Ketelmakersweg Koperslagersweg Main entrance Nagelklinkersweg 19A | A Emergency entrance A 19B | 19C | B B 19D | 19E | 19F 19O 19N | 19M | 19K 19J | 19H 19G | Scale @ 1:20000 LEGEND SITE BOUNDARY SECURITY FENCE GATE WITHIN SECURITY FENCE 4 HR BESS BLOCK 50kV INKOOPSTATION ACCESS DOORACCESS DOOR COMBINED SUBSTATION 6,0 | 6,0 | 5,7 | 5,0 4,0 | 5,5 | 32,8 | ACCESS TRACK 3,5 | CCTV (located inside the fence) ACCESS DOOR ACCESS DOOR 3,7 | 4,5 | 50 KV SUBSTATION SOUND BARRIER NOT FOR CONSTRUCTION 17,5 | 1 BESS BLOCK CONTAINS: 1 x MVS5000UD-LV MV STATION COMPRISING OF - 1 x 5000kVA 0.69kV/33kV TRANSFORMER - 1 x 36kV RMU 3,1 | 17,5 | 4 x ST5015UX (5015kWh) BATTERY CONTAINERS COMPRISING OF V&G V&G 5,0 | - 1 x 5015kWh LFP BATTERIES V&G REMOVABLE FLOOR PLATE - 6 x SC210HX (210kVA) PCS REMOVABLE FLOOR PLATES ACCESS DOOR MAIN DOOR | 3,3 14C 13,3 | TOTAL BLOCKS: | 12 4,5 14D | INSTALLED BATTERY CAPACITY: | 240.72MWH USABLE BATTERY CAPACITY | 216.5MWH 14E | (EXCLUDING AUX.): POWER GENERATING FACILITY | 60.48MVA APPARENT POWER RATING: 14F POWER GENERATING FACILITY C-RATE: | 0.25C SITE RATED POWER OUTPUT @POC: | 50MW 5,5 INSTALLED POWER: | 60MW Area available for | TOTAL AREA (RED BOUNDARY) | 11,150 SQM water compensation | FENCING AREA (ORANGE BOUNDARY) | 8,663 SQM BUILDING FOOTPRINT (INSIDE FENCE) | 2,506.73 SQM Battery containers1,207.44 sqm Customer Substation48.9 sqm 50kV Inkoopstation
room21 sqm Main Substation306.39 sqm Pavement923 sqm WATER COMPENSATION AREA | 791.01 SQM Installer Details | Comments | Revision | Description | Revised By | Date | Drawn By | Installation Address | Project A | Issued for comment | MS | 04/05/2023 Anesco Ltd. | Not for Construction | B | Updated with measurements and elevations | MS | 13/12/2023 | RD | Koperslagersweg, | Den Helder Note 1: In the elevations shown in this drawing for MV Stations and Battery Blocks an addition height of 200mm is added | C | Amendments to BESS, fencing and other areas | MS | 15/01/2024 The Green, | from the ground for cable management.(This height is subject to further review and approval.) | D | New Map ovelayed, elevations updated | RD | 22/04/2024 | Bedrijventerrein Easter Park, | E | Updated with 4 hour solution. Distances modified. | PVB | 04/08/2024 | Scale | Title Note 2: Each of the 12 BESS blocks charge/discharge an total amount of 20.06MWh. The output voltage from the 4 (four) | J | Added water mark and new notes for municipality | PVB | 18/12/2024 | Kooypunt, Benyon Road, | battery containers on each BESS block is 0.69V that is then stepped-up to 33kV through a step-up transformer located in | K | Acoustic wall added and Minor adjustments. | PVB | 17/06/2025 | 1:500@m the MV-skid.
The MV-skids are connected to the customer substation, which is a building containing Auxiliary transformer, | A3 | Situatietekening EOS Reading, | switchgears and a control room. From the switchgears, the voltage is stepped-up again to meet the grid values, which is | L | Adjustments required from municipality | PVB | 22/08/2025 | De Kooy, 50kV. That happens through a main 60MVA step-up transformer 33kV/50kV. | M | Adjustments on boundaries and general alignments | PVB | 10/02/2026 RG7 2PQ | Note 3: The dimensions of the substation drawing are conceptual and for illustrative purposes only. | N | Compliance with latest comments from municipality | PVB | 24/02/2026 | Sheet | Den Helder, | Drawing No. | Rev. Tel: 0845 894 4444 | Size | 1786 RA | Q23_0076_01 | N A3