTEN Revisietekeningen

EUR

1.500,00 N

1,00

1.500,00

Subtotaal

929990 939990 949990 959990

Uitvoeringskosten Algemene kosten Winst en risico Eenmalige kosten

Totaalbedrag excl. btw Sweco Nederland B.V. De 1e maart 2024

€

6% 6% 6% 2%

9.966,59 N 9.966,59 N 9.966,59 N 3.322,20 N

1,00 1,00 1,00 1,00

166.109,78

9.966,59 9.966,59 9.966,59 3.322,20

€

199.331,73

Locatie flexwoningen Voorschioten vrijdag 01 maart 2024 HV Sweco Nederland B.V.

6. Oude Stationslaantje 3640 m2

Alle bedragen zijn in Euro (EUR) RAMINGS POST NUMMER

OMSCHRIJVING

EEN HEID

1 101010

Voorbereidende werkzaamheden fase 1 Klicmelding (verplicht digitaal aanwezig op project door de aannemer) EUR

101030 101040 101050 101060 101070 101080 101090

Toepassen tijdelijke afrastering (bouwhekken) ca. 100 mtr Toepassen bouwbord fase 1 Toepassen rijplaten tijdelijke een werkingang en in terrein Schoonhouden rijplaten gedurende uitvoeringsperiode Bouwplaatsvoorzieningen Verkeersmaatregelen (werkverkeer en verkeersstromen) Voorzieningen tbv VGM en aansluiting openbare ruimte

2 111 111010

HOEVEELHEID RESULTAATS VERPLICHTING

PRIJS PER EENHEID IN EURO

TOTAAL BEDRAG IN EURO

6. Oude Stationslaantje 3640 m2 150,00 V

1,00

150,00

maand stuk EUR EUR EUR EUR EUR

12,00 V 1,00 V 15.000,00 V 4.000,00 V 5.000,00 V 2.500,00 V 4.000,00 V

800,00 1.500,00 1,00 1,00 1,00 1,00 1,00

9.600,00 1.500,00 15.000,00 4.000,00 5.000,00 2.500,00 4.000,00

Voorbelastingskosten Oppervlakte 3640 m2 Voorbelastingskosten

Eur

100.494,40 V

1,00

100.494,40

12 122010

Bouwrijpmaken terrein Bouwrijpmaken terrein 70%

m2

2.548,00 V

73,43

187.099,64

13 131010

Woonrijpmaken terrein Woonrijpmaken terrein 70%

m2

2.548,00 V

32,69

83.294,12

14 140010 140020

Rioleringen Kosten riolering Aansluiting op bestaand riool

m EUR

144,00 V 1,00 V

371,36 8.000,00

53.475,84 8.000,00

9 91 919990

Overige eenmalige kosten EENMALIGE KOSTEN Revisietekeningen

EUR

1.500,00 N

1,00

1.500,00

Subtotaal

929990 939990 949990 959990

Uitvoeringskosten Algemene kosten Winst en risico Eenmalige kosten

Totaalbedrag excl. btw Sweco Nederland B.V. De 1e maart 2024

€

6% 6% 6% 2%

28.536,84 N 28.536,84 N 28.536,84 N 9.512,28 N

1,00 1,00 1,00 1,00

475.614,00

28.536,84 28.536,84 28.536,84 9.512,28

€

570.736,80