Nivy bus station

2

Old Bus Station •

Construction took eight years 1975 – 1983

•

The Mlynské Nivy bus station served its purpose for 34 years.

•

During that time, it did not undergo any major reconstruction, which resulted in its neglected condition.

•

It was eventually closed on October 1, 2017, and demolition work began shortly thereafter.

3

4

5

Temporary Station Bottova Street • On the day the old station closed, a temporary bus station on Bottova Street opened its gates. • The developer HB Reavis invested €6.5 million in its construction. • The station featured a total of 34 bus platforms and five drop-off bays. It also offered a comfortably equipped waiting area with free restrooms and public Wi-Fi, retail outlets, bicycle stands, phone charging stations, and luggage storage. • It served its purpose until September 2021, when a new chapter began.

6

7

8

Communication, community, transparency • From the very outset, the communication strategy for the Nivy Center project was designed to foster a strong emotional connection between future customers and the development. • At the same time, as the construction had a direct impact on the daily life of the city, we placed great emphasis on transparency and employed a wide range of open communication tools and channels.

9

Temporary Station Bottova Street

10

Temporary Station Bottova Street

11

12

Nivy – basic project scheme 32 000 m2 of office space 70 000 m2 of retail including 3 000 m2 of food market 21 000 m2 of bus station (original 31 000 m2) 10 000 m2 of active green roof including 550 m long running track, playgrounds barbeque place, community garden, refreshment kiosks 2 350 parkin spaces 120 bikes tray in Automatic Bike tower

14

Direct line to the centre of events Nivy is a representative gateway to Bratislava with a fully integrated underground bus station: •

Total area of the bus station: 21 000 m²

•

Operating hours: 24/7. Outside the opening hours of the Nivy Center, access is available through the entrance at Nivy Tower

14

Passengers services •

6 ticket counters with opening hours: weekdays 6:00–20:00, weekends and public holidays 8:00–18:00

•

ticket sales for suburban, long-distance, and international transport,

•

ticket sales for seasonal routes, concerts, and festivals,

•

full transport card services (issuance, top-up, activation),

•

sales of additional products and services such as the Bratislava Card City&Region, travel insurance, etc.,

•

handling of lost & found items and complaints.

•

Luggage storage

•

Modern restrooms

•

Lounge – International waiting room

•

Baby changing and nursing rooms

•

Fast, free Wi-Fi network

14

Information system •

Current departures and arrivals are displayed on an 8meter-long airport-style digital wall above the ticket counter area.

•

Timetables in the standard 24-hour format are shown on 9 large-format LCD TV panels to the left of the ticket counter area.

•

19 departure screens at each platform.

•

3 LCD TV panels at the exit area displaying arrival and departure information.

•

2 self-service digital information kiosks.

14

Services for transportation providers •

35 bus stands available for lease

•

Fuel station located at the entrance from Svätoplukova Street

•

Automatic underground bus wash facility

•

Maintenance section for bus cleaning and interior deep cleaning

•

Mercedes Benz and Omniplus bus service center for authorized repairs

14

Ventilation Special ventilation ensures 180,000 m³ of fresh air per hour on the platforms. If necessary, this amount can be increased to up to 1,500,000 m³ per hour, which is enough air for almost 41,700 people. The air supply is provided through openings to the outside environment using negative pressure. To enhance passenger comfort, this air is cooled during the summer months using adiabatic cooling technology.

14

Adaption to a new situation Due to a change in the strategy for regional bus transport managed by the Bratislava Self-Governing Region, it was necessary to optimize the original concept. The decline in bus arrivals and departures is approximately 40% compared to 2021.

The station was designed for 2500 connections per day, the utilization in 2021 was 1500 connections, and today it is around 900 connections per day. In the summer of 2025, the reconstruction of part of the platforms began.

20

-1. floor

BUS STATION – original concept

21

-1. floor

BUS STATION - optimalization

22

Bloom - London Is a modern office development situated directly adjacent to Farringdon Station, making it highly accessible for commuters from across London and beyond. The close proximity means there is virtually no travel time between the station and the office, as Bloom is integrated into the immediate station area. This connection makes Bloom an attractive location for businesses seeking convenience and excellent transport links. Employees and visitors can reach the office easily from major London airports and regional towns due to the direct Thameslink and Elizabeth Line services.

23

Bloom - London It is located in the heart of the Clerkenwell district, right next to the Farringdon station.

24

Varso Place - Warsaw A unique hotspot for businesses, tourists and local communities at the very heart of Warsaw. It’s located right next to Warsaw’s main railway hub, Warszawa Centralna (PKP). The station is just a short walk on foot from the tower, making the connection highly convenient. From there, travelers have seamless access to national, international, and local train routes. Metro, tram, and bus links further enhance connectivity across the city. With a direct rail line to Chopin Airport, the location is also ideal for international business. Together, Varso Tower and PKP station form a central hub uniting modern business with excellent transport access.

25

Varso

26

De tekst is automatisch uit het bestand gehaald en kan afwijken van het origineel (kolommen, tabellen en koppen lopen door elkaar). Het officiële stuk bij iBabs is leidend. Bron: https://api.notubiz.nl/document/16039642/1