[23bb001496] Bijlage 1 behorende bij 23bb001495 over Expression of Interest
Tekst van het document
Lack of enabling transport policy at EU level
High initial capital costs
Spatial dispersion or uneven accessibility
Lack of cross-modal ticketing and payment systems
People’s time and economic constraints in the use
(to encourage modal shift)
of public transport
Insufficient flexibility in changing urban forms and
Infrastructural and planning barriers to active travel
functions (to reduce trip lengths)
(lack of side walks, cycling lanes, etc.)
Insufficient ICT access in remote areas (to reduce
Psychosocial barriers to active travel (risk of
the need to travel)
collision and injury and/or exposure to crime and verbal offense)
Inefficient or non-existent time-variable road pricing
Psychosocial barriers to public transport use (risk of transmission of infections, exposure to crime and verbal offense)
Insufficient technological availability
Psychosocial barriers to automated transport systems (such as driverless shuttles)
Lack of effective and sustainable transport policy at
Site specific constraints
local level National tax regimes that incentivise car ownership
Other
/use Lack of enabling transport policy at Member State level
What barriers/gaps/assistance needs specific to the waste/wastewater management sector does your city expect to encounter when pursuing climate neutrality by 2030? at most 4 choice(s) Definition Downcycling = recycling waste into products of inferior quality and reduced functionality See https://www.europarl.europa.eu/RegData/etudes/BRIE/2015/559493/EPRS_BRI(2015)559493_EN.pdf Insufficient waste separation and quality of
Difficult balancing between promoting recycling and
separated waste
protecting consumers against harmful chemical substances in recycled materials
Inefficient recycling processes
Slow behavioural transformation, including cultural barriers
Insufficient data collection
Limited community engagement and support
Inefficient energy recovery of waste
Spread of illegal practices in shipping, dumping or burning waste
Ineffective waste prevention
Lack of infrastructure for circular economy measures
63
Lack of effective and sustainable waste
Weaker norms outside the EU which incentivise
management policy at local level
waste export
Lack of enabling waste policy at Member State level
Downcycling
Lack of enabling waste policy at EU level
Other
Self-assessment Please rate how much your city relates to the following statements on a scale from 1 to 5, where 1 is "cannot relate" and 5 is "very much relates". 1
2
3
4
5
The city can rely on a growing, young and above-average educated and skilled population The city can rely on favourable economic conditions such as high salaries/tax revenues The city can rely on a supportive local research environment The city can rely on a fast authorisation process The city can rely on a fast funding/financing process The city can rely on a consolidated communication platform with proven success in disseminating climate awareness The city can rely on its own funding schemes and moderately resorts to external funding for its climate policies The city can rely on favourable geo-climatic conditions (e.g., proximity to water bodies, moderate occurrence of climate extremes) The city cannot rely on any of the above favourable conditions, but major obstacles to climate neutrality are not expected The city cannot rely on any of the above favourable conditions, but this is what makes its pathway to climate neutrality a textbook example for many other similar cities to follow The city cannot rely on any of the above favourable conditions, but recent R&I solutions offer the potential to enable at least one of them.
The city cannot rely on any of the above favourable conditions, but this is the ‘right moment’ (‘policy window’) to place and prioritise the topic of urban climate neutrality on the agenda The city cannot rely on any of the above favourable conditions, but it has a history of coping with it by pioneering climate policies and by looking for alternative creative approaches (e.g., collaborations /networking access to crucial knowledge, participation in exploratory studies)
64
The city cannot rely on any of the above favourable conditions, but it has already secured enough internal and external funding/financing for climate related projects to become a climate neutrality pioneer
Please elaborate on any of the statements in the previous table whose declared rating is either "1" or "5" 1500 character(s) maximum For instance, if the answer to the statement “The city can rely on a growing, young and above-average educated and skilled population” is "5", we invite you to provide additional explanations on the specific situation of your city. The city of Rotterdam is extremely vulnerable to climate change, due to its location in a delta. At the same time, the population has one of the lowest average incomes in The Netherlands and vulerable to economic change. We are confident that we can turn these unfavourable conditions into opportunities to benifit all and be an example for other cities. Especially with also a large industry situated within our borders, we can demonstrate to cities in similair conditions how to combine the transitions in city and port, on an mutual integral way,that strengthen our cities. For example, the current and expected supply of residual heat is sufficient to deliver enough heat for all of our homes, therby saving the scarces renewable electricity for other functions. Our track record proves we can be a frontrunner in making the impossible, possible on new innovative ways. We are confident that if the energy transition doesn't succeed in Rotterdam, knowhere can. Rotterdam makes it happen!
Risk assessment For any of the risk categories listed in the table below, please identify and comment on high-impact and high-likelihood risks that could impact the achievement of your city's climate neutrality target by 2030
Every plan or project has risks which can harm its execution. The purpose of a risk assessment is to identify and analyse these potential risks. Properly made risk assessment can reduce the likelihood of negative impacts to the plan/project and/or the magnitude of the impacts, if effective mitigating actions are planned and implemented. Risk assessment has three steps: - Identification of the risks and their impacts - Evaluation of risk level - Planning of necessary mitigating actions Identifying potential risks, i.e. a list of potential things that could stop the city from achieving its climate neutrality target, is the first step in the risk assessment process. For each risk category, the help text provides examples of potential sources of risk. Those lists are not conclusive. Your city is invited to reflect on the risks impacting/associated with an accelerated run towards climate neutrality, by focusing on those having both high impact and high likelihood. It is recommended to include city-specific risks stemming from its local characteristics. Definitions - Risk: risk is defined as the effects of uncertainty on objectives. - Risk level: combination of the likelihood of occurrence and the expected impact to plan/project execution. - Risk source: fundamental (internal and/or external) driver that causes risks, i.e.
anything which alone or in combination has the intrinsic potential to give rise to risk. Risk sources identify where risks can originate.
65
Category 1: Leadership, strategic planning and political risk sources 700 character(s) maximum Examples of risk sources: - National government commitment - Government involvement and directions - Ministerial processes - Parliamentary processes and requirements - Local government commitment - Political will - Change/ turnover in government - Consensus - Political environment - Leadership and management processes - Strategic, divisional & unit planning & reporting - Corporate practices to be assessed
Category 2: Finance risk sources 700 character(s) maximum Examples of risk sources: - Financial requirements and conditions - Policies and procedures - Financial management - Legislative & industry requirements - Legal costs - Corruption and fraud - Fluctuation in credit rate, market, currency - Inflation to be assessed
Category 3: Regulatory risk sources 700 character(s) maximum Examples of risk sources: - Legislative requirements - Changes in the regulatory framework - Legal and governance obstructions - Industry regulations and standards - Legal liabilities - Departmental guidelines - Licenses to operate to be assessed
Category 4: Operational risk sources 700 character(s) maximum Examples of risk sources: - Policies and procedures
66
- Financial management - Contractual agreements - Contract specifications - External, outsourced functions - Asset management - Resource availability - Transparency & dispute resolution - Procurement - Legal compliance - Protective security - Advancement in technology - Conflicts of interest - System failures - Business continuity and disaster response to be assessed
Category 5: Organisational risk sources 700 character(s) maximum Examples of risk sources: - Managerial responsibilities - Policies & Procedures - Legislative requirement - Divisional planning and management - Recruitment and allocation of resources - Workforce and succession planning - Ethical and Professional conduct - Governance - Monitoring - Independence and quality of evaluation - Knowledge management - Budget availability and cash flow - Internal control - Procurement to be assessed
Category 6: Partnerships / Stakeholder (Working Together) risk sources 700 character(s) maximum Examples of risk sources: - Stakeholder relationships/engagement - Organisational relations (internal & external) - Government collaborations - Capacities of the partners - Roles and responsibilities among partners - Public opinion and media - Leadership - Communications to be assessed
67
Category 7: Social risk sources 700 character(s) maximum Examples of risk sources: - Social inequality - Social inclusion - Human rights - Community health - Cultural heritage - Displacement, resettlement - Gentrification - Energy poverty - Transport poverty - Poverty - Labour and working conditions to be assessed
Category 8: Environmental risk sources 700 character(s) maximum Examples of risk sources: - Biodiversity conservation and sustainable natural resource management - Environmental disasters - Encroachment on rural areas - Pollution - Urban heat island effect - Interference with natural cycles (e.g., migration flows) to be assessed
Category 9: Safety and Security risk sources 700 character(s) maximum Examples of risk sources: - Cyber-security - Manmade hazards - Volatile prices and provision (even provisional) - Civil unrest - Work health and safety to be assessed
Background Documents Codes and IDs Language versions Personal data protection statement Technical data policy
68
UPDATE 26-01-2022 - User Guide v2.3
Contact Contact Form
69