DC micro grids I Aalsmeer DC is coming and will stay faster than expected Presented by Harry Stokman

2021 DC Systems. All Rights Reserved.

I’m dyslectic please forgive me for spelling mistakes

I’m dyslectic please forgive me for spelling mistakes Who is Harry Stokman DC Entrepreneur since 1988

SyC LVDC

WG1 WG2

DC Zoning system

WG3

•

DC Protection solution

•

Architect of Current/OS

PT 63255

Active in standardization

PT 63317 aHG 2

Strong knowledge off •

DC Systems

•

NL Regulation

•

Earthing

•

Corrosion

•

Safety

TC64

MT1 Convenor advisory board

•

Political active

TC8

CAG

Inventor of:

Realized many DC projects

TC 100 SC121A TC13

MT1

LVDC publications for Electricity Access

JWG9

Use-cases for public LVDC distribution Parameters for protection and safety in DC

WG11

Predicting Electrical Compatibility

Technical report to advice the voltage labels for Table 60038

MT17

Basic requirements for protection against electric shock 1500V discusion

JWG44 Standard for prosumer

installations chapter 8-2 Ed 2 AC only probably 8-2-1 Ed 3 DC only probably 8-2-2

Electricity metering equipment

ahG35 Review of TC 64 publications

LVDC industry applications

PT 60947-10

DC Data Centres and Industrial Automation

Low-voltage switchgear and controlgear - Part 10: Semiconductor circuitbreakers

Marketing

TA 18 Organization of the IEC world DC Summit

NEC 64

WG DC

aHG 5 aHG 6

Principle definitions Chapter 1-3 of 60364 DC and AC are equal

To fill in the standard 60038

USB-C Standard

Since 2021 DC systems has become part of Schneider Electric

NPR PV

Dutch DC mirror committee NPR 9090

PV farms and piplines

What drives me: We are connected to the electrical system

Cooling Heating

Clean Water

Mobility

Internet

Hygiene

And everything is DC

Light

Economy

It is the biggest asset we own as mankind 2021 DC Systems. All Rights Reserved.

Information

Comfort Food storage

Food production

Environment

News from the past

2021 DC Systems. All Rights Reserved. | Page 4

Background and why DC become so important

The Huge

Issue 2021 DC Systems. All Rights Reserved. | Page 5

Net problemen Congestie problemen Zonnestroom Electrische mobiliteit Warmte pompen Voor grotere of nieuwe aansluitingen voor gebruik

Gedoe in het netwerk 2021 DC Systems. All Rights Reserved.

Voor grotere of nieuwe aansluitingen voor terug leveren

Netbeheerder Ruimte en tijd •

De discussie met Alliander loop al meer dan 10 jaar over de locatie, om de problemen in de Haarlemmermeer aan te pakken. Hier zijn twee stations nodig.

•

Er wordt nog niet gesproken betreft de laagspanningsinfrastructuur. Het gaat alleen maar om twee extra aansluitvermogen ophoogspanningsnet van Tennet.

En die hebben we niet meer © 2021 DC Systems. All Rights Reserved. | Page 7

Energie transitie “Een toekomst bestendige betrouwbaar netwerk” Dit is de slogan van Rutten IV Dit roept veel vragen op: • Wat is toekomst bestendig • Wat is betrouwbaar • Woningbouw en energie transitie zijn volledig afhankelijk van de elektrische infrastructuur • Welke visie wordt gehanteerd

© 2021 DC Systems. All Rights Reserved. | Page 8

Net problemen Aalsmeer Actueel per 24-jan-2022

Wachten Alliander waarschuwt voor problemen op die volle plekken. Bedrijven en consumenten moeten langer wachten op een nieuwe aansluiting, of op een verzwaring van de bestaande aansluiting voor bijvoorbeeld een warmtepomp of laadpaal. Consumenten met zonnepanelen kunnen niet meer op elk moment van de dag stroom terug leveren aan het net. Dat komt dit jaar al 33% vaker voor dan vorig jaar.

Geen ruimte voor duurzame opwek

© 2021 DC Systems. All Rights Reserved. |

Geen ruimte voor nieuwe en/of zwaardere aansluitingen

Page 9

Solution to manage power flow (SMART GRIDS) Is digital communication the solution? •

Do we really want to manage the Electrical infrastructure with computers ?

Do NOT manage power flow with ICT in our main energy system Ransomware in pipelines 2021 DC Systems. All Rights Reserved. |

Page 10

• Hoeveel zwaarder is voldoende?

Oplossing • Hebben we genoeg mensen? • Hebben we de ruimte? net verzwaring? • Nemen we de kosten van niet

afgeschreven kabels voor lief? • Willen wij voor de toevoer meer hoogspanningsmasten? • De netbeheerder mag niet te veel verzwaren en anticiperen! • Infra structuur in de gebouwde omgeving gaat plat! 2021 DC Systems. All Rights Reserved. |

Page 11

Grow of the system is needed

• Heat and Transport become part of the electrical system • More people result in more energy • The system must grow minimal with 200% based on the current consumption • But in 2050 how much is needed?

2021 DC Systems. All Rights Reserved. | Page 12

Raw materials We have to share the limited materials in the word to avoid social disasters

2021 DC Systems. All Rights Reserved. | Page 13

EV verkoop Alle fabrikanten zetten vol in of electrics

2021 DC Systems. All Rights Reserved. | Page 14

Laad methode voorbeeld •

Thuis laden gecombineerd met zonnepanelen, het goedkoopst voor de gebruiker.

•

Op openbare laadpalen, fors duurder voor de gebruiker.

•

Snel laad stations. Moet op de route liggen wachttijd en zeer duur

2021 DC Systems. All Rights Reserved. | Page 15

Reken voorbeeld auto verbruikt 200Wh/km accu capaciteit 90kWh •

Thuis 0,045 euro / km 18,8 euro/tank

•

Op straat 0,09 euro/km 40,5 euro/tank

•

Snel laden 0,13 euro/km 58,5 euro/tank

•

Tanken op de zaak zal het verschil nog groter maken

•

Woningen met veel PV maken het nog gunstiger voor de bezitter.

Effect voor mensen Thuis laden Openbaar laden

Twee deling in de maatschappij met sociale gevolgen • Niet iedereen kan op zijn eigen erf laden • Openbare laadpalen kunnen niet voldoende geplaats worden. • Wie niet kan thuisladen met zijn of haar elektrische auto is onder meer afhankelijk van het openbare laadnetwerk hogere kosten. • Als je geen plek kun vinden dan wordt je gedrongen bij snel laadstations te gaan, nog hogere kosten • Hoe lager het inkomen hoe duurder het rijden met de huidige maatregelen. 2021 DC Systems. All Rights Reserved. | Page 16

Sustainability DC is almost in all sustainable goals set by the United Nations

2021 DC Systems. All Rights Reserved. | Page 17

We are already living in a DC world All things we © we and < are DC

V2G drives DC Microgrids

2021 DC Systems. All Rights Reserved. | Page 18

DC Drives Island Mode

DC change the energy system

Congestion management Water level analogy with Voltage Level

SOURCE

DC converter to Application

USER Water to grass and grass to Milk

DC/DC Converter + Wind Source to storage DSO Match maker DNO Water state

Microgrid Operator MGO Local Water manager X

Last mile

Cell A

Distribution and storage

USER Water to grass and grass to Wool

PUMP

Distribution

Droop

PUMP

Over supply

Flooding

Balanced 350V/700V

Desired water level

Over load

Dry land

X

Planned Distribution and storage (low capacity) © 2019 Harry Stokman

The power flow management 2021 DC Systems. All Rights Reserved.

Last mile

Cell B

2021 DC Systems. All Rights Reserved. |

Page 20

Movie on youtube

https://currentos.foundation/

De Visie Wat is ons masterplan (in 2004 al begonnen aan de ontwikkeling van dit doel)

• Keep existing AC infrastructure unchanged (don’t remove old investments if the are working) • New regulations for local DC grid existing regulations for the AC grid (enables local match makers) • Improve availability for the system • Bidirectional system from ground up • Reduce the distribution investments © 2021 DC Systems. All Rights Reserved. | Page 21

 

 

 

Wat willen we? De grootste uitdaging die we hebben om te komen tot een oplossing is: •

Ruimte in de regelgeving is er nauwelijks om het anders optelossen

•

Komen tot een realisatie in een wijk gezamenlijk met de overheid en netbeheerder en markt

2021 DC Systems. All Rights Reserved. | Page 22

Standards International Electrotechnical Commission

Underwriters Laboratories

Current/OS (global)

DC Industy (D)

Emerge Alliance (US)

There is a lot of activity to align with local organisation with Current/OS 2021 DC Systems. All Rights Reserved. | Page 23

The Current OS protocol for active DC microgrids focuses on congestion management, safety, resilience, and cybersecurity and does not require central real-time control. This Operating System is regarded by Schneider and Eaton as the proper basis for a global rollout of decentralized DC grids and can play a major role in the energy transition. Schneider and Eaton jointly decided to make this proven Operating System available to any product manufacturer around the globe, to secure compatibility of its product(s) with any DC microgrid running on the Current OS protocol. The open and independent Foundation was set up to make the necessary Intellectual Property available to any Adopter wishing to participate.

Europe is forcing DC solutions without recognize it 😀

•

Forcing USB-C connector for small devices that need an external power supply (DC)

•

Stimulating electromobility (DC)

•

Digitalization and smart grid by implementing storage. (DC)

•

Forcing optimalisation of electrical machines BLCD or frequency drives (DC)

•

Moving to LED lighting (DC)

•

Using heat pumps (DC)

2021 DC Systems. All Rights Reserved. |

Page 24

It is not about system efficiency but an efficient system

Requirements of electrical systems •

The need for more resilient system that can resist environmental issues for example hurricanes or earthquakes. (DC Microgrids)

•

Moving from OPEX driven energy production to CAPEX driven production. (DC Dynamic capacity)

•

Moving from reactive balancing the system to opportune driven balancing (DC Droop control)

•

Increase power in final circuits (DC solid-state protection)

•

More bidirectional loads and sources in building (DC current sharing)

•

Hydrogen in the system for application where electrical solutions don't make sense like high temperature processes, large mobile systems like trucks or airplanes etc. (DC to molecules)

2021 DC Systems. All Rights Reserved. |

Page 25

DC is the

Last Chance for a compatible system DC makes it happen

© 2021 DC Systems by Harry Stokman

Actions needed from the EU Actions from the regulators is required •

New regulation rules are needed for DC microgrids o where power capacity can be dynamic. o Capacity connection o AC and DC connection in buildings AC is connected to the existing system and the DC is connected to the local DC microgrid during the transition phase.

•

New stakeholders need to be introduced o DSO (distribution System Operator) o MGSO (Micro Grid System Operator)

•

Because the current situation is too comfortable for the existing suppliers. This will not bring speed to the problem but stimulates classical solutions, some force is needed.

•

Regulation free zones are a big need for learning and development

•

Regulators must be part of projects in a green deal structure

Thanks for you're time For questions you can find me on LinkedIn Harry Stokman

I

www.currentos.foundation

Buildings

DC Real life Examples

Public lighting DC microgrid In the existing Eco structure

DC Public Lighting more than 300km installed

DC Real life Examples

All projects done in the real world within the normal eco system Installers, integrators etc

We have made DC public lighting possible

Together with BAM

DC Public Lighting more than 300km installed

All projects done in the real world within the normal eco system Installers, integrators etc

DC Real life Examples

Single floor demonstrator

All projects done in the real world within the normal eco system Installers, integrators etc Faraday Building

• • • • • • • • •

DC Buildings 150kW power USB-C 350V sockets Protection Lights Ventilation 150kW solar Battery system

DC Public Lighting more than 300km installed

We have made a DC public Microgrid

DC Real • 4,7 km road life • 325x Street lighting LED Examples • 225 Traffic lights

• 100 kW Solar • 1 MWh battery storage • Long cables (protection/earthing)

All projects done in the real All projects done in the real world world within withinthe thenormal normaleco ecosystem system Installers, integrators etc Installers, integrators etc DC Systems, Eaton and Dynniq

DC Real life Examples

USB-C is the most used and global standard socket

DC Public Lighting more than 300km installed

New standard now up to 240W (48V@5A) Next step for LVDC buildings. In the past we have developed a USB-C 100W socket power directly from 350V DC. Demonstrated in the ABN-AMRO Circl building. We see a large use-case for DC Office buildings where power planning is a huge issue. This is why we have developed local 48V areas supplied from 350V of 700V DC System based on Current/OS including protection and autonomous congestions control. The 48V Desk socket is able to supply 3x USB-C devices of 100W each. One socket provides also highspeed ethernet which can be used for power and data to a laptop for example.

DC Homes Example

Project De Muzen in 2023

De tekst is automatisch uit het bestand gehaald en kan afwijken van het origineel (kolommen, tabellen en koppen lopen door elkaar). Het officiële stuk bij de gemeente is leidend. Bron: https://api1.ibabs.eu/publicdownload.aspx?site=aalsmeer&id=102a134c-4226-4229-b808-c5ecd2176a29