Overview anchoring off-shore ground the number of boat is calculated in the static study
the number of boat is calculated in the static study
the number of boat is calculated in the static study
the number of boat is calculated in the static study
the number of boat is calculated in the static study
the number of boat is calculated in the static study
Waterlevel
Max 0,3m
6,00m
Min 5,7m
mechanical ground anchors (HEA 240)
Max 0,3m
Max 0,3m
6,00m
6,00m
Min 5,7m mechanical ground anchors (HEA 240)
Min 5,7m
mechanical ground anchors (HEA 240)
Off-shore ground anchoring details Solar boat anchored
Connector for anchoring
* *
Front view
Anchor
j i h g f e d c b a Index
Pv area might deviate up to 10-15 m maximum from given location due to floating and water level variations Final anchoring layout will be defined by BlueC simulated via OrcaFlex based on dynamic and static loads (wave, wind forces, water level variation) for the specific location
Aangepast door
Datum
Project:
Omschrijving aanpassing
GroenLeven BV Opdrachtgever: De Ynfeart 7-400 | 8447 GM Heerenveen Telefoon: +31 513 200959 | www.groenleven.nl Datum
Getekend Revisie Gezien
26.08.2020 -------
Tekening nummer: Bestandsnaam:
Powered by TCPDF (www.tcpdf.org)
Pleg-Vos Balderhaar Nederlands Floating PV Power Plant GroenLeven
Naam
pmi -------
Tekening status:
Schaal
Construction Issue
FL_12_detail_anchoring off-shore ground BWre-PVB-CD_Planning issue.dwg