OMG.Constructie bovenaanzicht glijbaan, Project Alt1_Column Application Plan.mail.pdf (Geanonimiseerd)
Tekst van het document
je) ne } ee) == | onl PT_\ EI 42 GD FIRST STEP (geanonimiseerd) My | SU | 06 | OBO | MOW 300 Capsule 7 cou mncharsarr measure wu sesoenre pertoonss B B | 52 | 0% | ocz | dn ED Caps n ef events No | Design Revision Date HE | 1 | 52 | 0% | m3 | BU 300 Gapsde 7 AA m | 0 | SA | 0% | BIO | B EL) Gapsde û kes MM | 4 | 0% | vO | dand 8020 Gapsde ü B | 80 | 40 | 0% | ogaso | dod 8MD Gapsde ü M | 6 | 40 | 0% | 080 | MOW 8D Gpsde U (Q) PolinWaterparks M | 0 | 46 | 0% | 350 | da 800 Gapsde 1 Graat Tue EXPERIENGE BA) | A | 06 | 08 daor MO Capsule Lu ‚ ° oo Gebkim Organize Sanayi Bolgesi Tel: +90 262 656 64 67 (pbx) mjs a | a oem d |t | en en HI A | 0% | vm EKD WW | PO | OD | gk OM N Project Number CAD File Name Date M | 0 | 6 | 0% | om | MOW ED] Gpsile u S) 6% [ ij PLAN i MO 9 | 0B | 0% | OIO | MOW EI) Gapsde 7 N / nn TB 1301 03 046 0168350 door 8M20 Gpse 70 N # CAPFUN EIKENHOF CAMPSITE PROJECT TC 1681 03 046 01685, daooxd 8M20 Gpstle Ki WATER SLIDES PROJECT TW 03 04 046 01685 door 8M20 Capsule 70 AN Pd FRANCE 5 | 65 | 10 OQ | ans OOMS 3MI6 Gapsde 2 60 4% 26117 Drawing Tie: Aj 2 | 45 0 | os | MW |M Gpse 2 C N ag ag N brama No n 5 | 2% 0 | nas | HOW ED Gapsde 20 Pate adreatedopere % 05 | 2% 0 | ends | BOW SMD Gapsde 210 _ NTS lassification : 'aper Size 24 5 | 0u 0 | nis | BSN ED Gpsile 210