2.0 MW GRONDGEBONDEN ZONNEPARK PROJECT

Permitted SMA Solar Technology and prohibited AG mounting positions:

BLAD NR.

PROJECTONTWIKKELAAR

PROJECTMANAGER

BESCHRIJVING

PROJECTBESCHRIJVING

TECHNISCH MANAGEMENT

6 Mounting and Preparing the Connection 767.5 700 (27.56) (30.2)

SMA Solar Technology AG

(2 −− 3.27) 50 (1.57 40 83 60 − 2.36)

Maintain ☐ will If Recommended you prevent maintain thepower recommended the clearances: reduction recommended clearances due (19.7) 500 toclearances, excessive to wallstemperature. adequate as well as heat to other dissipation (19.7)inverters 500 willor beobjects. ensured. Thus, you

833 (32.8)

(19.7) 500

Center3:ofDimensions Figure gravity: of the profile 770 8.4 rails(0.3) (30.3) and the clamping range of the450.6 mounting (17.7) bracket (dimensions in mm (in))

(19.7) 500

(19.7) 500

6.2 Connecting Plates Overview

PROJECTNAAM: ZONNEPARK HEISLAGSEWEG NIEUWESTRAAT (INCL. WATERBERGING) PROJECT ADRES: NABIJ DOETINCHEMSEWEG 14, 7031 EW, WEHL

FIGURENLIJST

6 Mounting and Preparing the Connection

Figure 10° penetrate The ☐ product 5: Permitted themay should product. only and beprohibited be mounted mounted mounting such in athat permitted positions the LED position. signals This can be willread ensure off that without no moisture difficulty. can

(19.7−−550 500 21.7)

plate A Figure (19.7) 500 standard can 6: Recommended beconnecting purchasedclearances(Dimensions plate optionally. is included (19.7) 500 (7.9) 200 in the in scope mm) of delivery. (3.9) 100 (19.7) 500 Another alternative connecting

Figure 4: Dimensions of the center 376.7 (15.5) 393.4 (14.8) of gravity of the product (dimensions 369.2 (10) 254.8 (7.4) 188.9 in mm (in))

832.7 (32.8) (14.5)

Operating manual

22

Operating manual

SHP-20-BE-en-14

23

SHP-20-BE-en-14

· ·

· ·

· ·

0.7

Bestaand maaiveld: variërend van 12.8 - 13.2 m +NAP

Streefpeil 12.20 m +NAP 1.3

1:4

1: 1

0.7

5.2

1.7

Rijweg

Bestaand maaiveld: variërend van 12.8 - 13.2 m +NAP

A'

0.8

A 8

4.1

20.3

Grondwal

Beheerpad

Zonnepark

Streefpeil 12.20 m +NAP

1:35 1

1:35

B'

0.8

B

1

1:

10.2

4.1

2.1

13.7

5.2

8

29.8

Zonnepark

Beheerpad

Talud

Grondwal

Talud

Gasleiding incl. vrijwaringszone

Talud met beplanting

· ·

· ·

· ·

· ·

· ·

· ·

· ·