Gemeente Hilvarenbeek Ingekomen: 23-4-2020

DETAIL A | Road cross section SCALE 1:25

1% FALL

300

1% FALL

120

4000

Notes: 1.

All dimensions to be confirmed on site prior to installation.

2.

All dimensions are indicative only and in mm

3.

Drawing based on:

unless otherwise specified.

GE Imagery date: 19/04/18; "Voorlopig ontwerp_ZonneparkHilvarenbeek_v2.1_3april2020-01.jpg

LAYER THICKNESS OF 120MM DOWN CRUSHED LIMESTONE 0/40MM

Legend:

SUPPLY AND APPLICATION OF CLEAN LIMESTONE 40/75MM DOZING IN A LAYER THICKNESS OF 300MM

Site boundary Maintenance track Central Inverter

System description:

10

54 4

3

4299

64 175

DC Power kWp: AC Power kVA:

4 084.08 3 000

No. of modules: Module type: Dimensions:

9 282 TP6H72M-440-L (440W) 2008x1002x40

Substructure type: Tilt angle: Shading angle: Azimuth from South: Pitch distance: Row to row distance:

6 modules in landscape 15° 28° Due South 8 019 mm 2 000 mm

No. of inverters: Inverter type: Power ratio:

3 SMA Sunny Central 1000CP XT 1.36

No. of AC combiners: No. of Transformers

-

Fence area: Fence length: Total area:

3.00 ha 700 m 4.98 ha

Proposed location:

19

3 42

7675

40

86

8

Revisions:

7773

Rev Date

Comments

Drawn

Client:

Ambrosiusweg Hilvarenbeek

Location:

Hilvarenbeek, Netherlands 51°31'57.20"N 5°6'35.43"E

Title:

Road layout

Drawn:

DETRA / RS

Checked:

RV

Scale:

1:400@A1

Date:

17/04/20

Drawing No:

TE1006-200

Rev:

--

36

61

2

78

62 4

1

21 86 1

6794

Kronehoefstraat 66 5622 AC, Eindhoven The Netherlands www.tomorrowenergy.nl

0

20

40 m

Do not scale from this drawing. Site verify all dimensions prior to construction. Report all discrepancies to the drawing originator immediately. This drawing is to be read in conjunction with all relevant documents and drawings.

De tekst is automatisch uit het bestand gehaald en kan afwijken van het origineel (kolommen, tabellen en koppen lopen door elkaar). Het officiële stuk bij iBabs is leidend. Bron: https://api.notubiz.nl/document/10313829/1