BEGROTING
NAAM :R.C.The Big Stones WERK :uitbreiding balkon Stone Home WERK NR. :25 -2000 tek.-----
MATERIALEN TOTAAL MATERIAAL UREN PRODUCTIE TOTAAL UREN POST POST UITZETTEN POST FUNDERING POST BETONVLOER BG POST HOUTEN PAAL CONSTRUCTIE POST BEVESTEGING MAT. POST STAALCONSTRUCTIE VOOR HOUTEN PALEN POST BALKLAAG POST VLOERPLATEN POST DAKBEDEKKING POST BOEIRANDEN POST KOZIJNEN POST AFWERKING VERD.VLOER POST VERLICHTING POST SCHILDERWERK POST HANG EN SLUITWERK POST LEGES POST AVFAL TOTAAL POSTEN TOTAAL MAT. UREN /SPUITWERK EN POSTEN EXCL.21% BTW 0% OVER MATERIAAL TOTAAL ALLES EXCL 21 % B.T.W.
EENHEID
BR. x L.
TOTAAL M2
PRIJS
EENHEIDS
PER M2
PRIJS
AANTAL
TOTAAL
* .
€ € € € € € € € € € € € € € € € € € € € € €
500,00 4.500,00 7.880,00 3.250,00 850,00 6.900,00 6.540,00 4.600,00 6.650,00 4.550,00 3.120,00 7.220,00 3.450,00 1.850,00 1.180,00 5.485,00 990,00 69.515,00
. .
€ €
99.515,00 -
. € , TOTAAL MAT INCL 21 % EN UREN 21 % BTW
99.515,00
60,00
. 500 . * * * * * * * * * * * * * * * *
30.000,00 30.000,00
120.413,15