Bijlage 2. Technische tekening - ZP Wehl v2.pdf
Tekst van het document
2.0 MW GRONDGEBONDEN ZONNEPARK PROJECT
Permitted SMA Solar Technology and prohibited AG mounting positions:
BLAD NR.
PROJECTONTWIKKELAAR
PROJECTMANAGER
BESCHRIJVING
PROJECTBESCHRIJVING
TECHNISCH MANAGEMENT
6 Mounting and Preparing the Connection 767.5 700 (27.56) (30.2)
SMA Solar Technology AG
(2 −− 3.27) 50 (1.57 40 83 60 − 2.36)
Maintain ☐ will If Recommended you prevent maintain thepower recommended the clearances: reduction recommended clearances due (19.7) 500 toclearances, excessive to wallstemperature. adequate as well as heat to other dissipation (19.7)inverters 500 willor beobjects. ensured. Thus, you
833 (32.8)
(19.7) 500
Center3:ofDimensions Figure gravity: of the profile 770 8.4 rails(0.3) (30.3) and the clamping range of the450.6 mounting (17.7) bracket (dimensions in mm (in))
(19.7) 500
(19.7) 500
6.2 Connecting Plates Overview
PROJECTNAAM: ZONNEPARK HEISLAGSEWEG NIEUWESTRAAT (INCL. WATERBERGING) PROJECT ADRES: NABIJ DOETINCHEMSEWEG 14, 7031 EW, WEHL
FIGURENLIJST
6 Mounting and Preparing the Connection
Figure 10° penetrate The ☐ product 5: Permitted themay should product. only and beprohibited be mounted mounted mounting such in athat permitted positions the LED position. signals This can be willread ensure off that without no moisture difficulty. can
(19.7−−550 500 21.7)
plate A Figure (19.7) 500 standard can 6: Recommended beconnecting purchasedclearances(Dimensions plate optionally. is included (19.7) 500 (7.9) 200 in the in scope mm) of delivery. (3.9) 100 (19.7) 500 Another alternative connecting
Figure 4: Dimensions of the center 376.7 (15.5) 393.4 (14.8) of gravity of the product (dimensions 369.2 (10) 254.8 (7.4) 188.9 in mm (in))
832.7 (32.8) (14.5)
Operating manual
22
Operating manual
SHP-20-BE-en-14
23
SHP-20-BE-en-14
· ·
· ·
· ·
0.7
Bestaand maaiveld: variërend van 12.8 - 13.2 m +NAP
Streefpeil 12.20 m +NAP 1.3
1:4
1: 1
0.7
5.2
1.7
Rijweg
Bestaand maaiveld: variërend van 12.8 - 13.2 m +NAP
A'
0.8
A 8
4.1
20.3
Grondwal
Beheerpad
Zonnepark
Streefpeil 12.20 m +NAP
1:35 1
1:35
B'
0.8
B
1
1:
10.2
4.1
2.1
13.7
5.2
8
29.8
Zonnepark
Beheerpad
Talud
Grondwal
Talud
Gasleiding incl. vrijwaringszone
Talud met beplanting
· ·
· ·
· ·
· ·
· ·
· ·
· ·