CConstaterende datWeesp
Koppel je AI →
Document · PDF

1b. tunnel

Commissie SOB 7 april 2021, gemeente WeespBij agendapunt: Kredietbesluit veiligheidsmaatregelen Meester Bouhuijstunnel e.o.831 woorden

Open het PDF bij iBabs ↗Naar de vergadering →

Tekst van het document

Uit het bestand gehaald, zonder opmaak, tabellen en afbeeldingen

43

P

A

P

P

15

P

P

P

P

6

P

P

P

P

P

P

P

P

52

P

63

18

43 16

P

P

4

P

A

39

P

A

P

5

P P

P

P

P

P

P

P

P

39

17

P

P

P

3

P

P

P

P

P

P

I A P

P

P

A

P

P

39

P

P

16

P

1

P

P

P

P

10

2

49

P

P

A A

P

P

P

P P

P

1a

P

P

P

P

P

P P

P

P

P

A P

I P

P

P

P

P

P

P

P

P

P

P

0.90

P

1.80

A

P

P

I P

47

P

91

P

P

A

P

P

P

P

P

nnel Meester Bouhuijstu

P

P

1.80

P

P

P

P P

P

P

P

P

P

P

P

P

P

P P

P

2.70

P P

Stationsweg

P P

P

I

P

B

54

11 P

P

P

P

P P

P

P

I P

12

10

P

P

P

P

P

I

P

P

P

P

P

14

21

P

18

P

P

14 16

P

P

P

P

19

I

I 13

I I 14

17

I

15

I

65

I I

63 I 61 13

I

59

3

57

11

55

I

I I

9

21-3 7

2

53

I I

1

8

5

19

51

7

I

A

I

17

I I

6

3

49

I

I

15

I

7

4

1

47

I

11

5

2

13

I

45

I I

14a

-t

43

9

3

I

41

I I 7

1

39

I I

15

14

I 5

13

13

11 16 3

10 17 9

I 19

A 1-1a

8

I

A

I

I

I

19

I

I

7

4-54

I

6

I

12

5

I I I

I

4

I I I

I

I

61

63

2

23

59

2

I 57

I

21

I

55

1

I

I

2

24

19

I 53

I I

51

22

Lee uw

49

20

17

I

15

18

26

3 1

I

14

45

32

12

43

34

I 36

41

10

33

I

35

8

A

37

I

A 6

I

39

I

4

I

I

I

I

I

A I I

0

I

-7

38

I I

I

I I I

72 90-1

74

22 86 88

84

76

78

82

80

I

eg

I

I

A

I

R=2.00

I

30

1-25

eld sew

I

I 13

I I

2

2 I

16

I

I

env

I

28

47

I I

I

3.00

0 R=3.0

34 -6

2

I

3.00

I

I I

I

I I I I

8124

I

I

I

2.50

I

2.85 2-2a I

8a

2.70 I

8

I I

3

I 1-3

6

1-5

4

h

sp

at ion

21 13

11

I 7

16

9

3

14

27

12

1

1.80

0

1.8

45

8

0

0.9

47

10

1a

49

77

-14

St

A

79

a

at

9

18 5

A

2-2

ion

32

2

-14

15

I

51

69

I 17

I

I

53

71

19

I

I

I

67

23

I

55

57

59

61

63

I

25

ABRI

vri

65

I

sw

h

I

I

2b

h

30 I

vri

144

ABRI

ABRI

I

I

142

lei

I

eg

28

A I

en sin ge l

I

I

I

A

A

St

He r

n

12132

I

6

I

43

2

4

I 41

I 28

I

39 I

2.70 1

3537

A A 3133

2

15

26

16

2-1

24

12

27-

3

29

14

I 23-

17

25

22

4

20

21

19-

18

13

I

18 5

15-

19

17

12

11 20

16

6

13

10

I 22

21

14 9

I

7

11

23

8

3.25

12

24

I 10

8

9a

2

I

2.50

4

6

6

4.53

4

19

I

1-4 3

I

n de re rb ve d pa m et 80 vo l 1, nd aa aa inim st m Be ar na

17

17a

I

11f

I

11e

I

15

11

11a

11b

11c

11d

12

7a

9

9a

9b

13

9c

9d

22

7

I

I

5

I

11

4

3-9

3

Infrastr. verkeersveiligheidsmaatregel Product

Schetsontwerp

Status Variant Opdracht Ontwerp Getekend Projectnr.

Concept Verkeersmaatregelen Stationsweg / Herensingel te Weesp Weesp Datum NS-002 17-02-2021 Revisie Maud Bouwens C0 Schaal . 1:200 (A1)

Bestand

20.003-PR-004a variant.dwg

1a

1

I

1-2 1-1a 3

5

I 7

I 8 9

I

10

11

I

12 13

2

I

Sluisbrug

1

I

2-2b 2

4-8

I

I

1 1d I

3-3d 5

IPS bestand

De tekst is automatisch uit het bestand gehaald en kan afwijken van het origineel (kolommen, tabellen en koppen lopen door elkaar). Het officiële stuk bij iBabs is leidend. Bron: https://api.notubiz.nl/document/9979571/1