PROGRAMMA Nog te realiseren m/two.oldstyle/percent.oldstyle Bedrijfskavels /one.oldstyle/six.oldstyle./two.oldstyle/one.oldstyle/six.oldstyle/one.oldstyle/zero.oldstyle/zero.oldstyle/percent.oldstyle Woon-werk kavels - /zero.oldstyle/percent.oldstyle Totaal /one.oldstyle/six.oldstyle./two.oldstyle/one.oldstyle/six.oldstyle/one.oldstyle/zero.oldstyle/zero.oldstyle/percent.oldstyle RUIMTEGEBRUIK Omschrijving Aantal (m/two.oldstyle) /percent.oldstyle Uitgeefbaar /four.oldstyle/one.oldstyle./two.oldstyle/nine.oldstyle/zero.oldstyle/eight.oldstyle/zero.oldstyle/percent.oldstyle Verharding /three.oldstyle./four.oldstyle/one.oldstyle/five.oldstyle/seven.oldstyle/percent.oldstyle Groen /six.oldstyle./nine.oldstyle/one.oldstyle/five.oldstyle/one.oldstyle/three.oldstyle/percent.oldstyle Water - /zero.oldstyle/percent.oldstyle Totaal /five.oldstyle/one.oldstyle./six.oldstyle/two.oldstyle/zero.oldstyle/one.oldstyle/zero.oldstyle/zero.oldstyle/percent.oldstyle PROJECTGEGEVENS Omschrijving Kern Blokzijl Project Bedrijventerrein Scheepsdiep Programma Mijn STWL Portefeuillehouder Marcel Scheringa Verwacht eindjaar /two.oldstyle/zero.oldstyle/two.oldstyle/eight.oldstyle Restant looptijd /one.oldstyle/zero.oldstyle jaar Plangebied /five.oldstyle,/two.oldstyle ha Financieel Omschrijving Bedrag (/Euro.taboldstyle)* Boekwaarde per
/one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle/two.oldstyle/two.oldstyle/seven.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Nog te realiseren kosten /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v./three.oldstyle/nine.oldstyle/eight.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Nog te realiseren opbrengsten /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v.-/eight.oldstyle/one.oldstyle/one.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Rentetoerekening /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v. (rekenrente /one.oldstyle,/zero.oldstyle/percent.oldstyle)/three.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Resultaat EW per /three.oldstyle/one.oldstyle-/one.oldstyle/two.oldstyle-/two.oldstyle/zero.oldstyle/two.oldstyle/eight.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstylevoordelig Winstneming / verliesneming -/one.oldstyle/four.oldstyle/four.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstylewinst Resultaat EW per /three.oldstyle/one.oldstyle-/one.oldstyle/two.oldstyle-/two.oldstyle/zero.oldstyle/two.oldstyle/eight.oldstyle (correctie winst/verlies)-/three.oldstyle/four.oldstyle/five.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstylevoordelig Resultaat NCW per
/one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle (discontovoet /two.oldstyle/percent.oldstyle)-/one.oldstyle/six.oldstyle/eight.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstylevoordelig */Euro.taboldstyle afgerond, duizendtallen; + is nadelig – is voordelig De boekwaarde per /one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle bedraagt circa /Euro.taboldstyle /two.oldstyle/two.oldstyle/seven.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle negatief. Het betreft het saldo van de gerealiseerde kosten en opbrengsten tot en met /two.oldstyle/zero.oldstyle/one.oldstyle/eight.oldstyle. De nog te realiseren kosten bedragen circa /Euro.taboldstyle /three.oldstyle/nine.oldstyle/eight.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,=. Het gaat hoofdzakelijk om kosten in het kader van het woonrijpmaken. De nog te realiseren opbrengsten bedragen circa /Euro.taboldstyle /eight.oldstyle/one.oldstyle/one.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,=. Het betreft de grondopbrengst uit verkoop van de resterende kavels. De rentetoerekening bedraagt circa /Euro.taboldstyle /three.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,= op basis van een rekenrente van /one.oldstyle,/zero.oldstyle/percent.oldstyle.
Het resultaat op eindwaarde per /three.oldstyle/one.oldstyle-/one.oldstyle/two.oldstyle-/two.oldstyle/zero.oldstyle/two.oldstyle/eight.oldstyle bedraagt circa /Euro.taboldstyle /two.oldstyle/zero.oldstyle/one.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,= voordelig. Dat is inclusief de reeds genomen winst van circa /Euro.taboldstyle /one.oldstyle/four.oldstyle/four.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,=. Hiervoor gecorrigeerd bedraagt het werkelijke projectresultaat op eindwaarde per /three.oldstyle/one.oldstyle-/one.oldstyle/two.oldstyle-/two.oldstyle/zero.oldstyle/two.oldstyle/eight.oldstyle circa /Euro.taboldstyle /three.oldstyle/four.oldstyle/five.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,= voordelig. Het resultaat op netto contante waarde per /one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle bedraagt circa /Euro.taboldstyle /one.oldstyle/six.oldstyle/eight.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,= voordelig. Risico’s In het onderstaande overzicht staan de risico’s van het project weergegeven.
Projectrisico’s Kans Gevolg Risico Kaveluitgifte: /five.oldstyle jaar vertraging /five.oldstyle/percent.oldstyle/Euro.taboldstyle /five.oldstyle/three.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle/Euro.taboldstyle /two.oldstyle./six.oldstyle/five.oldstyle/zero.oldstyle In het project Scheepsdiep/Kanaalweg vormt met name vertraging door de afzet een risico, de kans hierop wordt echter klein ingeschat. Het totale risicobedrag is gekwanti/f_i ceerd op /Euro.taboldstyle /two.oldstyle./six.oldstyle/five.oldstyle/zero.oldstyle,=.
/six.oldstyle/eight.oldstyle /six.oldstyle/nine.oldstyle Meerjaren Begroting Grondexploitaties /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v. Gemeente Steenwijkerland /three.oldstyle./two.oldstyle./six.oldstyle | Locatie Concrelit Beschrijving De Concrelit-locatie ligt nabij de binnenstad van Steenwijk, tussen de mr. Z. ter Steghestraat en het dolderkanaal. De locatie is vernoemd naar de oude locatie van betonfabriek Concre- lit en is via de A/three.oldstyle/two.oldstyle en met het openbaar veroer goed bereikbaar. Van het terrein was /five.oldstyle./two.oldstyle/four.oldstyle/zero.oldstyle m/two.oldstyle bestemd voor een basisschool genaamd school B, dit was onderdeel van een gunstige grondruil met de oude locatie van deze school. Het overig uitgeefbaar gebied, circa /five.oldstyle./five.oldstyle/zero.oldstyle/zero.oldstyle m/two.oldstyle, is bestemd voor bedrijven. Voortgang Per /one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle moet nog /four.oldstyle./five.oldstyle/three.oldstyle/zero.oldstyle m/two.oldstyle aan bedrijfskavels verkocht worden, dit staat evenredig gefaseerd over de looptijd. Verder staat de verkoop van een waterschapsgebouw inclusief bijhorende grond gepland voor verkoop in /two.oldstyle/zero.oldstyle/two.oldstyle/one.oldstyle. Het plangebied is bouwrijp gereed.
PROGRAMMA Nog te realiseren m/two.oldstyle/percent.oldstyle Bedrijfskavels /four.oldstyle./five.oldstyle/three.oldstyle/zero.oldstyle/one.oldstyle/zero.oldstyle/zero.oldstyle/percent.oldstyle Woon-werk kavels - /zero.oldstyle/percent.oldstyle Totaal /four.oldstyle./five.oldstyle/three.oldstyle/zero.oldstyle/one.oldstyle/zero.oldstyle/zero.oldstyle/percent.oldstyle RUIMTEGEBRUIK Omschrijving Aantal (m/two.oldstyle) /percent.oldstyle Uitgeefbaar /one.oldstyle/zero.oldstyle./seven.oldstyle/six.oldstyle/eight.oldstyle/five.oldstyle/eight.oldstyle/percent.oldstyle Verharding /six.oldstyle/two.oldstyle/seven.oldstyle/three.oldstyle/percent.oldstyle Groen /seven.oldstyle./zero.oldstyle/four.oldstyle/two.oldstyle/three.oldstyle/eight.oldstyle/percent.oldstyle Water - /zero.oldstyle/percent.oldstyle Totaal /one.oldstyle/eight.oldstyle./four.oldstyle/three.oldstyle/seven.oldstyle/one.oldstyle/zero.oldstyle/zero.oldstyle/percent.oldstyle PROJECTGEGEVENS Omschrijving Kern Steenwijk Project Locatie concrelit Programma Mijn STWL Portefeuillehouder Marcel Scheringa Verwacht eindjaar /two.oldstyle/zero.oldstyle/two.oldstyle/three.oldstyle Restant looptijd /five.oldstyle jaar Plangebied /one.oldstyle,/eight.oldstyle ha Financieel Omschrijving Bedrag (/Euro.taboldstyle)* Boekwaarde per
/one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle/two.oldstyle/seven.oldstyle/zero.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Nog te realiseren kosten /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v./three.oldstyle/zero.oldstyle/nine.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Nog te realiseren opbrengsten /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v.-/five.oldstyle/eight.oldstyle/six.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Rentetoerekening /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v. (rekenrente /one.oldstyle,/zero.oldstyle/percent.oldstyle)/nine.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Resultaat EW per /three.oldstyle/one.oldstyle-/one.oldstyle/two.oldstyle-/two.oldstyle/zero.oldstyle/two.oldstyle/three.oldstyle-/five.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstylevoordelig Winstneming / verliesneming /five.oldstyle/seven.oldstyle/six.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyleverlies Resultaat EW per /three.oldstyle/one.oldstyle-/one.oldstyle/two.oldstyle-/two.oldstyle/zero.oldstyle/two.oldstyle/three.oldstyle (correctie winst/verlies)/five.oldstyle/seven.oldstyle/one.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstylenadelig Resultaat NCW per /one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle (discontovoet
/two.oldstyle/percent.oldstyle)-/five.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstylevoordelig */Euro.taboldstyle afgerond, duizendtallen; + is nadelig – is voordelig De boekwaarde per /one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle bedraagt circa /Euro.taboldstyle /two.oldstyle/seven.oldstyle/zero.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle negatief. Het betreft het saldo van de gerealiseerde kosten en opbrengsten tot en met /two.oldstyle/zero.oldstyle/one.oldstyle/eight.oldstyle. De nog te realiseren kosten bedragen circa /Euro.taboldstyle /three.oldstyle/zero.oldstyle/nine.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,=. Het gaat hoofdzakelijk om kosten in het kader van het bouwrijpmaken. De nog te realiseren opbrengsten bedragen circa /Euro.taboldstyle /five.oldstyle/eight.oldstyle/six.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,=. Het betreft de grondopbrengst uit verkoop van de resterende kavels. De rentetoerekening bedraagt circa /Euro.taboldstyle /nine.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,= op basis van een rekenrente van /one.oldstyle,/zero.oldstyle/percent.oldstyle.
Het resultaat op eindwaarde per /three.oldstyle/one.oldstyle-/one.oldstyle/two.oldstyle-/two.oldstyle/zero.oldstyle/two.oldstyle/three.oldstyle bedraagt circa /Euro.taboldstyle /five.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,= voordelig. Dat is inclusief de reeds getroff en verliesneming van circa /Euro.taboldstyle /five.oldstyle/seven.oldstyle/six.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,=. Hiervoor gecorrigeerd bedraagt het werkelijke projectresultaat op eindwaarde per /three.oldstyle/one.oldstyle-/one.oldstyle/two.oldstyle-/two.oldstyle/zero.oldstyle/two.oldstyle/three.oldstyle circa /Euro.taboldstyle /five.oldstyle/seven.oldstyle/one.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,= nadelig. Het resultaat op netto contante waarde per /one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle bedraagt circa /Euro.taboldstyle /five.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,= voordelig. Risico’s In het onderstaande overzicht staan de risico’s van het project weergegeven.
Projectrisico’s Kans Gevolg Risico Afzetrisico met huidige functies: BP-wijziging /seven.oldstyle/five.oldstyle/percent.oldstyle/Euro.taboldstyle /one.oldstyle/zero.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle/Euro.taboldstyle /one.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Afzet vastgoed: lagere opbrengst /seven.oldstyle/five.oldstyle/percent.oldstyle/Euro.taboldstyle /one.oldstyle/four.oldstyle/zero.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle/Euro.taboldstyle /two.oldstyle/nine.oldstyle./two.oldstyle/five.oldstyle/zero.oldstyle Vervangend groen voor wijktuin /five.oldstyle/percent.oldstyle/Euro.taboldstyle /two.oldstyle/five.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle/Euro.taboldstyle /one.oldstyle/two.oldstyle./five.oldstyle/zero.oldstyle In het project Locatie Concrelit vormt met name de afzet een risico. Het totale risicobedrag is gekwanti/f_i ceerd op /Euro.taboldstyle /three.oldstyle/three.oldstyle/one.oldstyle./two.oldstyle/five.oldstyle/zero.oldstyle,=.
/seven.oldstyle/zero.oldstyle /seven.oldstyle/one.oldstyle Meerjaren Begroting Grondexploitaties /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v. Gemeente Steenwijkerland /three.oldstyle./two.oldstyle./seven.oldstyle | Novacterrein Beschrijving Het NOVAC-terrein is vernoemd naar de voormalige Melkfabriek. Het gebied is ontwikkeld als locatie voor volumineuze detailhandel en lichte bedrijvigheid. Initieel was circa /one.oldstyle,/two.oldstyle ha bestemd voor deatilhandel en circa /one.oldstyle,/six.oldstyle a voor bedrijven in de categorie /one.oldstyle (A) tot /three.oldstyle (C). Indien de belangstelling vanuit de grootschalige detailhandel de /one.oldstyle,/two.oldstyle ha oversteeg kon de locatie van de overige bedrijven (deels) worden gewijzigd. Verder was er circa /seven.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle m/two.oldstyle uitgeef- baar oppervlak aan te handhaven kantoren van de oude melkfabriek. Het terrein ligt in de overgangszone tussen de kernen Steenwijk en Tuk. Het gebied is goed bereikbaar en ligt op /five.oldstyle minuten rijden van de afslag Steenwijk Noord en is uitstekend zichtbaar vanaf de Hooidijk, dit is de westelijke entreeweg naar het centrum van Steenwijk.
Voortgang Per /one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle moet nog /three.oldstyle./eight.oldstyle/zero.oldstyle/seven.oldstyle m/two.oldstyle aan kavels voor detailhandel verkocht worden. Het gaat om een restkavel. Het plangebied is bouwrijp gereed. PROGRAMMA Nog te realiseren m/two.oldstyle/percent.oldstyle Bedrijfskavels /three.oldstyle./eight.oldstyle/zero.oldstyle/seven.oldstyle/one.oldstyle/zero.oldstyle/zero.oldstyle/percent.oldstyle Woon-werk kavels - /zero.oldstyle/percent.oldstyle Totaal /three.oldstyle./eight.oldstyle/zero.oldstyle/seven.oldstyle/one.oldstyle/zero.oldstyle/zero.oldstyle/percent.oldstyle RUIMTEGEBRUIK Omschrijving Aantal (m/two.oldstyle) /percent.oldstyle Uitgeefbaar /three.oldstyle/seven.oldstyle./three.oldstyle/seven.oldstyle/one.oldstyle/six.oldstyle/two.oldstyle/percent.oldstyle Openbaar gebied /two.oldstyle/three.oldstyle./one.oldstyle/eight.oldstyle/five.oldstyle/three.oldstyle/eight.oldstyle/percent.oldstyle Totaal /six.oldstyle/zero.oldstyle./five.oldstyle/five.oldstyle/six.oldstyle/one.oldstyle/zero.oldstyle/zero.oldstyle/percent.oldstyle PROJECTGEGEVENS Omschrijving Kern Steenwijk Project Bedrijventerrein Novac Programma Mijn STWL Portefeuillehouder Marcel Scheringa Verwacht eindjaar /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle Restant looptijd /one.oldstyle jaar Plangebied /six.oldstyle ha
Financieel Omschrijving Bedrag (/Euro.taboldstyle)* Boekwaarde per /one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle/one.oldstyle/five.oldstyle/six.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Nog te realiseren kosten /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v./four.oldstyle/three.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Nog te realiseren opbrengsten /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v.-/two.oldstyle/zero.oldstyle/two.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Rentetoerekening /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v.
(rekenrente /one.oldstyle,/zero.oldstyle/percent.oldstyle)/two.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Resultaat EW per /three.oldstyle/one.oldstyle-/one.oldstyle/two.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle-/one.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstylevoordelig Winstneming / verliesneming /six.oldstyle/one.oldstyle/one.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyleverlies Resultaat EW per /three.oldstyle/one.oldstyle-/one.oldstyle/two.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle (correctie winst/verlies)/six.oldstyle/zero.oldstyle/nine.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstylenadelig Resultaat NCW per /one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle (discontovoet /two.oldstyle/percent.oldstyle)-/one.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstylevoordelig */Euro.taboldstyle afgerond, duizendtallen; + is nadelig – is voordelig De boekwaarde per /one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle bedraagt circa /Euro.taboldstyle /one.oldstyle/five.oldstyle/six.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle negatief. Het betreft het saldo van de gerealiseerde kosten en opbrengsten tot en met /two.oldstyle/zero.oldstyle/one.oldstyle/eight.oldstyle.
De nog te realiseren kosten bedragen circa /Euro.taboldstyle /four.oldstyle/three.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,=. Het gaat hoofdzakelijk om kosten in het kader van het woonrijpmaken. De nog te realiseren opbrengsten bedragen circa /Euro.taboldstyle /two.oldstyle/zero.oldstyle/two.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,=. Het betreft de grondopbrengst uit verkoop van de resterende twee kavels. De rentetoerekening bedraagt circa /Euro.taboldstyle /two.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,= op basis van een rekenrente van /one.oldstyle,/zero.oldstyle/percent.oldstyle. Het resultaat op eindwaarde per /three.oldstyle/one.oldstyle-/one.oldstyle/two.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle bedraagt circa /Euro.taboldstyle /one.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,= voordelig. Dat is inclusief de reeds getroff en verliesneming van circa /Euro.taboldstyle /six.oldstyle/one.oldstyle/one.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,=. Hiervoor gecorrigeerd bedraagt het werkelijke projectresultaat op eindwaarde per /three.oldstyle/one.oldstyle-/one.oldstyle/two.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle circa /Euro.taboldstyle /six.oldstyle/zero.oldstyle/nine.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,= nadelig.
Het resultaat op netto contante waarde per /one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle bedraagt circa /Euro.taboldstyle /one.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,= voordelig. Risico’s In het onderstaande overzicht staan de risico’s van het project weergegeven. Projectrisico’s Kans Gevolg Risico Geen verkoop restkavel /five.oldstyle/zero.oldstyle/percent.oldstyle/Euro.taboldstyle /one.oldstyle/nine.oldstyle/eight.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle/Euro.taboldstyle /nine.oldstyle/nine.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle In het project Novac vormt met name de afzet een risico. Het totale risicobedrag is gekwanti- /f_i ceerd op /Euro.taboldstyle /nine.oldstyle/nine.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,=.
/seven.oldstyle/two.oldstyle /seven.oldstyle/three.oldstyle Meerjaren Begroting Grondexploitaties /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v. Gemeente Steenwijkerland /three.oldstyle./two.oldstyle./eight.oldstyle | Industrieterrein Boterberg-Zuid Oldemarkt Beschrijving Het bedrijventerrein Boterberg, gelegen ten noordwesten van Oldemarkt, is gericht op kleinschalige bedrijvigheid met lokale of bovenlokale functie. De zuidzijde van het terrein biedt volop ruimte voor nieuwe bedrijven of bedrijven die willen uitbreiden. Om beter aan te kunnen sluiten bij de lokale economische situatie, is de bestemming van een gedeelte van het terrein gewijzigd. Hiermee kunnen op een gedeelte van het terrein woon-/werk combi- naties worden gerealiseerd. Voortgang Er dient nog circa /five.oldstyle./seven.oldstyle/five.oldstyle/zero.oldstyle m/two.oldstyle zichtlocatie en circa /one.oldstyle/three.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle m/two.oldstyle aan regulier bedrijfskavel uitgege- ven te worden. De uitgifte van bedrijfskavels in beide categorieën is evenredig verdeeld per jaar van /two.oldstyle/zero.oldstyle/two.oldstyle/one.oldstyle tot en met /two.oldstyle/zero.oldstyle/two.oldstyle/eight.oldstyle.
Tevens is er circa /one.oldstyle/five.oldstyle./seven.oldstyle/zero.oldstyle/zero.oldstyle m/two.oldstyle grond gereserveerd voor tijdelijk gebruik ten behoeve van zonnepanelen.. De uitgifte van de grond dat tijdelijk in gebruik is als zonnepark, zal na /two.oldstyle/zero.oldstyle/three.oldstyle/four.oldstyle weer beschikbaar zijn voor uitgifte als bedrijfsgrond. Het plange- bied is bouwrijp gereed. PROGRAMMA Nog te realiseren m/two.oldstyle/percent.oldstyle Bedrijfskavels zicht /five.oldstyle./seven.oldstyle/four.oldstyle/eight.oldstyle/one.oldstyle/seven.oldstyle/percent.oldstyle Bedrijfskavels niet-zicht /one.oldstyle/three.oldstyle./zero.oldstyle/five.oldstyle/two.oldstyle/three.oldstyle/eight.oldstyle/percent.oldstyle Tijdelijk gebruik zonnepanelen /one.oldstyle/five.oldstyle./six.oldstyle/eight.oldstyle/five.oldstyle/four.oldstyle/five.oldstyle/percent.oldstyle Woon-werk kavels - /zero.oldstyle/percent.oldstyle Totaal /three.oldstyle/four.oldstyle./four.oldstyle/eight.oldstyle/five.oldstyle/one.oldstyle/zero.oldstyle/zero.oldstyle/percent.oldstyle RUIMTEGEBRUIK Omschrijving Aantal (m/two.oldstyle) /percent.oldstyle Uitgeefbaar /four.oldstyle/eight.oldstyle./nine.oldstyle/eight.oldstyle/eight.oldstyle/eight.oldstyle/one.oldstyle/percent.oldstyle Verharding /four.oldstyle./nine.oldstyle/six.oldstyle/eight.oldstyle/eight.oldstyle/percent.oldstyle Groen
/five.oldstyle./eight.oldstyle/three.oldstyle/zero.oldstyle/one.oldstyle/zero.oldstyle/percent.oldstyle Water - -/percent.oldstyle Totaal /one.oldstyle/zero.oldstyle/zero.oldstyle/percent.oldstyle PROJECTGEGEVENS Omschrijving Kern Oldemarkt Project Boterberg-Zuid Programma Mijn STWL Portefeuillehouder Marcel Scheringa Verwacht eindjaar /two.oldstyle/zero.oldstyle/three.oldstyle/eight.oldstyle Restant looptijd /two.oldstyle/zero.oldstyle jaar Plangebied /five.oldstyle/nine.oldstyle,/eight.oldstyle ha Financieel Omschrijving Bedrag (/Euro.taboldstyle)* Boekwaarde per /one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle/one.oldstyle./zero.oldstyle/zero.oldstyle/one.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Nog te realiseren kosten /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v./four.oldstyle/nine.oldstyle/five.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Nog te realiseren opbrengsten /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v.-/one.oldstyle./seven.oldstyle/one.oldstyle/three.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Rentetoerekening /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v.
(rekenrente /one.oldstyle,/zero.oldstyle/percent.oldstyle)/one.oldstyle/one.oldstyle/four.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Resultaat EW per /three.oldstyle/one.oldstyle-/one.oldstyle/two.oldstyle-/two.oldstyle/zero.oldstyle/three.oldstyle/eight.oldstyle-/seven.oldstyle/four.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstylevoordelig Winstneming / verliesneming /three.oldstyle/zero.oldstyle/nine.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyleverlies Resultaat EW per /three.oldstyle/one.oldstyle-/one.oldstyle/two.oldstyle-/two.oldstyle/zero.oldstyle/three.oldstyle/eight.oldstyle (correctie winst/verlies)/two.oldstyle/three.oldstyle/six.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstylenadelig Resultaat NCW per /one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle (discontovoet /two.oldstyle/percent.oldstyle)-/five.oldstyle/zero.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstylevoordelig */Euro.taboldstyle afgerond, duizendtallen; + is nadelig – is voordelig De boekwaarde per /one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle bedraagt circa /Euro.taboldstyle /one.oldstyle./zero.oldstyle/zero.oldstyle/one.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle negatief.
Het betreft het saldo van de gerealiseerde kosten en opbrengsten tot en met /two.oldstyle/zero.oldstyle/one.oldstyle/eight.oldstyle. De nog te realiseren kosten bedragen circa /Euro.taboldstyle /four.oldstyle/nine.oldstyle/five.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,=. Het gaat hoofdzakelijk om kosten in het kader van het woonrijpmaken. De nog te realiseren opbrengsten bedragen circa /Euro.taboldstyle /one.oldstyle./seven.oldstyle/one.oldstyle/three.oldstyle../zero.oldstyle/zero.oldstyle/zero.oldstyle,=. Het betreft de grondop- brengst uit verkoop van de resterende kavels. De rentetoerekening bedraagt circa /Euro.taboldstyle /one.oldstyle/one.oldstyle/four.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,= op basis van een rekenrente van /one.oldstyle,/zero.oldstyle/percent.oldstyle. Het resultaat op eindwaarde per /three.oldstyle/one.oldstyle-/one.oldstyle/two.oldstyle-/two.oldstyle/zero.oldstyle/three.oldstyle/eight.oldstyle bedraagt circa /Euro.taboldstyle /seven.oldstyle/four.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,= voordelig. Dat is inclu- sief de reeds getroff en verliesneming van circa /Euro.taboldstyle /three.oldstyle/zero.oldstyle/nine.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,=.
Hiervoor gecorrigeerd bedraagt het werkelijke projectresultaat op eindwaarde per /three.oldstyle/one.oldstyle-/one.oldstyle/two.oldstyle-/two.oldstyle/zero.oldstyle/three.oldstyle/eight.oldstyle circa /Euro.taboldstyle /two.oldstyle/three.oldstyle/six.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,= nadelig. Het resultaat op netto contante waarde per /one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle bedraagt circa /Euro.taboldstyle /five.oldstyle/zero.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,= voordelig. Risico’s In het onderstaande overzicht staan de risico’s van het project weergegeven. Projectrisico’s Kans Gevolg Risico Afzet restkavels /seven.oldstyle/five.oldstyle/percent.oldstyle/Euro.taboldstyle /six.oldstyle/four.oldstyle/six.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle/Euro.taboldstyle /four.oldstyle/eight.oldstyle/four.oldstyle./five.oldstyle/zero.oldstyle/zero.oldstyle In het project Heetveld vormt de afzet een groot risico. Het totale risicobedrag is gekwanti/f_i - ceerd op /Euro.taboldstyle /four.oldstyle/eight.oldstyle/four.oldstyle./five.oldstyle/zero.oldstyle/zero.oldstyle,=.
/seven.oldstyle/four.oldstyle /seven.oldstyle/five.oldstyle Meerjaren Begroting Grondexploitaties /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v. Gemeente Steenwijkerland /three.oldstyle./two.oldstyle./nine.oldstyle | Siebrandlocatie Vollenhove Beschrijving Wat is er mooier dan wonen én werken in de ‘stad der paleizen’? Vollenhove, het voormalige Zuiderzeestadje, is bekend om z’n havezaten, kastelen, landgoederen en stadstuinen. In het plangebied van de Siebrandlocatie stond vroeger een kaasfabriek, waarnaar de grondexploi- tatie is vernoemd. Nu is er in dit historisch decor de mogelijkheid om wonen én werken te combineren op één locatie. In deze locatie hoefden geen infrastructurele elementen worden aangelegd omdat het gebied ingesloten ligt tussen twee bestaande wegen. Voortgang Per /one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle moet nog in totaal /eight.oldstyle./seven.oldstyle/six.oldstyle/zero.oldstyle m/two.oldstyle uitgeefbaar oppervlak verkocht worden. Hiervan is /two.oldstyle./two.oldstyle/four.oldstyle/one.oldstyle m/two.oldstyle bedrijfskavel en dit staat in optie voor verkoop in /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle.
Het overig oppervlak, /six.oldstyle./five.oldstyle/one.oldstyle/nine.oldstyle m/two.oldstyle, zijn /five.oldstyle woon-werk kavels en hiervan staat ongeveer de helft aan oppervlak (/two.oldstyle kavels) in optie voor verkoop in /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle. Het resterende oppervlak staat evenredig per jaar gefaseerd in de planning. Het plangebied is bouwrijp gereed. PROGRAMMA Nog te realiseren m/two.oldstyle/percent.oldstyle Bedrijfskavels /two.oldstyle./two.oldstyle/four.oldstyle/one.oldstyle/two.oldstyle/six.oldstyle/percent.oldstyle Woon-werk kavels /six.oldstyle./five.oldstyle/one.oldstyle/nine.oldstyle/seven.oldstyle/four.oldstyle/percent.oldstyle Totaal /eight.oldstyle./seven.oldstyle/six.oldstyle/zero.oldstyle/one.oldstyle/zero.oldstyle/zero.oldstyle/percent.oldstyle RUIMTEGEBRUIK Omschrijving Aantal (m/two.oldstyle) /percent.oldstyle Uitgeefbaar /one.oldstyle/two.oldstyle./two.oldstyle/seven.oldstyle/four.oldstyle/nine.oldstyle/nine.oldstyle,/two.oldstyle/percent.oldstyle Openbaar gebied /one.oldstyle/zero.oldstyle/two.oldstyle/zero.oldstyle,/eight.oldstyle/percent.oldstyle Totaal /one.oldstyle/two.oldstyle./three.oldstyle/seven.oldstyle/six.oldstyle/one.oldstyle/zero.oldstyle/zero.oldstyle/percent.oldstyle PROJECTGEGEVENS Omschrijving Kern Vollenhove Project Weg van Rollecate Programma Mijn STWL Portefeuillehouder Marcel Scheringa Verwacht
eindjaar /two.oldstyle/zero.oldstyle/two.oldstyle/two.oldstyle Restant looptijd /four.oldstyle jaar Plangebied /one.oldstyle,/two.oldstyle ha Financieel Omschrijving Bedrag (/Euro.taboldstyle)* Boekwaarde per /one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle/seven.oldstyle/nine.oldstyle/one.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Nog te realiseren kosten /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v./one.oldstyle/five.oldstyle/seven.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Nog te realiseren opbrengsten /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v.-/nine.oldstyle/six.oldstyle/one.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Rentetoerekening /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v.
(rekenrente /one.oldstyle,/zero.oldstyle/percent.oldstyle)/one.oldstyle/six.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle Resultaat EW per /three.oldstyle/one.oldstyle-/one.oldstyle/two.oldstyle-/two.oldstyle/zero.oldstyle/two.oldstyle/two.oldstyle-/nine.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstylevoordelig Winstneming / verliesneming /three.oldstyle/one.oldstyle/nine.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyleverlies Resultaat EW per /three.oldstyle/one.oldstyle-/one.oldstyle/two.oldstyle-/two.oldstyle/zero.oldstyle/two.oldstyle/two.oldstyle (correctie winst/verlies)/three.oldstyle/one.oldstyle/zero.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstylenadelig Resultaat NCW per /one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle (discontovoet /two.oldstyle/percent.oldstyle)-/eight.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstylevoordelig */Euro.taboldstyle afgerond, duizendtallen; + is nadelig – is voordelig De boekwaarde per /one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle bedraagt circa /Euro.taboldstyle /seven.oldstyle/nine.oldstyle/one.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle negatief. Het betreft het saldo van de gerealiseerde kosten en opbrengsten tot en met /two.oldstyle/zero.oldstyle/one.oldstyle/eight.oldstyle.
De nog te realiseren kosten bedragen circa /Euro.taboldstyle /one.oldstyle/five.oldstyle/seven.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,=. Het gaat hoofdzakelijk om kosten in het kader van het woonrijpmaken. De nog te realiseren opbrengsten bedragen circa /Euro.taboldstyle /nine.oldstyle/six.oldstyle/one.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,=. Het betreft de grondopbrengst uit verkoop van de resterende kavels. De rentetoerekening bedraagt circa /Euro.taboldstyle /one.oldstyle/six.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,= voordelig op basis van een rekenrente van /one.oldstyle,/zero.oldstyle/percent.oldstyle. Het resultaat op eindwaarde per /three.oldstyle/one.oldstyle-/one.oldstyle/two.oldstyle-/two.oldstyle/zero.oldstyle/two.oldstyle/two.oldstyle bedraagt circa /Euro.taboldstyle /nine.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,= voordelig. Dat is inclusief de reeds getroff en verliesneming van circa /Euro.taboldstyle /three.oldstyle/one.oldstyle/nine.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,=. Hiervoor gecorrigeerd bedraagt het werkelijke projectresultaat op eindwaarde per /three.oldstyle/one.oldstyle-/one.oldstyle/two.oldstyle-/two.oldstyle/zero.oldstyle/two.oldstyle/two.oldstyle circa /Euro.taboldstyle /three.oldstyle/one.oldstyle/zero.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,= nadelig.
Het resultaat op netto contante waarde per /one.oldstyle-/one.oldstyle-/two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle bedraagt circa /Euro.taboldstyle /eight.oldstyle./zero.oldstyle/zero.oldstyle/zero.oldstyle,= voordelig. Risico’s Voor het project Siebrandlocatie is het risico nihil, daarom worden er geen risico’s gekwanti- /f_i ceerd.
/seven.oldstyle/six.oldstyle /seven.oldstyle/seven.oldstyle Bijlagen Meerjaren Begroting Grondexploitaties /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v. Gemeente Steenwijkerland Bijlagen /one.oldstyle Grondexploitatie Woldmeenthe /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle (complex /zero.oldstyle/five.oldstyle) Grondexploitatie gemeente Steenwijkerland Project Woldmeenthe Projectnummer/FCL 9831_05_00 Planeconoom Control Projectleider Planeconoom Datum berekening/wijziging 24 jul 2019 Prijspeildatum 1 jan 2019 Startjaar ontwikkeling: 01-01- 2019 Eindjaar ontwikkeling: 31-12- 2028 Rekenrente 1,00% Discontovoet 2,00% Kostenstijging 2,00% Opbrengstenstijging 1,50% % kostenstijging: 1,0000 1,0200 1,0200 1,0200 1,0200 1,0200 1,0200 1,0200 1,0200 1,0200 1,0000 Kosten % rente: 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL kosten kosten (gerealiseerd) realiseren verplichtingen Totaal kosten 18.892.312 18.406.300 486.013 - 198.863 118.224 74.912 13.431 13.431 13.431 13.431 13.431 13.431 13.431 - % opbrengststijging: 1,0000 1,0150 1,0150 1,0150 1,0150 1,0150 1,0150 1,0150 1,0150 1,0150 1,0000 Opbrengsten % rente: 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0000 Code Omschrijving
Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL opbrengsten opbrengsten (gerealiseerd) realiseren verplichtingen Totaal opbrengsten 19.742.218 18.407.749 1.334.469 - 542.000 100.000 86.559 86.559 86.559 86.559 86.559 86.559 86.559 86.559 - Inflatie correctie en bepaling kasstroom Uitgavenstijging: 17.335 17.335 - 2.364 3.026 822 1.107 1.398 1.694 1.997 2.305 2.620 - Inkomstenstijging: 61.028 61.028 - 1.500 2.616 3.954 5.312 6.690 8.088 9.508 10.949 12.412 - Kasstroom: - 343.137- 19.089 11.237- 76.260- 77.332- 78.420- 79.522- 80.639- 81.772- 82.919- - Rente toerekening: 48.196- 48.196- 14- 3.446- 3.290- 3.435- 4.232- 5.047- 5.882- 6.736- 7.610- 8.504- - Saldo per ultimo: (per 31-12-2028) 941.795- 1.449- - 344.601- 328.958- 343.485- 423.179- 504.744- 588.211- 673.615- 760.990- 850.372- 941.795- - Overschot op startwaarde: (per 1-1-2019) 788.052- Jasper Dijkstra /seven.oldstyle/nine.oldstyle Bijlagen Meerjaren Begroting Grondexploitaties /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v.
/seven.oldstyle/eight.oldstyle Gemeente Steenwijkerland Bijlagen /two.oldstyle Grondexploitatie Heetveld /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle (complex /one.oldstyle/five.oldstyle) Grondexploitatie gemeente Steenwijkerland Project Heetveld Projectnummer/FCL 9831_15_00 Planeconoom Control Projectleider Planeconoom Datum berekening/wijziging 24 jul 2019 Prijspeildatum 1 jan 2019 Startjaar ontwikkeling: 01-01- 2019 Eindjaar ontwikkeling: 31-12- 2022 Rekenrente 1,00% Discontovoet 2,00% Kostenstijging 2,00% Opbrengstenstijging 1,50% % kostenstijging: 1,0000 1,0200 1,0200 1,0200 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Kosten % rente: 1,0100 1,0100 1,0100 1,0100 1,0100 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL kosten kosten (gerealiseerd) realiseren verplichtingen Totaal kosten 636.537 553.354 83.183 - 17.173 16.870 24.729 24.411 - - - - - - - % opbrengststijging: 1,0000 1,0150 1,0150 1,0150 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Opbrengsten % rente: 1,0100 1,0100 1,0100 1,0100 1,0100 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL opbrengsten opbrengsten (gerealiseerd) realiseren verplichtingen Totaal opbrengsten
658.004 390.196 267.808 - 9.883 - 125.795 132.130 - - - - - - - Inflatie correctie en bepaling kasstroom Uitgavenstijging: 2.831 2.831 - 337 999 1.494 - - - - - - - Inkomstenstijging: 9.838 9.838 - - 3.802 6.035 - - - - - - - Kasstroom: - 7.291 17.207 103.869- 112.260- - - - - - - - Rente toerekening: 6.153 6.153 1.632 1.721 1.910 890 - - - - - - - Saldo per ultimo: (per 31-12-2022) 22.321- 163.158 - 172.080 191.008 89.049 22.321- - - - - - - - Overschot op startwaarde: (per 1-1-2019) 21.033- Jasper Dijkstra /eight.oldstyle/one.oldstyle Bijlagen Meerjaren Begroting Grondexploitaties /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v.
/eight.oldstyle/zero.oldstyle Gemeente Steenwijkerland Bijlagen /three.oldstyle Grondexploitatie Noordwal Vollenhove /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle (complex /one.oldstyle/nine.oldstyle) Grondexploitatie gemeente Steenwijkerland Project Noordwal Vollenhove Projectnummer/FCL 9831_19_00 Planeconoom Control Projectleider Planeconoom Datum berekening/wijziging 24 jul 2019 Prijspeildatum 1 jan 2019 Startjaar ontwikkeling: 01-01- 2019 Eindjaar ontwikkeling: 31-12- 2024 Rekenrente 1,00% Discontovoet 2,00% Kostenstijging 2,00% Opbrengstenstijging 1,50% % kostenstijging: 1,0000 1,0200 1,0200 1,0200 1,0200 1,0200 1,0000 1,0000 1,0000 1,0000 1,0000 Kosten % rente: 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0000 1,0000 1,0000 1,0000 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL kosten kosten (gerealiseerd) realiseren verplichtingen Totaal kosten 11.450.877 10.519.073 931.804 - 284.328 139.216 116.423 116.423 116.423 158.991 - - - - - % opbrengststijging: 1,0000 1,0150 1,0150 1,0150 1,0150 1,0150 1,0000 1,0000 1,0000 1,0000 1,0000 Opbrengsten % rente: 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0000 1,0000 1,0000 1,0000 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL opbrengsten opbrengsten (gerealiseerd)
realiseren verplichtingen Totaal opbrengsten 12.022.206 9.729.069 2.293.137 - 1.202.135 218.201 218.201 218.201 218.201 218.201 - - - - - Inflatie correctie en bepaling kasstroom Uitgavenstijging: 40.759 40.759 - 2.784 4.704 7.126 9.597 16.548 - - - - - Inkomstenstijging: 50.088 50.088 - 3.273 6.595 9.967 13.390 16.863 - - - - - Kasstroom: - 917.807- 79.474- 103.669- 104.618- 105.570- 59.525- - - - - - Rente toerekening: 7.743- 7.743- 7.900 1.199- 2.006- 3.063- 4.139- 5.236- - - - - - Saldo per ultimo: (per 31-12-2024) 588.401- 790.004 - 119.903- 200.576- 306.250- 413.931- 523.640- 588.401- - - - - - Overschot op startwaarde: (per 1-1-2019) 532.933- Jasper Dijkstra /eight.oldstyle/three.oldstyle Bijlagen Meerjaren Begroting Grondexploitaties /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v.
/eight.oldstyle/two.oldstyle Gemeente Steenwijkerland Bijlagen /four.oldstyle Grondexploitatie Hoofdstraat/Hilligerspoort Ossenzijl /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle (complex /two.oldstyle/seven.oldstyle) Grondexploitatie gemeente Steenwijkerland Project Hoofdstraat/Hilligerspoort Ossenzijl Projectnummer/FCL 9831_27_00 Planeconoom Control Projectleider Planeconoom Datum berekening/wijziging 24 jul 2019 Prijspeildatum 1 jan 2019 Startjaar ontwikkeling: 01-01- 2019 Eindjaar ontwikkeling: 31-12- 2020 Rekenrente 1,00% Discontovoet 2,00% Kostenstijging 2,00% Opbrengstenstijging 1,50% % kostenstijging: 1,0000 1,0200 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Kosten % rente: 1,0100 1,0100 1,0100 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL kosten kosten (gerealiseerd) realiseren verplichtingen Totaal kosten 608.528 559.638 48.891 - 26.543 22.348 - - - - - - - - - % opbrengststijging: 1,0000 1,0150 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Opbrengsten % rente: 1,0100 1,0100 1,0100 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL opbrengsten opbrengsten (gerealiseerd)
realiseren verplichtingen Totaal opbrengsten 673.604 602.036 71.568 - 71.568 - - - - - - - - - - Inflatie correctie en bepaling kasstroom Uitgavenstijging: 447 447 - 447 - - - - - - - - - Inkomstenstijging: - - - - - - - - - - - - - Kasstroom: - 45.025- 22.795 - - - - - - - - - Rente toerekening: 1.302- 1.302- 424- 878- - - - - - - - - - Saldo per ultimo: (per 31-12-2020) 65.932- 42.399- - 87.848- 65.932- - - - - - - - - - Overschot op startwaarde: (per 1-1-2019) 64.639- Jasper Dijkstra /eight.oldstyle/five.oldstyle Bijlagen Meerjaren Begroting Grondexploitaties /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v.
/eight.oldstyle/four.oldstyle Gemeente Steenwijkerland Bijlagen /five.oldstyle Grondexploitatie Kornputkwartier /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle (complex /three.oldstyle/six.oldstyle) Grondexploitatie gemeente Steenwijkerland Project Kornputkwartier Projectnummer/FCL 9831_36_00 Planeconoom Control Projectleider Planeconoom Datum berekening/wijziging 24 jul 2019 Prijspeildatum 1 jan 2019 Startjaar ontwikkeling: 01-01- 2019 Eindjaar ontwikkeling: 31-12- 2028 Rekenrente 1,00% Discontovoet 2,00% Kostenstijging 2,00% Opbrengstenstijging 1,50% % kostenstijging: 1,0000 1,0200 1,0200 1,0200 1,0200 1,0200 1,0200 1,0200 1,0200 1,0200 1,0000 Kosten % rente: 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL kosten kosten (gerealiseerd) realiseren verplichtingen Totaal kosten 36.051.167 32.346.529 3.704.638 - 398.130 462.165 367.478 338.409 561.409 315.409 315.409 315.409 315.409 315.409 - % opbrengststijging: 1,0000 1,0150 1,0150 1,0150 1,0150 1,0150 1,0150 1,0150 1,0150 1,0150 1,0000 Opbrengsten % rente: 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL opbrengsten
opbrengsten (gerealiseerd) realiseren verplichtingen Totaal opbrengsten 36.552.309 19.078.865 17.473.444 - 2.220.535 2.427.814 1.997.302 2.106.500 1.453.549 1.453.549 1.453.549 1.453.549 1.453.549 1.453.549 - Inflatie correctie en bepaling kasstroom Uitgavenstijging: 326.276 326.276 - 9.243 14.846 20.713 46.278 32.828 39.793 46.897 54.143 61.534 - Inkomstenstijging: 1.082.315 1.082.315 - 36.417 60.368 96.222 89.195 112.336 135.824 159.665 183.863 208.424 - Kasstroom: - 1.822.405- 1.992.822- 1.675.346- 1.843.599- 935.056- 1.217.648- 1.234.171- 1.250.908- 1.267.860- 1.285.030- - Rente toerekening: 645.613 645.613 132.677 115.779 97.009 81.226 63.602 54.887 43.260 31.351 19.155 6.668 - Saldo per ultimo: (per 31-12-2028) 611.569- 13.267.665 - 11.577.936 9.700.893 8.122.556 6.360.183 5.488.728 4.325.967 3.135.056 1.915.498 666.793 611.569- - Overschot op startwaarde: (per 1-1-2019) 511.733- Jasper Dijkstra Gemeente Steenwijkerland Bijlagen /five.oldstyle Grondexploitatie Kornputkwartier (complex Grondexploitatie Kornputkwartier complex /three.oldstyle/six.oldstyle) Grondexploitatie Kornputkwartier /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle complex /three.oldstyle/six.oldstyle) /eight.oldstyle/seven.oldstyle Bijlagen Meerjaren Begroting Grondexploitaties /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v.
/eight.oldstyle/six.oldstyle Gemeente Steenwijkerland Bijlagen /six.oldstyle Grondexploitatie Oosterbroek Oldemarkt /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle (complex /four.oldstyle/four.oldstyle) Grondexploitatie gemeente Steenwijkerland Project Oosterbroek Oldemarkt Projectnummer/FCL 9831_44_00 Planeconoom Control Projectleider Planeconoom Datum berekening/wijziging 24 jul 2019 Prijspeildatum 1 jan 2019 Startjaar ontwikkeling: 01-01- 2019 Eindjaar ontwikkeling: 31-12- 2022 Rekenrente 1,00% Discontovoet 2,00% Kostenstijging 2,00% Opbrengstenstijging 1,50% % kostenstijging: 1,0000 1,0200 1,0200 1,0200 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Kosten % rente: 1,0100 1,0100 1,0100 1,0100 1,0100 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL kosten kosten (gerealiseerd) realiseren verplichtingen Totaal kosten 2.533.393 1.831.971 701.422 - 251.506 171.500 139.208 139.208 - - - - - - - % opbrengststijging: 1,0000 1,0150 1,0150 1,0150 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Opbrengsten % rente: 1,0100 1,0100 1,0100 1,0100 1,0100 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL opbrengsten opbrengsten (gerealiseerd) realiseren
verplichtingen Totaal opbrengsten 2.550.546 904.228 1.646.318 - 850.048 265.423 265.423 265.423 - - - - - - - Inflatie correctie en bepaling kasstroom Uitgavenstijging: 17.575 17.575 - 3.430 5.624 8.521 - - - - - - - Inkomstenstijging: 24.128 24.128 - 3.981 8.022 12.124 - - - - - - - Kasstroom: - 598.542- 94.475- 128.613- 129.818- - - - - - - - Rente toerekening: 16.349 16.349 9.277 3.385 2.474 1.212 - - - - - - - Saldo per ultimo: (per 31-12-2022) 7.357- 927.743 - 338.478 247.388 121.249 7.357- - - - - - - - Overschot op startwaarde: (per 1-1-2019) 6.933- Jasper Dijkstra /eight.oldstyle/nine.oldstyle Bijlagen Meerjaren Begroting Grondexploitaties /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v.
/eight.oldstyle/eight.oldstyle Gemeente Steenwijkerland Bijlagen /seven.oldstyle Grondexploitatie Willemsoord uitbreiding /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle (complex /four.oldstyle/six.oldstyle) Grondexploitatie gemeente Steenwijkerland Project Willemsoord uitbreiding Projectnummer/FCL 9831_46_00 Planeconoom Control Projectleider Planeconoom Datum berekening/wijziging 24 jul 2019 Prijspeildatum 1 jan 2019 Startjaar ontwikkeling: 01-01- 2019 Eindjaar ontwikkeling: 31-12- 2025 Rekenrente 1,00% Discontovoet 2,00% Kostenstijging 2,00% Opbrengstenstijging 1,50% % kostenstijging: 1,0000 1,0200 1,0200 1,0200 1,0200 1,0200 1,0200 1,0000 1,0000 1,0000 1,0000 Kosten % rente: 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0000 1,0000 1,0000 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL kosten kosten (gerealiseerd) realiseren verplichtingen Totaal kosten 1.046.185 683.121 363.064 - 35.810 65.987 57.206 51.015 51.015 51.015 51.015 - - - - % opbrengststijging: 1,0000 1,0150 1,0150 1,0150 1,0150 1,0150 1,0150 1,0000 1,0000 1,0000 1,0000 Opbrengsten % rente: 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0000 1,0000 1,0000 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL opbrengsten opbrengsten
(gerealiseerd) realiseren verplichtingen Totaal opbrengsten 1.460.536 593.160 867.376 - 206.185 160.199 100.199 100.199 100.199 100.199 100.199 - - - - Inflatie correctie en bepaling kasstroom Uitgavenstijging: 22.705 22.705 - 1.320 2.311 3.123 4.205 5.310 6.436 - - - - Inkomstenstijging: 33.264 33.264 - 2.403 3.029 4.577 6.149 7.744 9.363 - - - - Kasstroom: - 170.375- 95.295- 43.710- 50.638- 51.127- 51.617- 52.110- - - - - Rente toerekening: 13.706- 13.706- 900 795- 1.756- 2.211- 2.739- 3.278- 3.827- - - - - Saldo per ultimo: (per 31-12-2025) 438.616- 89.961 - 79.514- 175.604- 221.070- 273.918- 327.784- 382.679- 438.616- - - - - Overschot op startwaarde: (per 1-1-2019) 389.478- Jasper Dijkstra Grondexploitatie Willemsoord uitbreiding complex /four.oldstyle/six.oldstyle) Grondexploitatie Willemsoord uitbreiding /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle Grondexploitatie Willemsoord uitbreiding /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle /nine.oldstyle/one.oldstyle Bijlagen Meerjaren Begroting Grondexploitaties /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v.
/nine.oldstyle/zero.oldstyle Gemeente Steenwijkerland Bijlagen /eight.oldstyle Grondexploitatie Giethoorn Noord fase /one.oldstyle & /two.oldstyle /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle (complex /five.oldstyle/two.oldstyle) Grondexploitatie gemeente Steenwijkerland Project Giethoorn noord fase 1 & 2 Projectnummer/FCL 9831_52_00 Planeconoom Control Projectleider Planeconoom Datum berekening/wijziging 24 jul 2019 Prijspeildatum 1 jan 2019 Startjaar ontwikkeling: 01-01- 2019 Eindjaar ontwikkeling: 31-12- 2025 Rekenrente 1,00% Discontovoet 2,00% Kostenstijging 2,00% Opbrengstenstijging 1,50% % kostenstijging: 1,0000 1,0200 1,0200 1,0200 1,0200 1,0200 1,0200 1,0000 1,0000 1,0000 1,0000 Kosten % rente: 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0000 1,0000 1,0000 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL kosten kosten (gerealiseerd) realiseren verplichtingen Totaal kosten 3.066.343 2.341.421 724.921 - 123.257 100.277 100.277 100.277 100.277 100.277 100.277 - - - - % opbrengststijging: 1,0000 1,0150 1,0150 1,0150 1,0150 1,0150 1,0150 1,0000 1,0000 1,0000 1,0000 Opbrengsten % rente: 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0000 1,0000 1,0000 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL
opbrengsten opbrengsten (gerealiseerd) realiseren verplichtingen Totaal opbrengsten 4.258.134 2.318.730 1.939.404 - 563.265 229.356 229.356 229.356 229.356 229.356 229.356 - - - - Inflatie correctie en bepaling kasstroom Uitgavenstijging: 43.549 43.549 - 2.006 4.051 6.138 8.266 10.437 12.651 - - - - Inkomstenstijging: 74.081 74.081 - 3.440 6.932 10.477 14.074 17.726 21.432 - - - - Kasstroom: - 440.009- 130.514- 131.960- 133.418- 134.887- 136.368- 137.860- - - - - Rente toerekening: 45.566- 45.566- 227 4.171- 5.518- 6.893- 8.296- 9.727- 11.188- - - - - Saldo per ultimo: (per 31-12-2025) 1.267.889- 22.691 - 417.091- 551.775- 689.253- 829.563- 972.746- 1.118.841- 1.267.889- - - - - Overschot op startwaarde: (per 1-1-2019) 1.125.849- Jasper Dijkstra /nine.oldstyle/three.oldstyle Bijlagen Meerjaren Begroting Grondexploitaties /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v.
/nine.oldstyle/two.oldstyle Gemeente Steenwijkerland Bijlagen /nine.oldstyle Grondexploitatie Noordermaten Blokzijl Kuinre /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle (complex /five.oldstyle/eight.oldstyle) Grondexploitatie gemeente Steenwijkerland Project Noordermaten Blokzijl Projectnummer/FCL 9831_58_00 Planeconoom Control Projectleider Planeconoom Datum berekening/wijziging 24 jul 2019 Prijspeildatum 1 jan 2019 Startjaar ontwikkeling: 01-01- 2019 Eindjaar ontwikkeling: 31-12- 2021 Rekenrente 1,00% Discontovoet 2,00% Kostenstijging 2,00% Opbrengstenstijging 1,50% % kostenstijging: 1,0000 1,0200 1,0200 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Kosten % rente: 1,0100 1,0100 1,0100 1,0100 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL kosten kosten (gerealiseerd) realiseren verplichtingen Totaal kosten 3.109.922 2.541.955 567.967 - 219.905 186.788 161.274 - - - - - - - - % opbrengststijging: 1,0000 1,0150 1,0150 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Opbrengsten % rente: 1,0100 1,0100 1,0100 1,0100 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL opbrengsten opbrengsten (gerealiseerd) realiseren
verplichtingen Totaal opbrengsten 3.210.392 2.774.792 435.600 - 257.598 178.002 - - - - - - - - - Inflatie correctie en bepaling kasstroom Uitgavenstijging: 10.251 10.251 - 3.736 6.515 - - - - - - - - Inkomstenstijging: 2.670 2.670 - 2.670 - - - - - - - - - Kasstroom: - 37.693- 9.852 167.790 - - - - - - - - Rente toerekening: 7.714- 7.714- 2.328- 2.729- 2.657- - - - - - - - - Saldo per ultimo: (per 31-12-2021) 100.603- 232.837- - 272.859- 265.736- 100.603- - - - - - - - - Overschot op startwaarde: (per 1-1-2019) 96.697- Jasper Dijkstra /nine.oldstyle/five.oldstyle Bijlagen Meerjaren Begroting Grondexploitaties /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v.
/nine.oldstyle/four.oldstyle Gemeente Steenwijkerland Bijlagen /one.oldstyle/zero.oldstyle Grondexploitatie Overhavendijk Kuinre /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle (complex /six.oldstyle/one.oldstyle) Grondexploitatie gemeente Steenwijkerland Project Overhavendijk Kuinre Projectnummer/FCL 9831_61_00 Planeconoom Control Projectleider Planeconoom Datum berekening/wijziging 24 jul 2019 Prijspeildatum 1 jan 2019 Startjaar ontwikkeling: 01-01- 2019 Eindjaar ontwikkeling: 31-12- 2021 Rekenrente 1,00% Discontovoet 2,00% Kostenstijging 2,00% Opbrengstenstijging 1,50% % kostenstijging: 1,0000 1,0200 1,0200 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Kosten % rente: 1,0100 1,0100 1,0100 1,0100 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL kosten kosten (gerealiseerd) realiseren verplichtingen Totaal kosten 1.618.043 1.399.932 218.111 - 8.344 64.431 145.336 - - - - - - - - % opbrengststijging: 1,0000 1,0150 1,0150 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Opbrengsten % rente: 1,0100 1,0100 1,0100 1,0100 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL opbrengsten opbrengsten (gerealiseerd) realiseren
verplichtingen Totaal opbrengsten 1.632.075 1.552.075 80.000 - - 80.000 - - - - - - - - - Inflatie correctie en bepaling kasstroom Uitgavenstijging: 7.160 7.160 - 1.289 5.872 - - - - - - - - Inkomstenstijging: 1.200 1.200 - 1.200 - - - - - - - - - Kasstroom: - 8.344 15.481- 151.208 - - - - - - - - Rente toerekening: 4.597- 4.597- 1.521- 1.453- 1.623- - - - - - - - - Saldo per ultimo: (per 31-12-2021) 12.669- 152.143- - 145.321- 162.255- 12.669- - - - - - - - - Overschot op startwaarde: (per 1-1-2019) 12.177- Jasper Dijkstra /nine.oldstyle/seven.oldstyle Bijlagen Meerjaren Begroting Grondexploitaties /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v. /nine.oldstyle/six.oldstyle Gemeente Steenwijkerland Bijlagen /one.oldstyle/one.oldstyle Grondexploitatie Molenkampen III St.
Jansklooster /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle (complex /six.oldstyle/six.oldstyle) Grondexploitatie gemeente Steenwijkerland Project Molenkampen III Projectnummer/FCL 9831_66_00 Planeconoom Control Projectleider Planeconoom Datum berekening/wijziging 24 jul 2019 Prijspeildatum 1 jan 2019 Startjaar ontwikkeling: 01-01- 2019 Eindjaar ontwikkeling: 31-12- 2024 Rekenrente 1,00% Discontovoet 2,00% Kostenstijging 2,00% Opbrengstenstijging 1,50% % kostenstijging: 1,0000 1,0200 1,0200 1,0200 1,0200 1,0200 1,0000 1,0000 1,0000 1,0000 1,0000 Kosten % rente: 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0000 1,0000 1,0000 1,0000 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL kosten kosten (gerealiseerd) realiseren verplichtingen Totaal kosten 2.300.857 1.738.461 562.395 - 165.256 81.918 81.918 77.768 77.768 77.768 - - - - - % opbrengststijging: 1,0000 1,0150 1,0150 1,0150 1,0150 1,0150 1,0000 1,0000 1,0000 1,0000 1,0000 Opbrengsten % rente: 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0100 1,0000 1,0000 1,0000 1,0000 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL opbrengsten opbrengsten (gerealiseerd) realiseren verplichtingen Totaal opbrengsten 2.609.584 1.364.635 1.244.949 - 463.387 156.313 156.313 156.313 156.313
156.313 - - - - - Inflatie correctie en bepaling kasstroom Uitgavenstijging: 24.213 24.213 - 1.638 3.309 4.760 6.411 8.094 - - - - - Inkomstenstijging: 35.882 35.882 - 2.345 4.725 7.140 9.592 12.080 - - - - - Kasstroom: - 298.130- 75.101- 75.810- 80.925- 81.726- 82.531- - - - - - Rente toerekening: 0- 0- 3.738 794 51 706- 1.523- 2.355- - - - - - Saldo per ultimo: (per 31-12-2024) 320.397- 373.826 - 79.434 5.127 70.631- 152.262- 235.511- 320.397- - - - - - Overschot op startwaarde: (per 1-1-2019) 290.194- Jasper Dijkstra /nine.oldstyle/nine.oldstyle Bijlagen Meerjaren Begroting Grondexploitaties /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v.
/nine.oldstyle/eight.oldstyle Gemeente Steenwijkerland Bijlagen /one.oldstyle/two.oldstyle Grondexploitatie Scheerwolde /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle (complex /six.oldstyle/eight.oldstyle) Grondexploitatie gemeente Steenwijkerland Project Scheerwolde Projectnummer/FCL 9831_68_00 Planeconoom Control Projectleider Planeconoom Datum berekening/wijziging 24 jul 2019 Prijspeildatum 1 jan 2019 Startjaar ontwikkeling: 01-01- 2019 Eindjaar ontwikkeling: 31-12- 2022 Rekenrente 1,00% Discontovoet 2,00% Kostenstijging 2,00% Opbrengstenstijging 1,50% % kostenstijging: 1,0000 1,0200 1,0200 1,0200 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Kosten % rente: 1,0100 1,0100 1,0100 1,0100 1,0100 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL kosten kosten (gerealiseerd) realiseren verplichtingen Totaal kosten 793.432 675.124 118.309 - 44.080 25.804 22.803 25.621 - - - - - - - % opbrengststijging: 1,0000 1,0150 1,0150 1,0150 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Opbrengsten % rente: 1,0100 1,0100 1,0100 1,0100 1,0100 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 1,0000 Code Omschrijving Totaal Boekwaarde Nog te Opdrachten/ 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 ECL opbrengsten opbrengsten (gerealiseerd) realiseren verplichtingen
Totaal opbrengsten 1.054.272 135.912 918.360 - 183.340 288.340 183.340 263.340 - - - - - - - Inflatie correctie en bepaling kasstroom Uitgavenstijging: 3.006 3.006 - 516 921 1.568 - - - - - - - Inkomstenstijging: 20.320 20.320 - 2.750 5.541 12.029 - - - - - - - Kasstroom: - 139.260- 264.770- 165.157- 248.179- - - - - - - - 796.438 Rente toerekening: 10.701 10.701 5.392 4.053 1.446 191- - - - - - - - Saldo per ultimo: (per 31-12-2022) 267.453- 539.212 - 405.343 144.627 19.083- 267.453- - - - - - - - Overschot op startwaarde: (per 1-1-2019) 252.027- Jasper Dijkstra Grondexploitatie Scheerwolde /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle /one.oldstyle/zero.oldstyle/one.oldstyle Bijlagen Meerjaren Begroting Grondexploitaties /two.oldstyle/zero.oldstyle/one.oldstyle/nine.oldstyle e.v.