Lijst van grondtransacties, nr. 4
Tekst van het document
TEK.
OPP.
KOOPSOM EXCL. B.T.W. / OB
2019-81
407
113.494,86
137.328,78
2019-82
468
130.505,14
157.911,22
2009-41
4.052
1,00
1,00
2020-44
170
2.975,00
2.975,00
2020-37
21
367,50
367,50
Overzicht grondtransacties
B&W
12-05-20 VERKOOP
B&W
12-05-20 VERKOOP
B&W
27-04-10 VERKOOP
B&W
18-06-19 VERKOOP
B&W
18-06-19 VERKOOP
B&W
18-06-19 VERKOOP
B&W
18-06-19 VERKOOP
NAAM F.N.T.M. VAN DEN AKKER EN A.W.H.M. VAN DEN AKKER REIJNDERS O.P.J. AARTS EN Y.A.W.F.M. AARTS - VAN DEN AKKER BOUW- EN EXPLOITATIEMAATSCHAPPIJ BEM B.V. H.L. ROHRBÖCK EN E.W.J. ROHRBÖCK - VAN TONGEREN R.M. CREMERS EN C.M.J. JONGENEELEN J.A.A.E. VAN DEN BERKMORTEL EN S.A. VAN DEN BERKMORTEL VAN DER LEY M.B.M. CRANSSEN
B&W
18-06-19 VERKOOP
B&W B&W
B/R
BESL.
OMSCHR.
AKTE 16-3-2021
T.B.V.
BEUKENSTRAAT 245 (KAVEL 1, F 2408 BEUKENSTRAAT-ZUID GED.)
BEUKENSTRAAT 245 (KAVEL 2, F 2408 BEUKENSTRAAT-ZUID GED.) BEDRIJVENTERREIN 23-3-2021 VUURIJZER BINDEREN - ZUID VOOR EN NAAST SUEZLAAN 44 (C 26-3-2021 PROJECT WALSBERG 4215 GED. EN C 4213 GED.) VOOR REEKSENAKKER 18 (C 3282 26-3-2021 PROJECT WALSBERG GED.) 16-3-2021
26-3-2021 NAAST DENNENVELD 2 (C 4203 GED.)
PROJECT WALSBERG
2020-22
14
245,00
245,00
26-3-2021 VOOR DENNENVELD 8 (C 3243 GED.)
PROJECT WALSBERG
2019-54
73
1.277,50
1.277,50
M.P. DANKERS
26-3-2021 VOOR DENNENVELD 14 (C 3953 GED.) PROJECT WALSBERG
2019-56
38
665,00
665,00
18-06-19 VERKOOP
W.C.H. VAN DEN BERG EN M.A.A. VAN DEN BERG - REMMEN
26-3-2021 VOOR HEIKANT 9 (C 3892 GED.)
PROJECT WALSBERG
2019-19
124
2.170,00
2.170,00
18-06-19 VERKOOP
A.J.A. RETERA EN W.G.C.H. RETERA - VERHOEVEN
26-3-2021 VOOR HEIKANT 15 (C 3428 GED.)
PROJECT WALSBERG
2019-36
77
1.347,50
1.347,50
PROJECT WALSBERG
2019-69
695
12.162,50
12.162,50
PROJECT WALSBERG
2019-49
123
2.152,50
2.152,50
26-3-2021 VOOR KLINGERVELD 5 (C 3688 GED.)
PROJECT WALSBERG
2019-60
24
420,00
420,00
26-3-2021 VOOR KROMVELD 3 (C 4169 GED.)
PROJECT WALSBERG
2019-63
15
262,50
262,50
26-3-2021 VOOR KROMVELD 4 (C 4169 GED.)
PROJECT WALSBERG
2019-64
19
332,50
332,50
26-3-2021 VOOR KROMVELD 7 (C 4169 GED.)
PROJECT WALSBERG
2019-65
26
455,00
455,00
VOOR EN NAAST KROMVELD 13 (C 4169 GED.)
PROJECT WALSBERG
2019-61
74
1.295,00
1.295,00
26-3-2021 NAAST LANGSTRAAT 41 (C 3953 GED.) PROJECT WALSBERG
2020-14
58
1.015,00
1.015,00
VOOR EN NAAST HERENBERG 2 (C 26-3-2021 3953 GED.) VOOR EN NAAST HERENBERG 8 (C 26-3-2021 3686 GED. EN 3892 GED.)
B&W
18-06-19 VERKOOP
F.H.J. VAN TILBURG
B&W
18-06-19 VERKOOP
M.G.A. VAN CAUTEREN
B&W
18-06-19 VERKOOP
B&W
18-06-19 VERKOOP
B&W
18-06-19 VERKOOP
B&W
18-06-19 VERKOOP
B&W
18-06-19 VERKOOP
B&W
18-06-19 VERKOOP
M.L.T.J. TEEUWEN
B&W
18-06-19 VERKOOP
B&W
18-06-19 VERKOOP
26-3-2021 C.H. KLEIN GUNNEWIEK H.M. VAN DEN EINDEN EN 26-3-2021 A.J.E.M. VAN RIJSWIJCK P.G.M. DERKS EN Y.A.J.M. DERKS 18-3-2021 VAN DUIJNHOVEN
B&W
LOCATIE
KOOPSOM INCL. B.T.W. / OB
22-07-20 VERKOOP
G.A.J. VAN HOUDT EN M.J.P.L.C. VAN HOUDT - JEGERINGS M.T.H.L. VAN DE LAAR P.B. KNIEPSTRA EN I.J. KNIEPSTRA - MESMAN A.P.G.M. VAN DE WAL EN D. VAN DE WAL - VERHAGEN G.F. VAN DEN BOOMEN EN M.J.G.A. VAN DEN BOOMEN FRANSEN
26-3-2021
VOOR WARANDE 10 (C 3953 GED.)
PROJECT WALSBERG
2019-68
37
647,50
647,50
VOOR WARANDE 11 (C 3953 GED.)
PROJECT WALSBERG
2019-52
16
280,00
280,00
2020-20
745
233.669,42
282.740,00
KLEINE BOTTEL (B 2653 GED.), KAVEL Q1420 KLEINE BOTTEL B PAST. JACOBSSTRAAT