bijlage 3 Inzet capaciteit team V&H 2021
Tekst van het document
Inzet capaciteit 2021 - team Vergunningen en Handhaving Steller: E. Korving *) gebaseerd op realisatie periode 2018-2020
Kevin Kleijberg
Jaap van Mannekes
Roy Lakhpat
Robin Poutsma
Arnold Fillekes
Soeresh Mohanlal (1,0 fte)
Martin Smit (1,0 fte)
Dorethy Hiwat (1,0 fte)
vacature (1,0 fte)
inhuur (Yusuf 1,0 fte)
inhuur (Jasvant 1,0 fte)
Anita Gijsbertsen (0,67 fte)
Clifford Menick (1,00 fte)
Jolanda Dekkers (0,3 fte tot 1 juli 2021)
vacature (1,0 fte)
inhuur DCMR (0,64 fte)
Dick van Popering
Guido van Muyen (inhuur 1,0 fte)
flexibele schil
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
200 840 110 70
200 840 110 65 4
200 840 110 65
50
8 10 14 50
8 10 14 50
20 16 10 52 50
1128 -118
1302 -98
1301 -99
1363 -37
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
32 200 100 100 12 25 200 50 12 50 3 10 275 160 112 60 135 280 30 180
32 70 450 32 100 125 150 6
2026 626
1947 547
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Peter van Rooijen (0,89 fte)
0
Arjen van Vliet (0,89 fte)
60 974
Richard de Kok (0,83 fte)
Edwin Korving
Carine Sirre
inhuur flexibele schil (fixed fee)
Totaal kosten en uren Totaal extra benodigde capaciteit in 2021 in fte (tov 31 december 2020)
Jacques Markus (1,0 fte
Constructie toetsing bouwwerktype A toetsing bouwwerktype B toetsing bouwwerktype C toetsing bouwwerktype D toetsing bouwwerktype E toetsing bouwwerktype F toetsing bouwwerktype G toetsing bouwwerktype H toetsing bouwwerktype I toetsing bouwwerktype J toetsing bouwwerktype K toetsing bouwwerktype L toetsing excessen toetsing ontvankelijkheid heibespreking / 1e paal / heistaten etc advies derden COBc- en NEN-commissie geotechniek deelname in projectgroepen (in uren) overige ondersteuning binnen het team bedrijfsvoering (indirect productief)
Secretariaat (1,97 fte) Juridisch adviseur (3,64 fte)
Eyvaz Isik (1,0 fte)
Totaal kosten en uren Totaal extra benodigde capaciteit in 2021 in fte (tov 31 december 2020)
woninginspecteur (6,0 fte)
50 100 170 40 4 5 45 260 20
50 100
100 200
230 4 5 45 270 20 10 100 50 200 5
230 4
6.723.100 200 400 170 500 12 10 90 800 40 10 200 65 320 5 10 0 100 60 250 3242
345 339 212 480 13 4 47 826 51 2 183 27 267 10 10 0 37 57 251 3161 81
2.851
60 85 0 0 60 36 0,0 0,0 20,0 15,0 210,0 486
52 32 52 0 31 45 0 0 20 16 510 758 -272
21.990
3728 -191
3919 -86 -0,06
20 21 22 23 24 25 116 118
1 0 1 2 1
41 177 216 1 3 3 1 123 142 232 210
60 164 43 1 17 6 1 75 62 22 391
57 183 0 1 13 8 1 0 0 16 464
60 170 0 0 15 6 0 0 20 15 210
1 0,5 2 20 4 6 0 1 1 1 1
waarvan lage prioriteit Wabo regie omgevingsvergunning (uitgebreide procedure) omgevingsvergunning (reguliere procedure) conceptadvies (incl. vooroverleg) afhandelen sloopmelding afhandelen melding brandveilig gebruik adviseren algemeen (plantoetsing, informatie, vergunningvrij) planologisch overleg (in uren) bouwberaad (in uren) deelname projectgroep (in uren) bedrijfsvoering (indirect productief)
Ricardo de Wolff
0,5 1 2 2 12 10 30 20 20 10 8 1 16 5 10 10 100 30 250
beschikbare uren op 1 januari 2021 (zoals geschreven in 2020)
241.646
400 400 85 250 1 1 3 40 2 1 25 65 20 1 1 0 1 2 1
prognose uren 2021
31.328
(gemiddelde) normuren per product(groep) *
117 88 1.232
aantal producten geprognosticeerd in 2021*
1.289 967 13.537
realisatie aantal producten 2020
352 499 352 211 -
realisatie aantal producten 2019
3.868 5.479 3.868 2.321 -
realisatie aantal producten 2018
19.139
610 338 335 440 82 82 290 252 0 0 1 1 3 5 32 45 1 2 1 1 24 27 65 peter 20 23 1 1 1 0 0 1 1 4 2 1 1
bouwinspecteur (3,0 fte)
Johan Moerkerken (1,0 fte)
Totaal kosten en uren Totaal extra benodigde capaciteit in 2021 in fte (tov 31 december 2020)
210.319
533 444 102 233 2 1 3 50 4 1 21 67 9
Constructeur (2,0 fte)
Chera Amma (0,89 fte)
subtotaal kosten en uren extra benodigde capaciteit (in uren)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Wabo-regisseur (4,49 fte) inhuur flexibele schil (fixed fee)
advisering over archeologie (overig) advisering over asbest (sloopmeldingen) project asbestdaken afhandelen meldingen Besluit lozen buiten inrichtingen afhandelen meldingen AMvB bodemernergie migratie Squit naar iBis deelname in projectgroepen (in uren) opstellen verordeningen/beleidsregels overige ondersteuning binnen het team bedrijfsvoering (indirect productief)
1.173 2.346 997 2.933 70 59 528 4.693 235 59 1.173 381 1.877 29 59 663 352 1.512
Adviseur bodem (2,61 fte)
Sjaak Edelschaap (0,6 fte)
Bodem (overig) advisering over archeologie (omgevingsvergunningen)
12.892 25.784 10.958 32.230 774 645 5.801 51.568 2.578 645 12.892 4.190 20.627 322 645 7.283 3.868 16.617
Algemeen (3,0 fte)
Inhuur flexibele schil (DCMR)
subtotaal kosten en uren extra benodigde capaciteit (in uren)
nummer template tijdschrijven
Bodem verstrekken informatie aan makelaars/notarissen verstrekken informatie aan derden adviseren over de bodemkwaliteit (omgevingsvergunning) adviseren over de bodemkwaliteit (overig) opstellen bodemparagraaf in omgevingsplannen uitvoeren nazorg (monitoringsprogramma) begeleiden bodemonderzoek en -sanering (ambtshalve) begeleiden bodemonderzoek en -sanering (gemeente) begeleiden bodemonderzoek en -sanering (derden) zorgplicht Wet bodembescherming melding Besluit uniforme saneringen toetsen rapportages (geen beschikking) beschikking Wet bodembescherming melding Besluit bodemkwaliteit (excl. toetsing) toezicht bodemregelgeving verlenen & vaststellen financiële bijdragen open data (digitalisatie bodemarchief) onderzoek naar niet gesprongen explosieven overig (bodemoverleg, workshop, etc)
FCL en kapitaallasten (excl. overhead)
Productomschrijving
opslag overhead
*) obv ervaring periode 2018-2020
40
-0,03
763 4560 330 200 4 20 110 30 80,0 250,0
309 5617 302 34 4 16 105 14 72 24
6347 -150
6497 -439 -0,11
64 270 550 132 112 150 350 56 12 175 3 25 550 320 224 120 135 300,0 65,0 360,0
132 310 450 206 120 225 235 60 23 350 3 42 9 320 224 92 135 315 60 330
3973 332
3641 1173 0,84
64
-0,05
15 120
270
100
10 100
0
0
60 160
60 889
60 70 1219
60 85
60 36
0
0
0
20 15 70 105
0
0
160 160
994 -168
70 311
70 70
1530 284
1044 -202
6.822.200 49.183 253.758 21.272 12.892 258 1.289 6.471 1.934
4.476 23.092 1.936 1.173 23 117 589 176
347.056
31.582
27 28 29 30 31 32 33 34 116
12 416 65 230 2 9 119 74 75 66
17 381 52 198 0 16 111 57 111 13
12 359 53 45 2 1 105 14 72 24
14 380 55 100 2 5 110 30 80 250
54,5 12 6 2 2 4 1 1 1 1
163 540
1000
78
50
0
0
0
0
0
0
0
753 -87
0
6.822.200 4.125 17.404 35.453 8.509 7.220 9.669 22.561 3.610 774 11.281 193 1.612 35.453 20.627 14.439 7.735 8.702
209.366
375 1.584 3.226 774 657 880 2.053 328 70 1.027 18 147 3.226 1.877 1.314 704 792
19.052
waarvan lage prioriteit
\\Schiedam.local\Users\Users1\GRIF\NMEngelchor\ReDir\Desktop\bijlage 3 Inzet capaciteit team V&H 2021
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 35 116
25 80 64 24 14 72 10 21 2 11 1 13 77 77 35 28
29 92 47 13 19 24 7 22 0 29 1 16 45 63 22 19 140 152 304 196
448
34 86 48 20 14 13 11 12 2 38 0 3 52 91 11 18 135 325 27
32 90 50 22 16 15 10 14 2 35 1 5 50 80 14 20 135 300 65 360
1316
2 3 11 6 7 10 35 4 6 5 3 5 11 4 16 6 1 1 1 1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
125 15 275 160 112 60 20 35 180
0
Pagina 1 van 4
Anita Gijsbertsen (0,67 fte)
Clifford Menick (1,00 fte)
Jolanda Dekkers (0,3 fte tot 1 juli 2021)
vacature (1,0 fte)
inhuur DCMR (0,64 fte)
Dick van Popering
Guido van Muyen (inhuur 1,0 fte)
flexibele schil
1539 139
inhuur (Jasvant 1,0 fte)
1539 139
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
704
896 237 119 160
237 118 320 100 40 250 50 16 16 32 180
inhuur (Yusuf 1,0 fte)
1539 139
vacature (1,0 fte)
4 102 190 622 14 18 130 3 12 5 179 64 32 18 3 14 0 80 0 0 49
Dorethy Hiwat (1,0 fte)
Arnold Fillekes
4 102 190 622 14 18 131 0 12 6 178 64 32 18 3 14 3 80 0 0 48
Martin Smit (1,0 fte)
Robin Poutsma
3 4 103 190 621 14 18 130 0 12 5 178 65 31 19 4 14 0 80 0 0 48
Soeresh Mohanlal (1,0 fte)
Roy Lakhpat
Jaap van Mannekes
Kevin Kleijberg
inhuur flexibele schil (fixed fee)
Jacques Markus (1,0 fte
Eyvaz Isik (1,0 fte)
Johan Moerkerken (1,0 fte)
Chera Amma (0,89 fte)
inhuur flexibele schil (fixed fee)
Sjaak Edelschaap (0,6 fte)
2 11 305 568 1864 32 53 391 3 35 15 537 193 95 55 10 42 3 254 0 0 146
Inhuur flexibele schil (DCMR)
3 12 450 360 1320 60 72 330 3 36 56 210 32 120 10 48 180 45 240 0 25 175
Peter van Rooijen (0,89 fte)
beschikbare uren op 1 januari 2021 (zoals geschreven in 2020)
3 4 3 4 6 4 3 6 3 3 4 6 4 6 5 8 3 3 6 1 1 1
Arjen van Vliet (0,89 fte)
prognose uren 2021
1 3 150 90 220 15 24 55 1,0 12,0 14,0 35 8 20 2,0 6 60 15 40 0 25 175
Richard de Kok (0,83 fte)
(gemiddelde) normuren per product(groep) *
0 2 124 77 180 13 19 45 0 9 10 26 7 14 0 2 41 0 39 0 0 146
Edwin Korving
aantal producten geprognosticeerd in 2021*
11 17 216 163 313 17 40 74 1 26 16 208 1 42 8 4 144 0 42 1 38 257
Carine Sirre
realisatie aantal producten 2020
2 5 36 70 230 12 41 36 0 0 35 135 0 80 48 0 120 0 204
Ricardo de Wolff
realisatie aantal producten 2019
nummer template tijdschrijven
opslag overhead
realisatie aantal producten 2018
Bouwtoezicht
FCL en kapitaallasten (excl. overhead)
Productomschrijving
0
0
0
0
0
140
130 180 40 32 60 12
120 180 20 32 60 12
120 180 40 32 60 10
120 180 20
120 180 20
60 10
60 10
16
16
16
16
17 487
17 457
17 475
17 423
16 75 17 498
60 276 30 40 48 50
60 276 20 40 48 50
60 276 20 40 48 50
60 276 20 40 48 50
60 276 20 40 48 50
180 50
180 50
180 50
180 50
180 50
734
724
724
724
724
8 40
8 30
8 30
8 30
8 30
5 20
5 20 36 30 6 10 145
5 20 30 6 10 109
5 20 36 30 8 10 147
30 6 10 104
1326 -74
1308 -92
1294 -106
1326 -74
6.822.100
toezicht uitgesplitst per type bouwwerk
categorie Wonen Ia categorie Wonen Ib (< €100.000 eenvoudig) categorie Wonen Ic (< €100.000 complex) categorie Wonen II (€100.000- €1.000.000) categorie Wonen III (> €1.000.000) categorie Bedrijf I (< €100.000) categorie Bedrijf II: (€100.000 - €1.000.000) categorie Bedrijf III (> €1.000.000) categorie Integraal II/III categorie Publiek I (< € 100.000) categorie Publiek II (€ 100.000 - € 1.000.000) categorie Publiek III (> € 1.000.000) categorie Overig (bouwwerken geen gebouw zijnde) sloopwerken toezicht op wijzigingen/restauratie monumenten oproep calamiteit / wachtdienst toezicht APV (evenementen etc) overig toezicht (kap, handelsreclame, uitweg etc) handhaving (afwijking verguning, illegale bouw ed) (15%) deelname in projectgroepen (in uren) overige ondersteuning binnen het team bedrijfsvoering (indirect productief)
Totalen Bouwtoezicht (kosten en uren) Totaal extra benodigde capaciteit in 2021 in fte (tov 31 december 2020)
153 612 15.645 29.047 95.040 2.140 2.752 19.925 153 1.835 815 27.264 9.835 4.841 2.803 510 2.140 153 12.230
14 56 1.424 2.643 8.649 195 250 1.813 14 167 74 2.481 895 441 255 46 195 14 1.113
227.893
20.738
52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 116
waarvan lage prioriteit Niet uitgevoerde controles (hoog geprioriteerd)
Woningtoezicht en -onderzoek intake en afhandelen eenvoudige meldingen (geen dossier Squit) Initiële controle / bouwkundige inspecties en opstellen constateringsrapport vooraankondigen last onder dwangsom aanschrijven last onder dwangsom bestuurlijke controlere sanctioneren en verbeuren uitvoering van gemeentewege oproep calamiteit / wachtdienst deelname projectgroepen (Holsteiner - Spaanse polder) bedrijfsvoering (indirect productieve uren)
totalen kosten en uren extra benodigde capaciteit (in uren) in fte Overbewoning intake en afhandelen eenvoudige meldingen intiële controle en opstellen constateringsrapport (20% legesdekkend) adviseren omgevingsvergunningen verlenen vergunning Huisvestingswet initiële controle vergunning Huisvestingswet vooraankondigen last onder dwangsom aanschrijven last onder dwangsom bestuurlijke controlere ondersteunen interventieteam sanctioneren en verbeuren
totalen in kosten en uren extra benodigde capaciteit (in uren) in fte (* intensivering ivm nieuwe Verordening huisvesting) Particuliere woningverbetering overleg (in uren) bouwkundige inspectie (controles en rapportages) dossiers nog niet in behandeling/on hold (zie priolijst) dossiers nog bij servicepunt (zie Priolijst) dossiers reeds in behandeling (zie Priolijst) minnelijk overleg (ook vanuit het oude servicepunt)
vooraankondigen (last onder dwangsom) (doorstroom ingeschat op 25%) aanschrijven (last onder dwangsom) bestuurlijke controleren sanctioneren en verbeuren uitvoering van gemeentewege
totalen in kosten en uren extra benodigde capaciteit (in uren) in fte
Totaal Woningtoezicht (uren en kosten) Totaal extra benodigde capaciteit (in uren) in fte (tov 31 december 2020) Juridische ondersteuning project Huisman (in uren)
project Schiehart (in uren) controle omgevingsvergunning (15% van de vergunningen) adviseren (overige) vergunningtrajecten (met name huisvesting en kap) advisering handhavingstraject (verzoeken om handhaving) coördinatie toezicht/handhaving (in uren) opleggen bestuurlijke boete (programma woonvisie) voornemen last onder dwangsom (verzoeken om handhaving/eigen constatering) opstellen besluit last onder dwangsom (10% doorstroom) voornemen last onder bestuursdwang (1% doorstroom) opstellen besluit last onder bestuursdwang (1% doorstroom) stilleggingen/(spoedeisende) bestuursdwang (10% doorstroom) afhandelen zienswijze/bezwaar/beroep afhandelen schadeclaim
20%
3787 -827
4614 417 -0,29
60 424
-0,04
750 900 160 96 360 64 32 96 150 100 2708
1245 1601 153 104 0 0 0 2 3 43 3151 -443 -0,32
350 1650 140 480 240 320 64 1080 300 64 4688
1536 0 0 1449 312 116 59 1080 300 0 4852 -164 -0,12
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0,30
6.822.000 38.997 45.864 8.265 4.892 18.679 3.317 1.808 4.981
3.549 4.174 752 445 1.700 302 165 453
71 72 73 74 75 76 77 67 116
1003 146 14 5
1 103 23 2
400 210 3 1 70 2 1
50 126.803
750 180 10 3 60 2 1 12 150 100
1 5 16 32 6 32 32 8 1 1
11.539
20
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
60 10 32 16 75 15 368
6.820.702 18.114 85.583 7.301 26.015 12.230 16.696 3.617 56.036 15.566 3.617
1.648 7.788 664 2.367 1.113 1.519 329 5.099 1.416 329
151.441
13.781
78 79a 80 81 82 83a 83b 79b 79c 84
19 137
24 152
60 54 19 8
53 53 11 1
344 275 34 134 134 17 1 126 2
350 275 35 60 60 20 2 180 300 2
1 6 4 8 4 16 32 6 1 32
50 270 30 280
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
70 64 180 50 64 1058
6.822.400 40 20
1 8
40 160
10 60
0
32
0
0
0
32
0
0
32
0
0
20 5 2 25 1 1
1 20 36 6 32 50
2.894
20 100 72 150 32 50 624
5 0 0 26 0 4 105 519 0,37
28.214
8020 -88
8108 -380 -0,27
1600 0 474 237 640 100 80 540 160 32 32 32 360 18
1650 0 125 250 115 100 80 100 28 6 62 17 960 43
2.038 8.154 1.019 5.096 3.669 7.644 1.631 2.548
185 742 93 464 334 696 148 232
31.799
310.043
85 86
87 88a 88b 89 90 91
265 189
39 8
9 6
151 37 1 0
23 1 0 1
4 1 0 1
1
3
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
30 6 10 119
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1426 26
1340 -60
20
verdeelsleutel 110.636 30.554 15.277 41.254 6.446 5.157 34.808 10.314 2.063 2.063 2.063 23.206 1.160
10.068 2.780 1.390 3.754 587 469 3.168 939 188 188 188 2.112 106
\\Schiedam.local\Users\Users1\GRIF\NMEngelchor\ReDir\Desktop\bijlage 3 Inzet capaciteit team V&H 2021
92 93 94 95 96 97 98 99 100 101 102 103 104 105
643 265
60 252 93 31 5 5 41 0
1117 1 57 95 147 378 0 30 1 6 1 1 13 0
1650 0 56 135 309 100 0 21 2 2 1 1 21 0
1500 0 474 474 20 100 10 45 5 2 1 1 20 1
1 1 1 0,5 32 1 8 12 32 16 32 32 18 18
160
145 50
40 145 60 16 16 180 18
Pagina 2 van 4
Totaal juridisch (uren en kosten) Totaal extra benodigde capaciteit (in uren) in fte
69
150
5043 528
4515 -108 0,30
0 0
0 0
0
0
50
96 100 16 25 5
200 16 25 5
flexibele schil
Guido van Muyen (inhuur 1,0 fte)
100
Dick van Popering
inhuur DCMR (0,64 fte)
vacature (1,0 fte)
Jolanda Dekkers (0,3 fte tot 1 juli 2021)
Clifford Menick (1,00 fte)
Anita Gijsbertsen (0,67 fte)
inhuur (Jasvant 1,0 fte)
inhuur (Yusuf 1,0 fte)
vacature (1,0 fte)
Dorethy Hiwat (1,0 fte)
Martin Smit (1,0 fte)
Soeresh Mohanlal (1,0 fte)
Arnold Fillekes
Robin Poutsma
Roy Lakhpat
Jaap van Mannekes
Kevin Kleijberg
inhuur flexibele schil (fixed fee)
Jacques Markus (1,0 fte
Eyvaz Isik (1,0 fte)
Johan Moerkerken (1,0 fte)
Chera Amma (0,89 fte)
inhuur flexibele schil (fixed fee)
Sjaak Edelschaap (0,6 fte)
120 480 67 42 7 194 69
Inhuur flexibele schil (DCMR)
96 400 32 50 10 0 150
Peter van Rooijen (0,89 fte)
8 8 16 1 1 1 1
Arjen van Vliet (0,89 fte)
12 50 2 50 10
Richard de Kok (0,83 fte)
beschikbare uren op 1 januari 2021 (zoals geschreven in 2020)
8 60 2 42 7
Edwin Korving
prognose uren 2021
11 30 2 97 10 10 140
Carine Sirre
(gemiddelde) normuren per product(groep) *
22 21 2 143
Ricardo de Wolff
aantal producten geprognosticeerd in 2021*
29.325
realisatie aantal producten 2020
322.258
106 107 108 109 116
realisatie aantal producten 2019
563 2.346 188 293
realisatie aantal producten 2018
6.188 25.784 2.063 3.223
nummer template tijdschrijven
opslag overhead
verlenen ontheffing geluidhinder (APV en bouw) advieseren overige projecten afhandelen Wob verzoek dossierbeheer deelname in projectgroepen (in uren) overige ondersteuning binnen het team bedrijfsvoering (indirect productief)
FCL en kapitaallasten (excl. overhead)
Productomschrijving
50
50
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1209 -191
896 0
1283 -117
1600 200
0 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
479
0
0
6.822.300
Welstand commissie kaderstellend beleid welstand en monumenten
50.000 -
4.550 -
4.550
Totaal Welstand
50.000
Administratieve ondersteuning bodemadviseurs Wabo regisseurs
verdeelsleutel 4.076 69.579
371 6.332
waarvan direct samenhangend met de vergunningverlening
42.851 31.597 7.719 4.653 5.952
3.899 2.875 702 423 542
123.576
11.245
constructeurs bouwinspecteurs (uitgaan van gemiddeld 3 controles per dossier) woninginspecteurs (uitgaan van gemiddeld 2 controles per dossier) juristen overige ondersteuning binnen het team bedrijfsvoering (indirect productief)
Totaal ondersteuning (in kosten en uren) Totaal extra benodigde capaciteit (in uren) in fte
1 1
119
1 1
110 111 112 113 114 115
1 1
0 0
45 551
2,5 3,5
113 1929
34 2965
750
113 700
396
3
1188
1452
400
350
438
292 214 257 47 0 100
3 1 0,5 3,5 1 1
876 214 129 165 0 100
0 35 192 325 48 229
476 107
300 107 129 82
100
3524 -304
3828 768 0,55
83
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
14
14
52
0
0
0
0
0
0
0
0
0
0
14
14
0
270
0
0
0
0
0
0
0
0
0
0
850
0
0
0
0
0
0
0
0
5 0 88
105 320 195 400 200 120
0
0
0
0
0
0
0
0
280
20
52
0
280
20
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
25
50
50
1466 528
1481 81
579 159
0
0
0
5
5
75
0
0
0
0
0
5
5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
25
25
25
25
25
25
25
25
25
25
25
25
5 8 134 72 16
5 8 200 72 16
5 8 60
2 4 100 36 8
25
260
326
98
175
25
326
25
0
0
0
0
0
0
75
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
25 100
25 100
25 100
25
6.822.200
Projecten
deelname projectgroep
33.200
3.021
Totaal bijzondere projecten
33.200
3.021
Totaal Milieu
1
1
1
540
540,0
540
540
540
75
75
19.664
1.789
19.664
1.789
117
1
1
1
1
270
270,0
255
270
255
270
6.140.000
Beleid opstellen verordeningen/beleidsregels
61.906
5.633
Totaal Milieu
61.906
5.633
Bedrijfsvoering (indirect productief) financiën inkoop & contractbeheer planning & control (programma's / capaciteit / marap / WKB) kwaliteitszorg / basis op orde / E-waarmerken implementatie omgevingswet/Wet private kwaliteitsborging leges (bezwaren / aansluiting / rechtmatigheid / kostendekking) invoer- en controle data Squit XO registraties in Neuron, GVOP of het LGR onderhoud en implementatie werkprocessen in Squit onderhoud website invoeren digitaal gestuurd werken adviseren bestuur / opstellen adviesnota OR uitvoeren accounthouderschap DCMR overige ondersteuening binnen het team opstellen verordeningen/beleidsregels
verdeelsleutel 8.011 23.306 20.611 29.132 18.208 10.196 10.925 728 7.283 11.289 -
Totaal (uren en kosten) Totaal extra benodigde capaciteit (in uren) in fte
139.688
729 2.121 1.876 2.651 1.657 928 994 66 663 1.027 -
118
120 121 122 123 124 125 126 127 128 129 130 131 132
1
1
1
197 283 300 42 0 142 50 0 137 76 283 25 0 268
107 412 385 61 200 125 0 0 250 20 145 20 0 305
115 420 283 392 171 145 0 0 50 2 132 33 0 270
955
909
950
1
110 320 283 400 250 140 0 0 150 10 100 155 0 300 160 800
2963
12.712
850
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
850,0
850
850
850
110,0 320,0 283,0 400,0 250,0 140,0 0,0 0,0 150,0 10,0 100,0 155,0 0,0 300,0 160,0 800,0
115 420 283 392 171 145 0 0 50 10 132 33 0 270 160 850
3178,0 147,0
3031 398 0,28
850
50 20
150 10 100 155 270 160 850
0 0
1448 48
1750 350
0
0
0
1700 50
100
25
25
25
25
25 50
25
25
25
25 30
5 8 166 72 16
5 8 178 72 16
5 8 178 72 16
5 8 120 72 16
5 8 178 72 16
5 8 200 72 16
5 8 200 72 16
5 8 200 72 16
5 8 200 72 16
20 5 8 200 72 16
5 8 200 72 16
5 8 200 72 16
5 8 200 72 16
5 8 200 72 16
5 8 200 72 16
5 8 200 72 16
5 8 200 72 16
354
326
326
326
0
356
346
426
426
426
326
326
326
326
\\Schiedam.local\Users\Users1\GRIF\NMEngelchor\ReDir\Desktop\bijlage 3 Inzet capaciteit team V&H 2021
Soeresh Mohanlal (1,0 fte)
Martin Smit (1,0 fte)
Dorethy Hiwat (1,0 fte)
vacature (1,0 fte)
inhuur (Yusuf 1,0 fte)
inhuur (Jasvant 1,0 fte)
Anita Gijsbertsen (0,67 fte)
Clifford Menick (1,00 fte)
Jolanda Dekkers (0,3 fte tot 1 juli 2021)
vacature (1,0 fte)
inhuur DCMR (0,64 fte)
Dick van Popering
Guido van Muyen (inhuur 1,0 fte)
flexibele schil
0 0 0 0
Arnold Fillekes
0 0 0 0
Robin Poutsma
0 0 0 0
Roy Lakhpat
0 0 0 0
Jaap van Mannekes
0 0 0 0
0
Kevin Kleijberg
0 0 0 0
246
inhuur flexibele schil (fixed fee)
0
Jacques Markus (1,0 fte
304
Eyvaz Isik (1,0 fte)
304
Johan Moerkerken (1,0 fte)
5847 3973 540 624
292
Chera Amma (0,89 fte)
43.904 26.486 4.200 4.023
441
inhuur flexibele schil (fixed fee)
526.362 317.535 50.352 48.228
441
Sjaak Edelschaap (0,6 fte)
0,23 0,14 0,02 0,02
2155
25
5 8 200 72 16
Inhuur flexibele schil (DCMR)
10084
Peter van Rooijen (0,89 fte)
10084
Arjen van Vliet (0,89 fte)
9763
40 5 8 200 72 16
Richard de Kok (0,83 fte)
9913
120 5 8 200 72
100 20 20 5 8 200 72 16
Edwin Korving
0 1700 900 400 200 122 196 4514 1692 360
Carine Sirre
31.582 19.052 3.021 2.894
0 1700 900 400 200 122 196 4514 1692 360
beschikbare uren op 1 januari 2021 (zoals geschreven in 2020)
doorbelasting overhead (in euro) 347.056 209.366 33.200 31.799
24 2030 997 379 263 31 237 3025 2297 480
waarvan overhead per fcl (in euro)
-
0 1445 989,5 641,5 444,5 63,5 960 3563 1370 436
doorbelasting per fcl (in euro)
-
133 134 135 136 137 138 139 140 141 142
verdeelsleutel (niet legesgerelateerd werk)
-
doorbelasting uren (in euro)
totalen
-
Ricardo de Wolff
verdeelsleutel
Algemeen (improductief) secretariaat management overleggen opleiding en scholing personeelsaangelegenheden medisch bezoek medisch verlof vakantieverlof incl. (ver)koop buitengewoon verlof overig (urenlijsten (niet ingevuld), ruimen, gebiedstoezicht)
Wabo-regie (fcl 6.822.200) Constructie (fcl 6.822.200) Projecten (fcl 6.822.200) Particuliere woningverbetering (fcl 6.822.400)
1
6.723.200
Milieu uitvoeren accounthouderschap DCMR
totaal overzicht team Vergunning
116
0 0 0 0
753 0 0 0
0 0 0 0
1128 0 0 0
1302 0 14 0
1301 0 14 0
1363 0 52 0
0 0 0 0
0 2026 280 0
0 1947 20 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 75 0
0 0 0 119
0 0 0 145
0 0 0 109
0 0 0 147
0 0 75 104
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 5 0
0 0 5 0
0 0 0 0
Pagina 3 van 4
Chera Amma (0,89 fte)
Johan Moerkerken (1,0 fte)
Eyvaz Isik (1,0 fte)
Jacques Markus (1,0 fte
inhuur flexibele schil (fixed fee)
Kevin Kleijberg
Jaap van Mannekes
Roy Lakhpat
Robin Poutsma
Arnold Fillekes
Soeresh Mohanlal (1,0 fte)
Martin Smit (1,0 fte)
Dorethy Hiwat (1,0 fte)
vacature (1,0 fte)
inhuur (Yusuf 1,0 fte)
inhuur (Jasvant 1,0 fte)
Anita Gijsbertsen (0,67 fte)
Clifford Menick (1,00 fte)
Jolanda Dekkers (0,3 fte tot 1 juli 2021)
vacature (1,0 fte)
inhuur DCMR (0,64 fte)
Dick van Popering
Guido van Muyen (inhuur 1,0 fte)
flexibele schil
189.853
inhuur flexibele schil (fixed fee)
2.276.147
Sjaak Edelschaap (0,6 fte)
1,0
Inhuur flexibele schil (DCMR)
7.831
Peter van Rooijen (0,89 fte)
93.889
Arjen van Vliet (0,89 fte)
0,04
Richard de Kok (0,83 fte)
16.041 19.158 30.569 2.488 28.829 6.325
Edwin Korving
192.315 229.683 366.493 29.824 345.634 75.832
Carine Sirre
0,08 0,10 0,16 0,01 0,15 0,03
Ricardo de Wolff
prognose uren 2021
(gemiddelde) normuren per product(groep) *
aantal producten geprognosticeerd in 2021*
realisatie aantal producten 2020
realisatie aantal producten 2019
realisatie aantal producten 2018
11.539 13.781 21.990 1.789 20.738 4.550 29.325 11.245 5.633 12.712 189.853
nummer template tijdschrijven
126.803 151.441 241.646 19.664 227.893 50.000 322.258 123.576 61.906 139.688 2.086.294
beschikbare uren op 1 januari 2021 (zoals geschreven in 2020)
totalen
opslag overhead
Woningtoezicht en onderzoek (fcl 6.822.000) Overbewoning (fcl 6.820.702) Bodem (fcl 6.723.100) Milieu (fcl 6.723.200) Bouwtoezicht (fcl 6.822.100) Welstand (fcl 6.822.300) Juridische ondersteuning (verdeelsleutel) Administratieve ondersteuning (verdeelsleutel) Beleid (fcl 6.140.000) Bedrijfsvoering indirect productief (verdeelsleutel)
FCL en kapitaallasten (excl. overhead)
Productomschrijving
2708 4688 3728 270 4617 0 4988 3526 850 1918
0 0 0 0 0 0 0 0 0 0
0 0 0 270 0 0 0 0 850 328
0 0 160 0 0 0 0 0 0 1590
0 0 994 0 0 0 0 0 0 0
0 0 1530 0 0 0 0 0 0 0
0 0 1044 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 1539 0 0 0 0 0
0 0 0 0 1539 0 0 0 0 0
0 0 0 0 1539 0 0 0 0 0
368 1058 0 0 0 0 0 0 0 0
487 734 0 0 0 0 0 0 0 0
457 724 0 0 0 0 0 0 0 0
475 724 0 0 0 0 0 0 0 0
423 724 0 0 0 0 0 0 0 0
498 724 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 1466 0 0
0 0 0 0 0 0 0 1481 0 0
0 0 0 0 0 0 0 579 0 0
0 0 0 0 0 0 1209 0 0 0
0 0 0 0 0 0 896 0 0 0
0 0 0 0 0 0 1283 0 0 0
0 0 0 0 0 0 1600 0 0 0
0 0 0 0 0 0 0 0 0 0
38277
0
1448
1750
994
1530
1044
0
753
0
1128
1316
1315
1415
0
2306
1967
1539
1539
1539
1501
1340
1326
1308
1294
1401
1466
1481
579
1209
896
1288
1605
0
Legenda: oranje = lage prioriteit; bruin = middelhoge prioriteit; rood = hoge prioriteit
risico's continuering bedrijfsvoering in 2021 (in fte) Vakdisciplines
vaste formatie in 2021
inhuur in 2021
Vacature uitstaan op 1 januari 2021
prioritering (lage prioriteit)
extra benodigde capaciteit obv bestuurlijke programma 2021 voorstellen
totaal benodigd invulling flexibele schil (via de exploitatie beschikbaar) in
Bodem Wabo-regie Constructie Bouwtoezicht Woningtoezicht Juridische ondersteuning Administratieve ondersteuning Management en bedrijfsvoering
2,61 4,49 2,00 3,00 3,00 1,00 1,97 3,00
0,00 0,00 0,00 0,00 2,00 1,00 0,00 0,00
0,00 0,00 0,00 0,00 1,00 1,00 0,00 0,00
-0,03 0,00 -0,05 0,26 0,00 0,00 0,00 0,00
-0,06 -0,11 0,84 -0,29 -0,27 0,30 0,55 0,28
0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
2,52 4,38 2,79 2,97 5,73 3,30 2,52 3,28
0,00 0,00 0,79 0,00 0,00 0,00 0,00 0,00
Totaal
21,07
3,00
2,00
0,19
1,24
0,00
27,49
0,79
\\Schiedam.local\Users\Users1\GRIF\NMEngelchor\ReDir\Desktop\bijlage 3 Inzet capaciteit team V&H 2021
voorstellen voor 2021
geen flexibele schil inzetten voor piekbelastingen 0,79 fte flexibele schil structureel inzetten taken verschuiven vanuit woningtoezicht PWV alleen uitvoeren bij lage piekbelasting 0,8 fte inhuren op het dossier Huisman. 0,6 fte is structureel gemaakt via de zomernota 2020 vervanging 0,6 fte administratief medewerker geen
Pagina 4 van 4