CConstaterende datLelystad
Koppel je AI →
Document · PDF

BESTSELLER LELYSTAD CITY COUNCIL 27.09.2022.pdf

Raadssessies (Trouwzaal) 27 september 2022, gemeente LelystadBij agendapunt: 266. Sessie aanvraag presentatie van Bestseller481 woorden

Open het PDF bij de gemeente ↗Naar de vergadering →

Tekst van het document

Uit het bestand gehaald, zonder opmaak, tabellen en afbeeldingen

BESTSELLER LELYSTAD Lelystad City Council S e p t e mb e r 2 7 t h 2 0 2 2

1

Agenda Introduction to BESTSELLER Why are we in Lelystad Employment at our Lelystad site Inspiration from other sites/builds What we plan to build in Lelystad The zoning plan procedures Questions 2

BESTSELLER

DESI GN

PLANNI NG

PR OD UCTI ON

BULK FREI GHT

WAREHOUSE 3

ORDER

TRANSPORT

CUSTOMER

BESTSELLER Warehouse overview 2023

4

GROWTH

SUPPLY CHAIN

CUSTOMERS

SUSRTAINABILITY

INTERNATIONAL

PEOPLE

WORKFORCE

BESTSELLER PEOPLE PROMISE

Employees 500 Operations Execution

61 %

Technical Specialist

7%

Well being when

Proud &

going to work

Motivated

Job Safety

Satisfaction / Management

32 %

Joy

COLLABORATION/ ATTRACTION BESTSELLER Employees Dutch Nationalities National Business Trainee (NBT)

Lelystad and surroundings

Stu d en t jo b

Other recruitment agencies 5

LOGISTIC CENTER, HADERSLEV DENMARK

Link to design video

7

TRAINING FACILITY, BRANDE DENMARK

TRAINING FACILITY, BRANDE DENMARK

8

OFFICE BUILDING, AARHUS DENMARK

9

OFFICE BUILDING, AARHUS DENMARK

10

Location: Flevokust Haven Size: 28 Acres Operation: One touch automation

OPERATIONAL DIMENSIONS Storage capacity: 2.000.000 Cartons

Ingoing Trucks/Containers: Week: 650 24 hour: 160 Estimated 80% through the Terminal Outgoing Trucks: Week: 950 24 hours: 140

Operational 2026 11

Building Composition Preliminary Concept

High Bays Storage Facility ~33.000 m2

Height: 40 meters Production Area Pick, Pack, Ship ~33.000 m2 Height: between 15 and 20 meters Office Area Des k, Res taurant, meeting rooms ~3.500 m2 Height: between 15 and 20 meters Outside Yard Employee Parking Green/Water

12

Green roofs

Architectural

Wood

Solar Panels

Biodiversity Nature

13

“BESTSELLER wishes to achieve a workplace where people are proud of working. A workplace that takes care of its people -Just like family. A workplace where people are motivated & engaged and a workplace that develops and grows its people. A site that fits within the surroundings and in harmony. A site that is sustainable in all aspects.”

Procedures Timeline Building Procedures

Zoning Procedures 2022

Nov

Municipality

Oct

2023

Dec

Jan

Feb

Mar

Apr

May

Jun

2024

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Publication

Publication

Publication

Inzage termin

Inzage termin

Inzage termin

Mar

Conclus ion by City Council

BESTSELLER

Vaststelling B.P. door raad

Draft of Zoning Plan

Draft of Building Permit App.

Final Zoning Plan

Ontwerp B.P.

Irrevocable zoning plan Vastgesteld bestemmingsplan

14

Onherroepelijk B.P.

bouwaanvraag

Building Permit bouwvergunning

QUESTIONS 15

Links Link to video of BESTSELLER Logistic Facility in Haderslev Denmark

https ://www.y out ube.c om/ watc h?v=O 0Fi HxV 3jf w&fea t ure =y out u. be&a b_ cha nnel=c f molle r

Link to video of interior mechanic setup of BESTSELLER Logistic Facility in Haderslev Denmark

https ://www.y out ube.c om/ watc h?v=E x4 Sy PXW my c&t =6 9s &ab_cha nnel=BE ST SELLER A %2 FS

16

De tekst is automatisch uit het bestand gehaald en kan afwijken van het origineel (kolommen, tabellen en koppen lopen door elkaar). Het officiële stuk bij de gemeente is leidend. Bron: https://api1.ibabs.eu/publicdownload.aspx?site=Lelystad&id=166c61ff-32cc-4d16-ab0c-81ae37cd3055